
ii
TABLE OFCONTENTS
1. SYSTEM CONFIGURATION........................................................... 1
2. EQUIPMENT LISTS ........................................................................ 2
3. MOUNTING THE EQUIPMENT
3.1 Mounting the Hull Unit .................................................................................................4
3.2 Mounting the Display Unit............................................................................................9
3.3 Mounting the Transmitter Unit....................................................................................10
3.4 Mounting the Interface Unit ........................................................................................10
3.5 Grounding the Equipment ........................................................................................... 11
4. WIRING
4.1 How to Use the Crimping Tool, Pin Extractor ............................................................12
4.2 Location of Connectors, Terminal Boards ..................................................................13
4.3 Assembling Connectors at Transmitter Unit ...............................................................14
4.4 Connection of Transducer Cable ................................................................................. 16
4.5 Attaching Power Cable Connector NCS-253P............................................................17
4.6 Synchronizing Transmission with Other Sonars, Echo Sounders ...............................17
5. CONNECTION OF INTERFACE UNIT CS-120A
5.1 Connections for True Motion and Target Lock ...........................................................18
5.2 Connections for ES Picture and FNZ Markers............................................................19
5.3 Connections for Digital Readout of Position, Water Temperature and Depth ............20
5.4 Wiring..........................................................................................................................21
6. CHANGING POWER SPECIFICATIONS.......................................24
7. INSTALLATION OF FRP RETRACTION TANK
7.1 Before Beginning the Installation ...............................................................................25
7.2 Installation of the FRP Retraction Tank ......................................................................26
8. ADJUSTMENT AND CHECK
8.1 Hull Unit Check ..........................................................................................................28
8.2 Heading Adjustment....................................................................................................29
8.3 DIP Switch Setting ...................................................................................................... 30
8.4 Setting and Adjustment on the Interface Unit CS-120A ............................................. 31
9. WHEN SHIP’S MAINS IS 24 VAC..................................................34
ACCESSORIES/SPARE PARTS/INSTALLATION MATERIALS.........A-1
OUTLINE DRAWINGS..............................................................................................D-1
SCHEMATIC DIAGRAMS....................................................................................... S-1