manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. GST
  6. •
  7. Smoke Alarm
  8. •
  9. GST DI-M9101 User manual

GST DI-M9101 User manual

30309580 Issue 1.08
Features
Address can be set in field.
Fault self-diagnostic.
Reed switch testing.
Built-in MCU can store 14 history messages. .
Remote indicator output available.
Polling LED can be set to close.
2 levels smoke sensitivities programmable, complies with
UL268. Heat part complies with UL521.
Description
DI-M9101 Intelligent Combination Heat Photoelectric Smoke
Detector integrates photoelectric detection and fixed temperature
detection technology by combining smoke sensor and
semi-conductor heat sensor in mechanism and circuitry structure.
Just because of the combination of smoke detection and heat
detection, it not only overcomes the disadvantage that detectors
using common infrared scattering technology are insensitive to
black smoke with small particles, but also can pick up fire with
obvious rise of temperature such as alcohol flame, thus extending
its application range.
Connection and Cabling
Fig. 1 shows the detector bottom and Fig. 2 DB-M01 base.
5
45
75
Cable Entry
Mounting
Hole
Fig. 1 Fig. 2
Please install the base according to following steps:
1) Locate mounting holes on the rubber layer of the base
according to the holes on the back box, and punch the holes
with a screwdriver.
2) Count the number of cables needed and punch correct
quantity of holes with a screwdriver on the rubber layer.
Thread the cables through the cable entry holes.
3) Install the base onto the back box with screws.
Warning: Do not punch mounting holes and cable entry holes
bigger than needed. Do not punch more holes than needed.
There are four terminals with numbers on the base.
1&3: Loop connection (polarity-insensitive)
2: Positive terminal of remote indicator
4: Negative terminal of remote indicator
The system connection is shown in Fig. 3.
Remote Indicator
-
+
LOOP OUT
Addressable Detector Remote Indicator
Addressable Detector
+
-
LOOP IN
Fig. 3
Recommended Cabling
1.0mm2or above fire cable is recommended, laid through metal or
flame-retardant conduit, but subject to local codes. Different color
cables for remote indicator are used to avoid wiring mistake.
It can connect with UL certificated intelligent control panel from our
company.
Installation
Refer to D Series Detector Application Bulletin for additional
installation instructions.
A fixed installation direction is ensured by the location elements on
the detector and the base. Fix the base with two tapping screws,
and then align mark A on the detector with B on the base, rotate the
detector to align mark A with mark C (Refer to Fig. 1 and 2 for the
position of the marks), the detector will be fitted to the base.
Fig. 4 shows the installation of the detector.
54.5mm
Electrical Box
Conduit
Base
Detector
Fig. 4
Application
Fixed temperature and level 2 are default. The detector can be
addressed, read or written in field by using P-9910B programmer.
In power-on state, input unlocking password and press Clear to
unlock. Press Function, then press “3”, the screen shows “_” at the
last digit.
Input corresponding sensitivity or parameter and press Program, the
screen will show a “P”, the corresponding sensitivity or parameter is
programmed. Press Clear to clear the "P". Input locking password
and press Clear to return.
Parameters set using programmer
Input Parameter
of a Detector
Smoke
Sensitivity
Heat Part
Polling LED
1
1
Fixed
Normal
2
2
Fixed
Normal
129
1
Fixed
OFF
130
2
Fixed
OFF
Read Sensitivity Level: in power-on state, pressing Test,the screen
displays address of the detector. Pressing “Up”,display sensitivity
level, device type and initial sensitivity in turns.
Testing
Before testing, please ensure that the detector has been
installed correctly and powered up. After 10 seconds, testing
begins.
Before testing, notify the proper authorities that the system is under
maintenance and will temporarily be out of service. Disable the
automatic controls relating to the zone or system under
maintenance to avoid unwanted actions.
All detectors must be tested after installation and periodically
thereafter. Testing methods must satisfy the Authority Having
Jurisdiction (AHJ). Detectors offer maximum performance when
tested and maintained in compliance with NFPA 72. The detector
can be tested in the following way:
1) Reed Switch Testing
Magnetic test zone is shown in Fig. 5. Put the magnet of
commission tool close to that of the detector and hold on for a few
seconds until the detector generates alarm.
DI-M9101 Intelligent Combination
Heat Photoelectric Smoke Detector
30309580 Issue 1.08
Test Zone
Fig. 5
2) Smoke entry test
The Trutest model 300 Aerosol Smoke Detector Tester can be
used for smoke entry testing. Set the generator to represent 4%/ft
to 5%/ft obscuration as described in the Trutest manual. Using the
bowl shaped applicator, apply aerosol until the panel alarms.
Additionally, canned aerosol simulated smoke (canned smoke
agent) may be used for smoke entry testing of the smoke detector.
Recommended aerosol smoke products are:
Manufacturer
Model
Trutest
AERO400
When used properly, the canned smoke agent will cause the
smoke detector to go into alarm. Refer to the manufacturer’s
published instructions for proper use of the canned smoke agent.
Warning: Canned aerosol simulated smoke (canned smoke
agent) formulas will vary by manufacturer. Misuse or overuse of
these products may have long term adverse effects on the
smoke detector. Consult the canned smoke agent
manufacturer’s published instructions for any further warnings or
caution statements.
3) Temperature rise test
Approach a heater (such as a hair drier of 1000w-1500w) to the
thermistor of the detector until it alarms. It is 12 inches between the
hair drier and the thermistor to avoid damaging on the plastic
enclosure of the detector
If a detector fails in testing, replace it. After testing, reset the
detector. Notify the proper authorities that the system is back to
normal operation.
Maintenance
Clean the detectors regularly, at least once a year to ensure
normal operation of the system.
If unwanted alarms are often found of the detector on site, the
sensing chamber should be cleaned. Power must be removed
from the detector before cleaning.
Steps for chamber cleaning:
a) Open the top cover of detector, and draw out the sensing
chamber by slightly lifting its two sides using a straight
screwdriver, as shown in Fig.6.
Fig. 6
b) Use a vacuum cleaner or cleaned, compressed air to
remove dust and debris from the insect guard and the
sensing chamber. The sensing chamber can also be
cleaned by clear water and brush. Put the sensing
chamber in clean water to brush the dust inside and take
out to dry it.
c) Put back the chamber and the top cover.
Cautions
1. Dust covers can’t be removed until the project is put into use
formally. Take well care of dust covers for future use.
2. Dust covers effectively but not absolutely prevent dust
particles from going into detectors. So, we recommend that
detectors should be removed prior to construction, decoration, or
other activities producing dust. The proper authority should be
informed of detectors removing.
3. Be careful not to damage the detector in maintenance.
4. The smoke detector may not sense fire that where smoke
cannot reach it, such as in chimneys, in walls, on roofs, or on the
other side of closed doors.
5. The detector cannot monitor the place beyond protection area.
6. The detector may not warn you about fires caused by
insufficient safety measures, violent explosions, leaking gas,
improper storage of flammable materials like diluents and other
safety hazards, arson or children playing with fire.
7. The alarm of a smoke detector used in high velocity
environment will be delayed due to dilution of smoke by frequent
and fast airflow.
8. The smoke detector cannot last forever. In order to keep the
detector working in good condition, please maintain the equipment
continuously according to recommendations from manufacturers
and relative state standards.
9. The detectors must be tested regularly, at least once a year.
10.The base should be fastened and the wire should be connected
reliably.
11.Fire LED of the detector should face the main entrance where
people can watch it easily.
12.Smoke detectors are not to be used with detector guards
unless the combination has been evaluated and found suitable for
that purpose.
Specification
Operating Voltage
loop 24V (16V - 28V)
Standby Current
≤0.8mA
Alarm Current
≤1.8mA (without remote indicator)
≤3.8mA (with remote indicator)
Fire LED
Red. Flashes in polling, and illuminates in
alarm
Remote Indicator
Output
Polarized output. Directly connect to remote
indicator (built in 10k resistor in series,
output current is 2mA); Flash in alarming
and do not illuminate in normal.
Programming Method
Electronically programming
Code Range
one address within 1 - 242
Wiring
Non-polarized 2-core for loop.
Polarized 2-core for remote indicator.
Setting of sensitivity
and range
Level 1: 1.23% - 2.7% per ft
Level 2: 2.0% - 3.89% per ft
Maximum spacing
(When Used as a
Heat Detector only)
50 ft. (15.2 m)
Action Temperature
135°F(57.2°C)
UL Temperature
Range
32°F (°C) - 100°F (37.8°C)
0 - 95%, non-condensing
Operating
Temperature
14°F (-10°C) - 122°F (+50°C)
0 - 95%, non-condensing
Ingress Protection
Rating
IP2X
Dimensions
Diameter: 100mm
Height: 54.5mm (with base)
Mounting Hole
Distance
45mm - 75mm
Weight
About 110g
Accessories and Tools
Model
Name
Remark
P-9910B
Hand held programmer
Order separately
DB-M01
Base
Order separately
T-MT
Commission Tool
Order separately
C-9314P
Remote Indicator
Order separately
BP-9314P
Back Plate for Remote
Indicator
Order separately
Limited Warranty
GST warrants that the product will be free of charge for repairing or
replacing from defects in design, materials and workmanship during
the warranty period. This warranty does not cover any product that is
found to have been improperly installed or used in any way not in
accordance with the instructions supplied with the product. Anybody,
including the agents, distributors or employees, is not in the position
to amend the contents of this warranty. Please contact your local
distributor for products not covered by this warranty.
This document is subject to change without notice. Please contact GST for more information or questions.
Gulf Security Technology Co., Ltd.
No. 80, Changjiang East Road, QETDZ, Qinhuangdao, Hebei, P. R. China 066004
Tel: +86 (0) 335 8502434 Fax: +86 (0) 335 8502532 [email protected] www.gst.com.cn

Other GST Smoke Alarm manuals

GST DI-9101E User manual

GST

GST DI-9101E User manual

GST DC-9102 User manual

GST

GST DC-9102 User manual

GST DI-M9102 User manual

GST

GST DI-M9102 User manual

GST I-9102 User manual

GST

GST I-9102 User manual

GST I-9102 User manual

GST

GST I-9102 User manual

GST C-9102 User manual

GST

GST C-9102 User manual

GST C-9202 User manual

GST

GST C-9202 User manual

GST C-9403 Operator's manual

GST

GST C-9403 Operator's manual

GST I-9301 User manual

GST

GST I-9301 User manual

GST DC-9101E User manual

GST

GST DC-9101E User manual

GST DC-9101 IS User manual

GST

GST DC-9101 IS User manual

GST D Series User guide

GST

GST D Series User guide

GST DC-9101 IS User manual

GST

GST DC-9101 IS User manual

GST DC-M9101 User manual

GST

GST DC-M9101 User manual

GST C-9101 User manual

GST

GST C-9101 User manual

GST I-9102 User manual

GST

GST I-9102 User manual

GST DC-M9102 User manual

GST

GST DC-M9102 User manual

GST S-9102R User manual

GST

GST S-9102R User manual

GST DC-9101 User manual

GST

GST DC-9101 User manual

GST C-9101 User manual

GST

GST C-9101 User manual

GST DC-9204 User manual

GST

GST DC-9204 User manual

Popular Smoke Alarm manuals by other brands

A-Collection KD-122LA installation instructions

A-Collection

A-Collection KD-122LA installation instructions

WOOX R7049 quick start guide

WOOX

WOOX R7049 quick start guide

Chubb 24/7 FIRE PROTECTION FP301 manual

Chubb

Chubb 24/7 FIRE PROTECTION FP301 manual

DSW DSW98A user manual

DSW

DSW DSW98A user manual

Lexing LX-SO-98A-D user manual

Lexing

Lexing LX-SO-98A-D user manual

Kidde 910 user guide

Kidde

Kidde 910 user guide

Visonic MCT-426 installation instructions

Visonic

Visonic MCT-426 installation instructions

EL EL-4703 installation instructions

EL

EL EL-4703 installation instructions

Quell Simline QSP10 manual

Quell

Quell Simline QSP10 manual

First Alert 100S user manual

First Alert

First Alert 100S user manual

Kidde PI9010 user guide

Kidde

Kidde PI9010 user guide

Quell QC1500 user manual

Quell

Quell QC1500 user manual

Ebode eSD18 user guide

Ebode

Ebode eSD18 user guide

System Sensor INNOVAIR DH100LP Installation and maintenance instructions

System Sensor

System Sensor INNOVAIR DH100LP Installation and maintenance instructions

Kidde 916 user guide

Kidde

Kidde 916 user guide

First Alert SA320CN Specifications

First Alert

First Alert SA320CN Specifications

Kidde i12060CA Manuals

Kidde

Kidde i12060CA Manuals

Mobeye CM2400 user manual

Mobeye

Mobeye CM2400 user manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.