
INSTALL INSTRUCTIONS
SCL SERIES - SOLAR LED AREA LIGHT
Document 70-0017 11 March 2019
©Copyright First Light Technologies
www.firstlighttechnologies.com
info@firstlighttechnologies.com
PRIOR TO INSTALL
Ensure install location has a minimum of 2 to 3 hours of
direct midday sun exposure for best performance. Install
footing and pole as per specifications. Please handle fixture
with care as scratches will affect appearance and powder
coat durability.
TOOLS REQUIRED
•1/8 inch hex key
•5/32 inch hex key with torque wrench
TO INSTALL
UNPACK MOUNTING ARM. Remove
mounting arm from box and remove
packing material.
REMOVE MOUNTING BOLTS FROM
MOUNTING ARM.Remove mounting
bolts using 5/32” hex key.
3. DRILL HOLES IN POLE.If pole is not pre-
drilled, drill holes in pole as shown. Note:
The .50 inch hole is for a ground wire and is
optional.
4. ATTACH MOUNT TO POLE.Insert backing
plate into pole and thread bolts fully into
backing plate through the mounting arm.
Ensure flat side is placed against the inner
surface of the pole. Torque bolts to 70 in-
lbs.