FusionModule1000A20 Prefabricated All-in-One Data
Center
Installation Guide
Copyright © Huawei Technologies Co., Ltd.
6.1.1 (Optional) Installing the Fresh Air Integrated Unit..................................................................................................40
6.1.2 (Optional) Connecting Cables of the Fresh Air Integrated Unit ..............................................................................45
6.2 Installing Power Supply and Distribution Devices.....................................................................................................47
6.2.1 Installing the Rectifier (TP48400B).........................................................................................................................47
6.2.2 Installing the Rectifier (TP48600B, TP481200B) ...................................................................................................48
6.2.3 Installing a Battery (TP48400B or TP48600B) .......................................................................................................49
6.2.4 Installing a Battery (TP481200B)............................................................................................................................52
6.3 (Optional) Installing the Electric Heating Belt ...........................................................................................................55
6.4 Installing Monitoring Devices ....................................................................................................................................58
6.4.1 (Optional) Installing ECC800 Accessories ..............................................................................................................58
6.4.2 (Optional) Installing the WiFi Antenna....................................................................................................................60
6.4.3 (Optional) Installing a Pad.......................................................................................................................................61
6.5 (Optional) Installing CE-Certified Fire Extinguishing Devices..................................................................................62
6.5.1 (Optional) Installing the Fire Cylinder (CE)............................................................................................................62
6.5.2 Installing Extinguishant Control Panel Batteries.....................................................................................................65
6.5.3 (Optional) Connecting a Cable to the ASD Power Box Battery ..............................................................................66
6.5.4 Installing an External Horn Strobe...........................................................................................................................68
7 Installing a Cable Outside a Pre-fab. Module.......................................................................70
7.1 Installing External Input Power Cables ......................................................................................................................70
7.2 (Optional) Connecting DG Start/Stop Cables (ATS Input).........................................................................................74
8 Removing Transport Protection Materials.............................................................................77
8.1 Removing Transport Protection Materials for Fire Extinguishing Devices................................................................77
8.2 Removing Transport Protection Materials for Intelligent Heat Exchangers ...............................................................78
9 Installation Verification.............................................................................................................80
A A Basic Installation Operations ..............................................................................................82
A.1 Cable Installation Techniques....................................................................................................................................82
A.1.1 Cabling Rules..........................................................................................................................................................82
A.1.2 Measuring Cables ...................................................................................................................................................83
A.1.3 Laying Out Cables ..................................................................................................................................................84
A.1.4 Routing Cables Through a Plastic-coated Metal Hose............................................................................................85
A.1.5 Mounting Cables on the Cable Tray .......................................................................................................................86
A.1.6 Routing Cables into Feeder Windows.....................................................................................................................88
A.1.6.1 Installing DPJ End Connectors ............................................................................................................................88
A.1.6.2 Installing Waterproof Metal Connectors..............................................................................................................91
A.1.7 Attaching Cable Labels...........................................................................................................................................93
A.2 Preparing Cable Terminals.........................................................................................................................................94
B Cleaning Pre-fab. Modules.......................................................................................................97
C Dimensions of External Cable Trays and Step Ladders.....................................................98
D Acronyms and Abbreviations................................................................................................101