
Table of contents ■■■■■■■■■■■■■■■■■■■■■■
IV ■■■■■■■■ 940 Professional IC Vario ONE/SeS/PP/MB (2.940.1580)
4.10 Installing an inline filter ..................................................... 31
4.11 Installing the pulsation absorber ...................................... 31
4.12 Injection valve ..................................................................... 32
4.13 Metrohm Suppressor Module (MSM) ............................... 34
4.13.1 Inserting the rotors ................................................................ 35
4.13.2 Connecting the Metrohm Suppressor Module (MSM) ............. 38
4.14 Peristaltic pump .................................................................. 43
4.14.1 Installing the peristaltic pump ................................................ 43
4.14.2 Mode of operation for the peristaltic pump ........................... 48
4.15 Metrohm CO2 Suppressor (MCS) ....................................... 49
4.15.1 General information on the MCS ........................................... 49
4.15.2 Connecting the MCS ............................................................. 50
4.15.3 Installing the adsorber cartridge ............................................. 52
4.16 Installing the conductivity detector .................................. 54
4.17 Connecting the sample degasser (optional) ..................... 55
4.18 Connecting the instrument to a computer ....................... 56
4.19 Connecting the instrument to the power grid ................. 57
4.20 Initial start-up ..................................................................... 58
4.21 Connecting and rinsing the guard column ....................... 60
4.22 Connecting and rinsing the separation column ............... 63
4.23 Conditioning ........................................................................ 66
5 Operation 68
6 Operation and maintenance 69
6.1 IC system ............................................................................. 69
6.1.1 Operation .............................................................................. 69
6.1.2 Care ...................................................................................... 69
6.1.3 Maintenance by Metrohm Service .......................................... 69
6.1.4 Shutting down and recommissioning ..................................... 70
6.2 Capillary connections ......................................................... 71
6.3 Servicing the door .............................................................. 71
6.4 Column thermostat – Replacing the capillaries ............... 71
6.5 Handling the eluent ............................................................ 73
6.5.1 Manufacturing eluent ............................................................ 74
6.5.2 Changing the eluent .............................................................. 74
6.6 Eluent degasser maintenance ............................................ 75
6.7 Notes on operating the high-pressure pump ................... 75
6.8 Servicing the high-pressure pump .................................... 76
6.9 Servicing the inline filter .................................................... 89