
SmartACU2000B smart array controller
User Manual (with PID modules, 800 VAC)
Copyright © Huawei Technologies Co., Ltd.
5.5 Connecting Communications Cables for the Fiber Ring Network .............................................................................58
5.5.1 Connecting the Optical Jumper from the SmartLogger to the Fiber Adapter ..........................................................58
5.5.2 Connecting Cables to theATB.................................................................................................................................59
5.6 Connecting the 4G LTE Cable (with the POE SPD)...................................................................................................63
5.7 Connecting the 4G LTE Cable (with no POE SPD)....................................................................................................66
5.8 Connecting the Three-phaseAC Power Cable (a Circuit Breaker as the Three-Phase Input Switch).........................68
5.9 Connecting the Three-phaseAC Power Cable (a Knife Fuse Switch as the Three-Phase Input Switch)....................70
5.10 Connecting Peripheral RS485 Communications Cables...........................................................................................72
5.11 Connecting the LAN Switch Cable...........................................................................................................................74
5.12 Connecting the Peripheral Network Cable................................................................................................................75
5.13 Connecting the 24 V DC Output Power Cable .........................................................................................................77
5.14 Connecting the 24 V DC Input Power Cable............................................................................................................78
5.15 Connecting the Single-Phase AC Power Cable.........................................................................................................79
5.16 Connecting the DO/AO/DI/AI Signal Cable ............................................................................................................80
6 System Commissioning .............................................................................................................82
6.1 Checking Before Power-On........................................................................................................................................82
6.2 Powering On the System.............................................................................................................................................82
6.3 Closing the main Cabinet Door ..................................................................................................................................83
6.4 Powering Off the System............................................................................................................................................85
7 System Maintenance ..................................................................................................................87
7.1 Routine Maintenance..................................................................................................................................................87
7.2 Troubleshooting..........................................................................................................................................................88
7.3 Component Replacement............................................................................................................................................89
7.3.1 Replacing the Single/Three-Phase SPD...................................................................................................................89
7.3.2 Replacing the Three-Phase Input Switch (Circuit Breaker).....................................................................................90
7.3.3 Replacing the Three-Phase Input Switch (Knife Fuse Switch)................................................................................91
7.3.4 Replacing the Fuse of the Knife Fuse Switch..........................................................................................................92
7.3.5 Replacing the Single-Phase Input Switch................................................................................................................93
7.3.6 Replacing the PLC CCO Module ............................................................................................................................94
7.3.7 Replacing the SmartLogger2000 .............................................................................................................................94
7.3.8 Replacing the Power Adapter ..................................................................................................................................96
7.3.9 Replacing the PID Switch........................................................................................................................................96
7.3.10 Replacing the PID Module ....................................................................................................................................98
7.3.11 Replacing the 24 V DC Power Module................................................................................................................100
7.3.12 Replacing the Fiber Adapter ................................................................................................................................101
7.3.13 Replacing the USB Port.......................................................................................................................................101
7.3.14 Replacing the 24 V DC Input and Output Switches.............................................................................................103
8 Technical Specifications ..........................................................................................................104
A Configuring the DI7 and DI8 Ports ......................................................................................106
B Configuring the COM1 Port and COM2 Port .....................................................................107