Installation instructions
Electrical and functional
testing
Electrical test
Electrical tests/measurements must be undertaken in accordance
with national standards (including VDE guidelines).
Measurements to be undertaken are taught during innogy training.
The following are examples of measurements:
• Checking of existing TN network/TT network system
• Measurement of tripping times of FI type B (e.g. Fluke 1654B
multifunction tester)
• Voltage measurements (Ph-Ph, Ph-N, Ph-PE)
• Grounding measurements pursuant to national norms and stand-
ards (e.g. DIN EN 61557 for Germany) and if required
• Preparation and handover of installation protocol to the customer
and innogy SE, for example by email to:
installation-e-mobility@innogy.com
If national standards require an insulation test, testing must be
undertaken upstream of the RCD. Do not conduct the insulation
test on the 1, 3, 5, N terminal side.
Functional testing
• Activate the charging station using the key switch
• The LED illuminates white
• Plug in the innogy eTester
• Activate status C
• The eTester indicates the voltage
• The contactor is activated and the LED illuminates blue
State
The innogy eTester is available separately. The eTester is
needed to conduct a functional test conforming to ISO 61851.