PLB SERIES
SOLAR POWERED LED BOLLARD
DO NOT REMOVE CARDBOARD FROM THE HEAD ASSEMBLY UNTIL PRODUCT IS CONNECTED AND
INSTALLED.
HANDLE WITH CARE, COATING IS A LONG LASTING FINISH, HOWEVER SCRATCHES OR DAMAGE TO
POWDER COAT WILL AFFECT PRODUCT APPEARANCE AND DURABILITY.
USE CAUTION WHEN HANDLING 6V 8AH BATTERY TO AVOID SHORT CIRCUITING THE TERMINALS.
First Light Technologies www.FirstLightTechnologies.com
Victoria, BC Canada
V8T 5H1 250.590.5774
Document 70-0004 12.SEP.13 © Copyright First Light Technologies Ltd.
IMPORTANT: PLEASE READ THE FOLLOWING INSTRUCTIONS PRIOR TO INSTALLING PLB SERIES BOLLARD.
INSTALLATION PROCEDURES
1. Install bollard in an area with good sun exposure.
2. Install (3) supplied anchor bolts in concrete foundation using template provided. Ensure bolts project a
maximum of 1.75” above concrete surface.
3. Remove the mounting plate from the product and install onto anchor bolts positioning the washers
and nuts above and below the mounting plate as pictured in the diagram. Use these fasteners to level
the mounting plate then secure in position by tightening the nuts.
4. Install pole over mounting plate and install (3) ¼-20 screws loosely until each fastener is aligned to
its’ mounting hole, and then tighten.
5. Remove the head assembly (with cardboard cover attached) from the pole.
6. Remove the battery from product packaging.
7. Use the strap to secure battery to the bracket.
8. Connect the battery harness to the connector on the back of the battery bracket.
9. Once battery is connected, LED’s will turn on for 1 minute. The unit is now functional.
10. Install the head assembly onto the pole and secure into place with (3) washers and (3) ¼-20 bolts
and tighten evenly. For asymmetrical distribution ensure correct LED orientation as shown below.
11. Remove cardboard cover from head assembly.
Asymmetrical Option