1.The content of this document is continually reviewed and amended, where necessary. Growatt reserves the right to make changes to the
material at any time and without notice. Unless otherwise agreed, this document is for quick installation guidance only. All information and
suggestions in this document do not constitute a warranty of any kind, express or implied. Growatt reserves all rights for final explanation.
2.This document is for quick installation guidance only. For details, please refer to the User Manual.
3.Machine damage caused by failure to follow the instructions is not covered under any warranty.
1.When determining the installation position of the inverter, please consider the position of the batteries and the distribution panel.
2.For export limitation, you are advised to connect an energy meter and current transformers to the inverter.
When drilling holes, avoid the
water pipes and power cables
buried under the ground.
Please prepare the cables listed below before electrical connections.
123
4
1.Make sure all switches are
OFF before connecting the
cables. For personal safety, do
not operate when power-on.
2.If the diameter of the cable
does not match the terminal, or
the cable is aluminum wire,
please contact our after-sales
personnel.
Battery BOX
Quick Installation Manual WIT 50-100K-AU Quick Guide
≥1000mm
≥1000mm ≥1000mm
≥1
0
0mm
0
399.5mm
574.5mm When drilling holes, avoid the
water pipes and power cables
buried under the ground.
1
1
After cables are connected,
apply fireproof mud to the
waterproof silicone mat
inside the AC junction box.
Lock the cover of the AC
junction box after the
fireproof mud is applied.
5
1.
Overview
(12)BMS power supply port (13)GRID terminal
(14)LOAD terminal (15)Base
(1)Front panel (2)OLED display screen (3)Battery status indicator (4)Push button
(9)USB port
(5)System indicator
(6)BMS communication port (7)Parallel communication port (8)Monitor communication port
(10)Network communication port (11)Battery terminal
Notes:
2.
Installation
System overview 2.1 Installation requirements
2.2 Floor-mounted installation
2
3.
Connecting cables
3.1 Grounding 3.2 AC GRID and UPS output connection
Notes:
Notes:
A multiple-core copper cable (yellow and
green)
A multi-core copper cable
A single-core copper cable (red and black)
A multi-core copper cable
Other communication cable
Notes:
3
Notes:
Notes:
Φ12mm
(0.47'')
70mm(2.76'')
0.1m
0.1m
678 9 10 11 12 13 14 15
Primary Load
Secondary Load
Bypass
Breaker
T
Grid
Breaker
Grid
Load
Breaker
Meter
Phone
BAT
PCS
3.3.2 Connecting the BMS power supply cable
3.3 Connection on the battery side
18-20 mm
1
3.3.1 Connecting the battery power cable
Notes:
1. Before installing the battery terminals, please
ensure that the battery input voltage and current are
within the acceptable range.
2. When installing battery terminals, identify the
positive and negative terminals and connect them to
the inverter according to the color convention.
3. When connecting the terminals, ensure that you hear
a "click" sound. Please gently pull back the battery
cables to ensure a secure connection.
BMS power supply port description
2 3
4
234
5
100.0K W
Output Power