
NOTE: Before the pumpset/discharge riser
assembly is completely inside the pump housing,
Ca
tur
at the pumpset/discharge riser is
19.
tralian
NO
ele .
b)
to avoid
seal to hex nipple.
be fitting to 3/4"(F)
f)
g)
n tag over
ure 7
an ds.
T
24 ead to the conduit to
NO
tur
8.Coil the leads in the Junction Box.
remove the adhesive tape holding the cathodic
insulation gasket to the pump housing cover.
refully fit the cathodic insulation gasket to the
ret cover.
17.Fit pump housing cover to turret cover with
appropriate cathodic insulators/washers for bolts
and nuts. Align marks on pump housing cover and
turret cover. The seal between the pump housing
cover and the turret cover must be gas tight.
18.Check th
electrically insulated from the tank. If not insulated,
rectify as required.
Determine basic location and orientation of Junction
Box, DPS etc. Based on this determination,
assemble Electrical Fitting Kit (Aus
Certification only) and DPS as follows:
TE: Do not use tape or sealant on NON-GAS
ctrical connections
a) Remove Junction Box cover.
Fit DPS to Junction Box (For Junction Boxes
which are not fitted with a 1/2" NPT(F) thread, use
adaptor supplied) Take care when fitting
damaging electrical leads.
c) Fit 25mm hex nipple to Junction Box.
d) Fit 25(F)M side of wire
e) Fit 3/4" NPT compression tu
NPT side of wiring seal.
Fit 25mm plug/s to unused Junction Box port/s.
Fit 25mm barrier gland to Junction Box.
20.Fit duplicate pumpset/motor identificatio
motor leads and over conduit as shown in Fig
21.Remove adhesive tape from wire protection tube
d slide tube off motor lea
22.Slide wire protection tube half way into
compression fitting. See Figure 7 3/4" NP
23.While holding the wire protection tube in place,
carefully slide the motor leads through the wire
protection tube and into the Junction Box.
.Test the resistance from each l
ensure that they are electrically insulated. Rectify
any fault as required.
25.Mount Junction Box to insulated support bracket if
required.
TE: If Junction Box requires a support
bracket, this must be electrically insulated from the
ret cover and tank.
26.Trim excess wire from motor leads and DPS leads
(leave adequate length for connection without
tension).
27.Individually cap the free ends of the leads with
insulating tape ensuring that the cores are covered.
2
29.Fit cover and gasket to Junction Box.
3.2 arge Pipe Fittings.8 Disch
1. A DN25 (min) full bore pneumatically actuated
ball valve is required immediately downstream of
the Discharge Riser to isolate the discharge line.
25 (min) branch is
required for connection to the EBSRAY Inline
3.
4. T with a 'Tee'
2. After this ball valve, a DN
RV18-NRV Bypass Valve.
A port is required in the discharge line to accept an
isolation valve. This valve is for isolation of the
pressure gauge and the high pressure side of the
DPS.
he line from the valve must be fitted
arrangement to connect to a 0-2500kPa (0–25
Bar) pressure gauge and to the high pressure side
of the DPS via a 1/4" OD SS tube.
3.2 S (Differential Pressure Switch).9 DP
1. Fit the high pressure side 1/4" tube as mentioned
in 4 above.
A low pressure side (vapour pressur
2. e) port must be
ver. This
port is required to accept a valve for isolation of the
of the DPS.
as
ins
provided through the Pump Housing Co
pressure gauge plus the 1/4" tube fitting for the low
pressure side
3. The line from the valve must be split with a 'Tee'
arrangement. One side of the 'Tee' feeds an inlet
pressure gauge (0-2500 kPa) (0 – 25 Bar) and the
other side feeds the low pressure side of the DPS
via a 1/4" OD SS tube.
NOTE: If positioning any components other than
stated above, ensure that they are electrically
ulated from the turret cover, tank etc.
3.2.10 Bypass Valve
1. Fit Bypass Valve into bypass line ensuring correct
orientation i.e. flow is 'IN' from pumpset discharge
line and 'OUT' returns to tank.
2. Flow from Bypass Valve returns to tank vapour
space via a DN25 (min) line. A DN25 (min) full bore
pneumatically actuated ball valve and a DN20
(min) excess flow valve are also required to be
fitted to the bypass line.
3. The Bypass Valve return line must be electrically
insulated from the tank/turret cover. A hydrostatic
relief valve must be fitted in this line as the Bypass
Valve RV18 NRV is also a back-check valve.
3.2.11 PPV VALVE (Positive Pressure Ventilation
™
Valve)
A. ation
50 the underside of the turret cover and
NO
pos
the
the
Internal Mounting: The EBSRAY PPV™Valve
'Internal Mounting Kit' is intended for install
inside the tank, but outside the pump housing wall.
Ensure that the inverted 'U' tube is no more than
mm from
remains in the vapour space of the tank at all
times. A secondary shut off valve must be installed
between pump housing and the PPV™Valve and
must be operable from above the turret cover.
TE: PPV
™
Valve must be mounted in a vertical
ition with the arrow pointing up and away from
pump housing. i.e. flow path is only out from
pump housing, into the tank vapour space.
B External Mounting: Alternate 'External Mounting'
is possible (e.g. retrofits to existing equalisation
pipes). However, it is still critical to ensure that
PPV™Valve is mounted vertically and that the
arrow points up and away from the side connected
to the pump housing. i.e. flow path is only out from
the pump housing, into the tank vapour space.
9