
GB CBA-030
2
123456789
10 11 12 13 14 15 16
,4
,8
,2
,6
,0
,4
,8
,2
,6
,0
246810 12 14 16 18 20 22 24 26 28 30 32
,4
,8
,2
,6
,0
,4
,8
,2
,6
,0
OPERATION
Automatic charging n three phases:
•3A rap d charge (current control), unt l 13,4 V (26,8 V) s reached n the battery.
•Intermed ate charg ng v a voltage control, unt l 13,5 V (27 V) s reached n the
battery.
•Charge ma ntenance us ng a very low current value, but suff c ent to ma nta n
the voltage value at 13,5 V (27 V).
The green indicator (LED) s only l t when the follow ng cond t ons happen at the
same t me:
•ma ns on;
•battery voltage above 65% (+/- 10%) of nom nal value.
The red indicator (LED) s only l t when at least one of the follow ng cond t ons
happens:
•battery voltage above 65% (+/- 10%) of nom nal value;
•polar ty nvers on;
•battery term nals short-c rcu t.
If there s overload ng of the remote repet t on term nals or f there s a ma ns
fa lure, both of the nd cators w ll rema n unl t.
The remote signals repetition s ava lable on term nals 11, 12 and 14:
The load connected between term nals 11 and 12 s suppl ed when the
green nd cator s l t;
The load connected between term nals 11 and 14 s suppl ed when the red
nd cator s l t;
Measures in accordance with CEI-EN60335-2-29
Continuous line = initial characteristic
Broken line = work characteristic
T PICAL LOAD CURVES