FoxESS LV54 User manual

Quick
Guide
Installation
LV54 quick Installation guide
The following tools will be required to install the battery.
Screw driver Crimping modular Safety shoes
Safety goggles Plier
Ribbon
1. Tools Required
2. Packing List
Please check if following items are including with the package:
A B
G H
IJ
No. Description No. Description
3. Battery Terminals
STEP-1:
Fix the pegboard on the wall and mark the position of the five holes
with a marker.
Position Suggested size
Left >300mm
Top
Bottom
4. Installation Steps
STEP-2:
STEP-3:
Install the expansion tube in the hole and fix the pegboard with
self-tapping screws, then pre-lock the M5*70 screws on both
sides (pre-lock depth <15mm).
5. Wiring Steps
1. Use only the parts included with the battery pack to ensure proper
or your distributor.
installation. If anything is damaged or missing, contact manufacturer
K: In order to match different inverters, two kinds of communication cables
(RS485 & CAN) are provided with the package.The battery side plug is
already crimped, the inverter side please refer to inverter's manual for
the pin definition.
Note:
2. Select a communication cable (CAN/RS485) based on the actual
inverter interface type
Please plug into the PCS
port of the
Please plug into the RS485
RS485 ( Inverter side)
RS485 (Battery side)
CAN(Battery side) CAN(lnverter side)
K-1
rter
rt
K-2
Pin
1
2
3
4
5
6
7
8
Definition
NC
NC
RS485-A
RS485 (Battery side) Pin definition:
NC NC
RS485-B
NC
NC
AB C
D E F G H
I
Description
C 5+5 Expansion Tubes&
Expansion Screws
D 4 Set screw
Plug(to short pin1 and pin6)
E
F
2
2
Earth Terminal
Pin
1
2
3
4
5
6
7
8
Definition
NC
NC
NC
CANL
CANH
NC
NC
NC
Please plug into the PCS
Please plug into the CAN
CAN (Battery side) Pin definition:
A
B
C
D
E
F
G
H
I
SOC LED
STATUS LED
POWER SWITCH
LINK OUT
LINK IN
PCS_1
PCS_2
Ground screw
POWER
Communication Network Cable(3m)
Ground Wire(3m)H 1
Quick Installation Guide
K 1+1 Communication Network Cable (3m)
(Inverter to Battery)(RS485&CAN)
C D E F
STEP-4:
Hang the battery over the bracket, move the battery close to it,
lower the battery, and make sure the 2 mounting bars on the back
are fixed well with the 2 grooves on the bracket.
Drill holes with electric drill, make sure the holes are deep enough
(at least 50mm) for installation, and then tighten the expansion
tubes.
K
J 1 Power Line(3m)
Right >300mm
>300mm
<100mm
Safety gloves
Spanner Multimeter
Electric Drill
Track Level Bar
A 1 Battery
In the
Batterry
Package
Bracket1B
1I
Note: The definition of the inverter side end plug needs to be crimped in
accordance with the inverter's manual.
1G
Note
Object Quantity
2.2~2.7
M6
<
Wall mounting:
Standing mounting:
Inverter
junction box
Note:junction box not included in the package and need
separate purchase.
Inverter
junction box
Left side Front Right side

Press and hold the Power button for more than 2s, the battery light
will flash once, then the LED will light up in turn, and when the top most
running light flashes fast for about 10 times, it means that the system
parallel programming is successful and the battery is running normally.
6. System Start Up
STEP-1:
After installing the fixed battery, measure the voltage of the
STEP-2:
To connect the parallel communication cable between the
batteries, the LINK IN of the Master battery, i.e. the first machine,
needs to be plugged in with a plug (to short pin1 and pin6),
the LINK OUT interface uses a parallel communication cable
V1.0.6
10-203-00311-01
Please scan the QR Code and follow the steps below to download our
replace the battery.
to determine whether there is a voltage output, and if so,
positive and negative terminals of the battery with a multimeter
STEP-3:
Connect the BAT+ and BAT- of the battery to the input of the
junction box (not included in the package), and then connect the
output of the junction box to the inverter; connect one of the
Note: the length of the power line needs to be the same when
(pin to pin network cable) to the LINK IN interface of the next
battery, and so on, and the last LINK OUT interface is plugged in
with a plug (to short pin1 and pin6).
in parallel mode.
Stand-alone mode:
STEP-1:
After installing the fixed battery,
measure the voltage of the positive and negative terminals of
the battery with a multimeter to
determine whether there is a
voltage output, and if so,
STEP-2:
Plug the 2 plugs (to short pin1
and pin6) into the parallel
communication interface LINK IN and LINK OUT of the battery
respectively.
STEP-3:
Connect the BAT+ and BAT- of the battery to the corresponding
positive and negative terminals of the inverter; connect one of the
communication interface PCS of the battery to the interface of the
communication between the inverter and the battery; connect the
ground wire.
replace the battery.
Parallel mode:
Note: Different model of batteries cannot be mixed in one system,
any further questions related to the battery versions please
Connect the ground wire of each battery.
Lead-acid function:
Battery capacity (Ah)
In the above two modes, when operating according to the
corresponding steps, the communication harness between the
battery and the inverter is not connected, and the battery enters
the lead-acid function by default; Both stand-alone mode and
parallel mode have lead-acid function.
When the battery uses the lead-acid function, the matching
inverter needs to be set to lead-acid mode as well, and the
following parameters need to be set on the inverter:
Charging voltage (V)
Charging protection voltage (V)
Float voltage (V)
Maximum charging current (A)
Discharge cut-off voltage (V)
Maximum discharge current (A)
Forced charging voltage (V)
Battery internal resistance (mΩ)
Note: Under the lead-acid function, the battery does not
communicate with the inverter, and the inverter will not display the
SOC information of the battery.
Note: Parallel mode supports up to 4 batteries in parallel.
Master battery Last battery
communication interface PCS of the Master battery to the interface
of the communication between the inverter and the battery;
104
57.0
57.6
53.0
50
51.0
100
50.0
15

附:制作要求
100G双胶纸双面黑白打印,展开尺寸:210*297mm,折叠尺寸105*74.25mm
横向压一道竖向压三道,折叠正面朝上。
Other FoxESS Batteries Pack manuals
Popular Batteries Pack manuals by other brands

Victron
Victron Pylontech UP2500 manual

Welcat
Welcat HBC-51 instruction manual

National Instruments
National Instruments NI HDD-8265 installation guide

XD COLLECTION
XD COLLECTION Sunwick XD P322.39 Series manual

BMZ
BMZ Downtube Battery V10 Original operating instructions

TheSunPays
TheSunPays BALI48 user manual