
Contents
Contents . . . . . . . . . . . . . . . . . i
Chapter 1. Introduction . . . . . . . . . 1
Features and specifications . . . . . . . . . . . 1
Chapter 2. Rack cabinet
components . . . . . . . . . . . . . . . 3
Parts listing . . . . . . . . . . . . . . . . . 3
Neptune DWC RM100 in-rack Coolant Distribution
Unit (CDU) configuration . . . . . . . . . . . . 4
Rack cabinet options. . . . . . . . . . . . . .
Rear Door Heat eXchanger for 48U Rack . . . .
48U Heavy Duty Rack Extension . . . . . . 10
Cable management brackets . . . . . . . . 12
Power distribution units and console
switches . . . . . . . . . . . . . . . . 14
Chapter 3. Rack cabinet setup . . . . 15
Space planning . . . . . . . . . . . . . . . 15
Unpack the rack cabinet . . . . . . . . . . . 1
Install the front stabilizer and recirculation
prevention plate. . . . . . . . . . . . . . . 24
Install 48U Heavy Duty Rack Extension. . . . . . 25
Install the baying kit . . . . . . . . . . . . . 34
Install nuts on the mounting flanges . . . . . . . 41
Install cage nuts with a flat-blade
screwdriver. . . . . . . . . . . . . . . 41
Install cage nuts with insertion tool . . . . . 42
Install the rack grounding kit . . . . . . . . . . 43
Set up Rear Door Heat eXchanger for 48U Rack . . 4
Complete setup of Rear Door Heat eXchanger
48U that comes with the rack. . . . . . . . 48
Replace a regular door with Rear Door Heat
eXchanger for 48U . . . . . . . . . . . . 51
Water specifications for the secondary cooling
loop . . . . . . . . . . . . . . . . . 3
Fill the heat exchanger with water . . . . . . 73
Instal a 0/1U device into the rack . . . . . . . . 78
Instal a 0U device . . . . . . . . . . . . 80
Install a 1U PDU or console switch to the rack
side. . . . . . . . . . . . . . . . . . 81
Instal a 1U device into the side pocket . . . . 82
Chapter 4. Managing cables and
hoses . . . . . . . . . . . . . . . . . . 85
Routing cables/hoses for water-cooled system . . 89
Raised-floor environment . . . . . . . . . 90
Raised-floor and non-raised-floor
environments . . . . . . . . . . . . . . 92
Chapter 5. Hardware remo al,
installation and con ersion . . . . . . 93
Removing and installing the side covers . . . . . 93
Remove a side cover . . . . . . . . . . . 93
Install a side cover . . . . . . . . . . . . 93
Installing, removing, and converting the door . . . 95
Remove and install a door . . . . . . . . . 95
Reverse a door . . . . . . . . . . . . . 97
Rear Door Heat eXcahnger for 48U Rack
replacement . . . . . . . . . . . . . . . . 104
Drain the heat exchanger of water . . . . . . 104
Remove Rear Door Heat eXcahnger for 48U
Rack . . . . . . . . . . . . . . . . . 110
Install Rear Door Heat eXcahnger for 48U
Rack . . . . . . . . . . . . . . . . . 114
Fill the heat exchanger with water . . . . . . 121
Replace the door latch . . . . . . . . . . 127
Installing and removing 48U Heavy Duty Rack
Extension . . . . . . . . . . . . . . . . . 128
Install 48U Heavy Duty Rack Extension . . . . 128
Remove 48U Heavy Duty Rack Extension . . . 135
Installing and removing power distribution units or
switches . . . . . . . . . . . . . . . . . 141
Install and remove a 0U PDU . . . . . . . . 141
Install or remove a 1U device into or from the
rack side. . . . . . . . . . . . . . . . 143
Installing and removing a 1U device in/from
the side pocket . . . . . . . . . . . . . 147
Install and remove the outriggers . . . . . . . . 149
Remove the outriggers . . . . . . . . . . 149
Install the outriggers . . . . . . . . . . . 151
Installing and removing cable management
brackets. . . . . . . . . . . . . . . . . . 153
Remove a cable management bracket . . . . 153
Install a cable management bracket . . . . . 15
Appendix A. Getting help and
technical assistance . . . . . . . . . . 161
Before you call . . . . . . . . . . . . . . . 1 1
Contacting Support . . . . . . . . . . . . . 1 2
Appendix B. Notices. . . . . . . . . . 163
Trademarks . . . . . . . . . . . . . . . . 1 4
Index . . . . . . . . . . . . . . . . . . 165
© Copyright Lenovo 2021 i