Insert the V-Grips in the order shown
Trimming the screen material
Fabric Cutter
• Hold the fabric with one hand,
while sliding the cutter along the
inside edge of the frame.
• Avoid lifting up the fabric, as the
V-Grip may pop out.
Insert the V-Grips in the order shown below, commencing in the
middle of the bottom frame (1) and working to the left corner (2) and
then finishing the right corner (3). Trim the V-Grips to length if required.
Complete the left side (4) and then the right side (5).
The base and sides (1 – 5) should all be fastened
before proceeding.
Trim the TOP left and right corners of the fabric to enable the fabric to slide
underneath the bottom of the Frame Top bar and complete inserting the
remaining V-Grips, (6 – 7 – 8).
Be sure the screen is tensioned correctly before trim.
Trim the excess material to approximately 30mm - 40mm of the waste side of
the V-Grips.