Halton EcoloAir 3000CFM User manual

Installation Manual
for Ecology
Manual provides
Installation Instructions
Form#: OM021_ECOLOGY
Date: 05-2017 - Rev 5
Installation Instructions
Installation Instructions
Installation Instructions
EcoloAir Unit
3000CFM, 4000CFM, 5000CFM, 6000CFM, 8000CFM,
10000CFM, 12000CFM, 15000CFM, 18000CFM,
20000CFM, 24000CFM, 28000CFM, 32000CFM,
36000CFM, 40000CFM
UL 1978 “Standard for Grease Ducts”, UL 710, “Exhaust Hoods for
Commercial Cooking Equipment”, ULC-S647-05 and/or UL197
ENSURE ELECTRICAL SUPPLY CONFORMS WITH ELECTRICAL CHARACTERISTICS
SHOWN ON THE RATING PLATE, AND N.E.C. REQUIREMENTS.
THE INSTALLATION OF THE HOOD AND DUCT WORK LEADING TO AND EXITING THE
ECOLOAIR SYSTEM TO BE INSTALLED IN ACCORDANCE WITH NFPA 96 AND LOCAL
CODES.

2
EcoloAir Installation Manual
OM-021/052017/rev5/EN
Filter Module
Odor Reducing
Module
Fan Module
Read this entire manual before beginning installation. Contact the factory with any questions you may
have after you have read these instructions. See the contact information at the end of this manual.
This illustration shows the relationship between the two major modules of the EcoloAir system. The
Odor Reducing Module is standard combined with the Filter module. It may be ordered optionally as a
separate module or may be ordered without Odor Reduction. A charcoal filter module may replace the
Odor Reducing Module as an option. The modules may be installed together or separated by ductwork.
The connecting ductwork between modules, if used, must be 16 gauge liquid tight construction
conforming to the standards described in NFPA 96. The ductwork must be fastened to the modules
according to the instructions and methods described in that standard and in local codes. If modules are
installed connected directly together the mating flanges are pre-drilled through for machine screws (1/4”
x 20) and nuts. The gasket which must be placed on the mating flanges between modules is factory
pre-cut to length and is shipped inside the odor reducing module cabinet. If the unit does not have
an odor reducing module the gasket material is shipped inside the fan module. The gasket material is
self-adhesive, peel off the protective paper and place along the mating flanges. Be sure the fasteners
which hold the sections together will pass through the approximate centerline of the gasket. See
section below labeled “DUCT CONNECTIONS” for details about inlet and exhaust duct connections.
NOTE: When required, equipment shall be seismically restrained per SMACNA and Uniform Mechanical
Code. Fabricated support platforms for roof-mounted equipment shall be sized to accommodate the
equipment frame and engineered to support the unit’s weight indicated on submittal drawings and the
weight of associated components such as ductwork, per local and International Mechanical Code (IMC)
requirements. Support pads or curbs should be fabricated to fit actual equipment. Verify measurements
of equipment frames are accurate before construction of support pads or curbs. The foundation should
be flat and level from side to-side and front-to-back. Equipment may be anchored using provided
mounting tabs, or by other means which satisfies local and IMC codes. All support pad or curb
engineering, design and construction is the responsibility of purchaser, contractor or assigned second
party. Halton cannot provide engineering or design for equipment pads, curbs or supporting structures.
Note: 30” of clearance must be maintained on the access door side of each module to allow maintenance
access and service to filters, odor control solution, carbon filter and fan motor/blower components.
Please ensure there is adequate clearance in installation location.
Note: Fire suppression at inlet of filter section must be used based on local fire code requirements.
If fire suppression cabinets are factory installed on the unit 36” of clearance must be maintained on
the fire suppression cabinet side of the unit, which is usually on the side of the unit opposite the filter
access doors.

3
EcoloAir Installation Manual
OM-021/052017/rev5/EN
FIGURE 1
FIELD CONNECTION OF FILTER AND FAN MODULES
FIGURE 1A
DRAWING FOR: FILTER MODULE TO FAN SECTION OR
FILTER MODULE TO ODOR CONTROL TO FAN SECTION

4
EcoloAir Installation Manual
OM-021/052017/rev5/EN
ELECTRICAL CONNECTIONS
1. The main power supply to the EcoloAir control panel connects to the line voltage terminal block in the
control panel; the wire size will be determined by the electrical rating on the panel rating plate and must
conform to national electrical standards.
The following electrical connections are to be made between the EcoloAir control panel and various
components. These connections are shown in detail on the wiring diagrams included in installers package.
Job specific voltages and options are detailed on these wiring diagrams and supersede the general
descriptions below.
2. An 8 wire shielded cable runs from the EcoloAir control cabinet to the exhaust fan VFD located at the fan
module. This signal determines the fan speed.
3. The Fan motor is isolated with a three pole disconnect switch, located in the VFD compartment. Incoming
power for the VFD is required to be connected to the L1, L2 and L3 terminals of the disconnect switch.
4. A 6 wire-24 volt DC cable is connected between the EcoloAir control panel and the filter pressure
transducers located in a cabinet on the filter module.
5. A 4 wire-24 volt cable is connected between the EcoloAir control panel and the Cooling Fan start/stop and
the firestat.
6. A 4 wire-24 volt DC cable is connected between the EcoloAir control panel and the odor control module.
(If applicable, the odor control module is optional.)
7. A 3 wire-120 volt/1/60 AC cable is required for the compressor located in the odor control module. (If
applicable, the odor control module is optional.
8. A 2 wire low voltage cable must be run from the EcoloAir control cabinet to the normally open (N.O.) dry
contacts in the fire suppression system cabinet.
A 3 wire low voltage cable is typically run from the N.O. and N.C. contacts of the CR43 relay switch in the
EcoloAir control panel in case of missing filter(s) in order to shut off the supply power and gas to kitchen
appliances. (Optional, this relay is required outside of the U.S.A. but is optional inside the U.S.A.)
9. 9. 2 - 4 low voltage wires are connected between the EcoloAir control panel and the BMS for make-up air
control (Start/Stop and/or 0-10 VDC speed signal).

5
EcoloAir Installation Manual
OM-021/052017/rev5/EN
DUCT CONNECTIONS
1. The exhaust duct connection at the inlet entrance to the EcoloAir system must be continuously welded
all around and liquid tight (See figure 2). Remove all filtration media from the filter module before welding.
Be sure all flammable materials are removed from area before welding on this unit. Take all reasonable
precautions while welding to prevent fire or injury.
2. The duct must be transitioned from its original size to match the full opening of the filter module inlet.
3. All fan outlet openings to which ducts are attached will be provided with a discharge collar (See figure 3).
4. Inlet and outlet openings of the EcoloAir unit are to be transitioned to the appropriate inlet and outlet duct
sizes.
5. Filter module connections to the fan module (See figure 1) must be made as per UL listed procedure. The
provided gasket material must be placed between the modules on the mating flanges. This material is
pre-cut to the correct lengths and is shipped inside the odor reducing module cabinet. If the unit does not
have an odor reducing module the gasket material is shipped inside the fan module. The gasket material
is self-adhesive. Peel off the protective paper and place along the mating flanges. Be sure the fasteners
which hold the sections together will pass through the approximate centerline of the gasket. When the
modules are connected together the mating flanges are pre-drilled through for machine screws (1/4” x 20)
and nuts.
CONTINUOUS WELD
16 GAUGE DUCT TO
ECOLOAIR
ECOLOAIR FILTER
MODULE
END MULLION
CONTINUOUS WELD
16 GAUGE DUCT TO
ECOLOAIR FILTER
INLET UNIT
16 GAUGE NFPA 96
RATED INLET DUCT
ECOLOAIR FAN UNIT
UNIT STRUCTURAL FRAME
END BLANK PANEL
INTERNAL FLEX
CONNECTION
FLANGE COLLAR FOR
DUCT CONNECTION
CONTINUOUS WELD
16 GAUGE DUCT TO
ECOLOAIR
ECOLOAIR FILTER
MODULE
END MULLION
CONTINUOUS WELD
16 GAUGE DUCT TO
ECOLOAIR FILTER
INLET UNIT
16 GAUGE NFPA 96
RATED INLET DUCT
ECOLOAIR FAN UNIT
UNIT STRUCTURAL FRAME
END BLANK PANEL
INTERNAL FLEX
CONNECTION
FLANGE COLLAR FOR
DUCT CONNECTION
FIGURE 2
FIGURE 3

6
EcoloAir Installation Manual
OM-021/052017/rev5/EN
AIR FILTER INSTALLATION
1. Care should be taken to install the filters in the proper sequence. They should be installed in the following
order:
a) Beginning at the exhaust inlet, the first filter (Pre Filter) is the Merv 8
b) Next is the filter labelled Bag Filter, Merv 14
c) Followed by the filter labelled Final Filter, Merv 16
2. All filters should be installed taking note of the arrow indicating the directions of air flow.
3. It is important that all the filters be properly seated, top and bottom, in the filter supporting frames for each
filter as shown in figure 4.
FIGURE 4
ECOLO ODOR CONTROL
(The Ecolo Odor Reducing Module is optional)
To prepare a 5 gallon/22 liter bottle of odor solution (“Scentry”) for use.
1. Open enclosure cabinet door using the special key. See Figure 5. (The key ships attached to the door with
a zip tie.) See Figure 6.
2. Screw the cap off the bottle/reservoir.
3. Place the low level probe in bottle on the neck of the bottle, taking the place of the cap. See Figure 7.
4. Cut a hole in the bottle for the dip tube. There is an indentation in the top of the bottle next to the handle
and opposite the neck where the level probe is. This is the location to cut the hole for the dip tube. There
may be a nipple in this location which may be cut off to allow the dip tube to be placed in the bottle. See
Figure 8.
5. Put the dip tube assembly into the bottle. Make sure the dip tube reaches the bottom of the bottle.

7
EcoloAir Installation Manual
OM-021/052017/rev5/EN
6. The switch to turn on the compressor must be placed in the “On” position.
7. Close the cabinet door and lock with the key.
NOTE:
The standard EcoloAir unit comes with the Ecolo Odor Control pre-mounted and installed.

8
EcoloAir Installation Manual
OM-021/052017/rev5/EN
To replace a 5 gallon/22 liter bottle of odor solution (“Scentry”)
1. Turn the odor control section OFF using the switch on the door of the enclosure cabinet.
2. Open enclosure cabinet door using the special key. See Figure 5. (The key ships attached to the door with
a zip tie.) See Figure 6.
3. Remove the level probe from the empty bottle/reservoir. See Figure 7.
4. Pull the dip tube assembly out of the empty bottle. See Figure 8.
5. Remove the empty bottle from the cabinet
6. Refill bottle with concentrate and mix well as per instructions or refill with “ready to use, pre-mixed
solution.
7. Place the bottle in the cabinet.
8. Put the dip tube assembly into the bottle. Make sure the dip tube reaches the bottom of the bottle.
9. Place level probe in the bottle.
10. Close the cabinet door and lock with the key.
11. Turn the odor control section ON.
SCHEMATIC WIRING DIAGRAMS
For field wiring diagrams and field connections refer to Halton’s job specific shop drawings shipped with
the unit or contact the factory for job specific drawings. Be prepared to provide the original Halton drawing
numbers, serial numbers, job name or job order number (found on quote or shipping information) to identify
proper job drawings.
Additional copies of shop drawings are available on request.
FAN SECTION
Important note:
Before starting the fan unit, remove fan isolator hold down brackets. The brackets are used for shipping
purposes only. When the brackets are removed, the fan should float freely on the spring isolators. Units
of 6000 cfm capacity and below have four spring isolators; units above 6000 cfm capacity have six spring
isolators. See Figure 9.

9
EcoloAir Installation Manual
OM-021/052017/rev5/EN
START UP NOTICE
The unit is now ready for start-up. The start-up and initial inspection are to be performed by an “authorized”
service agent. If the start-up is performed by personnel other than an “authorized” agent the Warranty is null
and void.
Halton must have a minimum notice of two weeks to schedule start-up. Should the equipment not be ready
for start-up at the specified time any additional expenses incurred will be charged to the dealer who purchased
the equipment.
For any questions please contact Halton Service Network at [email protected] or (270) 237-5600 for the
U.S. and (905) 624-0301 for Canada.
FIGURE 9

10
EcoloAir Installation Manual
OM-021/052017/rev5/EN
WARRANTY ACTIVATION FORM
This form must be completed and returned to Halton in order for your warranty to be valid.
Job & Location Information:
Job Name:
Street Name:
City: State: Zip Code:
Equipment Start-Up Date: Product Serial Numbers:
Contact Information:
Contact Name:
Title:
Chef, Kitchen Mgr/Facility Mgr/Property Mgr/etc.
Facility Management Company Name (if applicable):
Email:
Phone Number: Cell Number:
Fax completed form to:
Halton Company
Attention: Service Department
Fax: (270) 237-5700
Halton Indoor Climate Systems
Attention: Service Department
Fax: (905) 624-5547

HALTON LIMITED WARRANTY
Halton (“Manufacturer”). Warrants only to its direct purchasers and to no others, that all products
manufactured by the Manufacturer shall be free from defect in materials and workmanship for a period
of twelve (12) months from the date of the original installation and start-up or eighteen (18) months from
date of shipment, whichever occurs first. All products sold but not manufactured by Manufacturer will
be warranted for a period of twelve (12) months from date of shipment. (Halton’s Warranty Card must be
completely filled out and returned to Halton within 3 weeks after the equipment start-up date for your
warranty to be valid *IMPORTANT NOTE: “IF” this form is returned within the specified time frame,
Halton will extend your standard warranty by 120 days.)
For products manufactured by the Manufacturer we agree to pay any reasonable labor costs necessary to
repair or replace, at Manufacturers option, defective parts or materials for a period of twelve (12) months
from date of original installation and start-up or eighteen (18) months from date of shipment, whichever
occurs first. All labor costs subject hereto shall be performed during standard work hours at straight-time
rates.
For products sold but not manufactured by the Manufacturer we agree to pay any reasonable labor costs
necessary to repair or replace, at Manufacturers option, defective parts or materials for a period of (90)
days from date of original installation and start-up or (12) months from date of shipment, whichever occurs
first. All labor costs subject hereto shall be performed during standard work hours at straight time rates.
All warranty claims that include labor requires pre-approval by Halton. Halton, at its discretion, will
authorize field warranty work through its own service network or certified third party. No claims for labor
charges will be approved for payment if work commences without prior authorization by Halton.
Purchaser shall pay incurred premium labor charge, including overtime, weekends and holidays.Travel time,
service charges, miscellaneous tools, material charges, and labor charges resulting from inaccessibility of
equipment will not be paid by Manufacturer.
This LIMITED WARRANTY SHALL APPLY ONLY to products that have been installed and maintained in
accordance with the installation and Care Instruction Manuals. Purchaser shall be solely responsible for
adhering to the instructions and procedures set forth in the said instruction manuals.
This LIMITED WARRANTY SHALL NOT BE APPLICABLE to any damage or defect resulting from fire,
flood, freezing or any Act of God, abuse, misuse, accident, neglect or failure to adhere to all instructions
set forth in the installation and Care Instruction Manuals. Furthermore, this limited warranty shall not
apply to any product that has been altered, unless such alteration has been approved in writing by a duly
authorized representative of the manufacturer. In no event shall the manufacturer be liable for any loss,
expense, personal injury or consequential damage, of any kind or character, as may result from a defect
in material, and/or workmanship, however caused.
EXCEPT AS IS EXPRESSLY SET FORTH IN THIS LIMITED WARRANTY, MANUFACTURER MAKES NO
WARRANTY OF MARKETABILITY FOR FITNESS OR ANY PARTICULAR PURPOSE. NEITHER DOES
MANUFACTURER MAKE ANY WARRANTY, EXPRESSED OR IMPLIED, WITH RESPECT TO PRODUCTS
SOLD BY MANUFACTURER OR AS TO THE USE THEREOF.
Continuous product improvement is a Halton policy, therefore specifications and design are subject to change without notice.
Halton Company
101 Industrial Drive, Scottsville, KY 42164, USA
Phone 270 237 5600 | Fax 270 237 5700
Website: www.halton.com
Halton Indoor Climate Systems, Ltd.
1021 Brevik Place, Mississauga, ON L4W 3R7, Canada
Phone 905 624 0301 | Fax 905 624 0301
OM-021/052017/rev5/EN
Other manuals for EcoloAir 3000CFM
3
This manual suits for next models
14
Table of contents
Other Halton Fan manuals
Popular Fan manuals by other brands

SODECA
SODECA CJBD user manual

Team Kalorik
Team Kalorik TKG VT 1044 RD manual

Greenheck
Greenheck XG-5700 Installation, operation and maintenance manual

Scarlett
Scarlett comfort SC-SF111B18 instruction manual

Westinghouse
Westinghouse WFF16 user manual

cecotec
cecotec TOTALPURE 3IN1 CONNECTED instruction manual