5. CONSTRUCTION REQUIREMENTS (CEILING/WALL MOUNT)
1. The 6129001 ceiling mount must be installed on the LABOMED ceiling columnplate.
2. The construction specialist must confirm in writing that the applicable regional and local codes & regulations have been
complied with and that the points listed below have been observed. The costumer must keep this confirmation with his
records on the ceiling mount. A copy of this document must be enclosed by the customer with hisrecord.
3. The roof on which 6129001 ceiling mount is to be mounted must have the following load capacity.
4. Perpendicular force: minimum 1500Nm.
5. Torque:Perpendiculartotheceiling1500Nm.minimum andparallelto theceiling 1200Nm minimumAlso take intoaccount
any additional loads acting on the ceiling and any other load anchored in theceiling.
6. The roof should preferably be made of minimum 6 inchesconcrete.
7. The ceiling plate must be aligned in a parallel position (max. deviation±5°)
8. The effective strength of ceiling must rate at least5000Nm.
The following must be taken into consideration when calculating the effective strength:
•Specification of the bolt / anchor manufacturer.
•Quality of the structural roof, e.g. the strengths and the thickness of theconcrete.
•Spacing of anchor holes and weakening effect of anchor holes in the ceiling.
NOTE:
If an existing ceiling mount is ever exchanged, never re-use the old anchors. New anchor holes must be drilled. When
calculating the effective strength of the new anchors, make sure to take into account the weakening effect of the old holes
in the ceiling.
On the basis of the above aspects, the person responsible for the building must decide on and take responsibility for the
most suitable method of anchoring.
The weight of the mount including the surgical microscope is as follows:
•Ceiling mount kit: Approx..............30 kg.
•Surgical microscope (Swivel Arm & Suspension Arm: Approx.........28Kg.
•Microscope Carrier: Approx................................ 10 kg.
Control and Power Supply of the System
Power line: 3X1.5mm2
Fuse: 2.5A
Power consumption: 1000V
NOTE:
A socket with properly installed protective earth connection must be provided at the installation site near the ceiling flange.
The terminals for power connections are located on the ceiling mount.
Potential equalization: take the necessary action in the building to include the instrument in the protective measures of
“potential equalization”.