
Parasol Installation InstructionsBACK
PREPARE THE ARCH SHARING A HEADRAIL WITH A
CORDLOCK SHADE
- Remove the left end cap from the rail. On Top-Down/
Bottom-Up or 2-On-1 Headrail shades, pull the left
cordlock out 1/2”. Do not pull the cordlock all the way
otheheadrail.
Important: On an imperfect arch, one edge of the
fabric stack will be straight and even, the other edge
will be trimmed and uneven.
- Slide the fabric stack down toward the left side of the
rail.
- Important: If a tension support cord was included with
your arch, be careful not to pull out the cord from the
cell it is threaded through. If necessary, rethread the
support cord through the center cell of the arch.
-Fanoutthefabricandslidethellerstripintothefabric
channels of the rail. If you have a tension support cord
pull the cord taut as you fan out and slide the fabric
onto the rail.
- Center the arch on the rail.
- Insert the end cap or cordlock back into the rail.
Top Cell
Top Cell of
Arch Fabric Stack
End
Cap
Headrail
Cordlock
Filler Strip
Top Cell of
Arch Fabric Stack
INSTALL THE ARCH SHARING A HEADRAIL WITH A
CONTINUUM, ACCU-RISE, SURE-LIFT OR AUTO-LIFT
HEADRAIL
- The headrail of the shade has a magnetic strip attached
tothetopoftherail.Thefabricstackhastwometalller
strips inserted into the top and bottom cell of the arch
fabric stack. Important: On an imperfect arch, one
edge of the fabric stack will be straight and even, the
other edge will be trimmed and uneven.
-Positionbothllerstripsinthetopandbottomcellsof
thearchfabricstack,aligningtheiredgesushwiththe
edges of the fabric stack. Important: A magnet is
attachedtothellerstrips,ending3”shortoftheright
edge to accomodate the installation brackets.
- Place the fabric stack on top of the rail with the colored
side of the fabric facing you.
- On the right side of the headrail, lay the bottom cell of
the fabric stack onto the magnet and fan out the fabric.
- On the left side of the headrail, lay the top cell onto the
magnet.
- Center the arch on the rail. If necessary, adjust the
llerstripinthetopandbottomcellsofthefabricstack.
- Install headrail into End Mount Brackets
Bottom Cell
The filler strip is flush
with the both edges
of the angle fabric stack.
A magnet is attached to the filler strip,
ending 3" short of the right edge,
to accommodate the installation brackets.
p Cell