
- 8 -
The button on the front of the meter is intended to change the
displayed parameters. In the case of a power failure, pressing
the button will activate the display for a few seconds and enable
an emergency reading of energy consumption.
1.Disconnect the power supply.
2.Mount the indicator on the rail in the distribution box.
3.Connect the neutral wire to terminal N.
4.Connect the input phase to terminal 1.
5.Connect the measured circuit or single receiver to terminal 3
(output phase L) and to N.
6.Connect terminals 23, 24 and 25 to the RS-485 network.
Program for test reading of the counted energy value and for
basic settings of the meter parameters.
Available at www.fif.com.pl (on the device’s subpage).
For communication of the meter with the computer, the USB
CN-USB-485 converter or any RS-485/USB standard is required.
installation 2-wire
rated voltage 230 V AC
minimum measured current 0.02 A
base current 0.25÷5 A
maximum current 100 A
voltage measuring range 100÷289 V AC
measurement accuracy (EN50470-1/3) class B
Mounting
LE Config service programm
Technical data