Motorola SC 300 User manual

SCt300 BTS Hardware
Installation, ATP and FRU
Procedures Software Release 2.15.x.x
SCt300
CDMA
English
DEC 2000
68P09224A55–1
PRELIMINARY

PRELIMINARY
Notice Whilereasonableeffortshavebeenmadetoassuretheaccuracyofthisdocument,Motorola,Inc.assumesnoliabilityresultingfromany
inaccuraciesoromissionsinthisdocument,orfromuseoftheinformationobtainedherein.Theinformationinthisdocumenthasbeen
carefullycheckedandisbelievedtobeentirelyreliable.However,noresponsibilityisassumedforinaccuraciesoromissions.Motorola,
Inc. reserves the right to make changes to any products described herein and reserves the right to revise this document and to make
changesfrom time to time in content hereof with no obligation to notify any person of revisions or changes. Motorola, Inc. does not
assume any liability arising out of the application or use of any product, software, or circuit described herein; neither does it convey
license under its patent rights or the rights of others.
It is possible that this publication may contain references to, or information about Motorola products (machines and programs),
programming, or services that are not announced in your country. Such references or information must not be construed to mean
that Motorola intends to announce such Motorola products, programming, or services in your country.
Copyrights
This instruction manual, and the Motorola products described in this instruction manual may be, include or describe copyrighted
Motorola material, such as computer programs stored in semiconductor memories or other media. Laws in the United States and
other countries preserve for Motorola certain exclusive rights for copyrighted material, including the exclusive right to copy,
reproduce in any form, distribute and make derivative works of the copyrighted material. Accordingly, any copyrighted Motorola
material contained herein or in the Motorola products described in this instruction manual may not be copied, reproduced,
distributed,merged or modified in any manner without the express written permission of Motorola. Furthermore, the purchase of
Motorola products shall not be deemed to grant either directly or by implication, estoppel, or otherwise, any license under the
copyrights, patents or patent applications of Motorola, as arises by operation of law in the sale of a product.
Usage and Disclosure Restrictions
License Agreement
The software described in this document is the property of Motorola, Inc. It is furnished by express license agreement only and may
be used only in accordance with the terms of such an agreement.
Copyrighted Materials
Softwareand documentation are copyrighted materials. Making unauthorized copies is prohibited by law. No part of the software or
documentation may be reproduced, transmitted, transcribed, stored in a retrieval system, or translated into any language or
computer language, in any form or by any means, without prior written permission of Motorola, Inc.
High Risk Activities
Components, units, or third–party products used in the product described herein are NOT fault–tolerant and are NOT designed,
manufactured, or intended for use as on–line control equipment in the following hazardous environments requiring fail–safe
controls: the operation of Nuclear Facilities, Aircraft Navigation or Aircraft Communication Systems, Air Traffic Control, Life
Support, or Weapons Systems (“High Risk Activities”). Motorola and its supplier(s) specifically disclaim any expressed or implied
warranty of fitness for such High Risk Activities.
Trademarks
and Motorola are registered trademarks of Motorola, Inc.
Product and service names profiled herein are trademarks of Motorola, Inc. Other manufacturers’ products or services profiled
herein may be referred to by trademarks of their respective companies.
Copyright
Copyright 2000 Motorola, Inc.
AllRights Reserved
Printed on
RecyclablePaper
REV010600
SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICE

DEC 2000 i
SCt300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
Table of Contents
SCt300 BTS Hardware Installation, ATP and FRU Procedures
Software Release 2.15.x.x
List of Figures v. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
List of Tables xi. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Foreword xvii. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General Safety xx. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Revision History xxii. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Patent Notification xxiii. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Chapter 1: Introduction
Introduction 1-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Required Documents 1-11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Installation Tools and Materials 1-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
ATP Tools and Materials 1-16. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
FRU Tools and Materials 1-21. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Unit Identification 1-22. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Installation and ATP Order 1-32. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Chapter 2: Site Preparation
Site Preparation Overview 2-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Site Inspections 2-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Prepare Site for the Arrival of the Equipment 2-6. . . . . . . . . . . . . . . . . . . . . . . . . .
Dimensions and Clearances 2-8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Chapter 3: Installing Mounting Bracket and Remote GPS
Overview 3-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Unpacking the Equipment and Inspecting for Damage 3-2. . . . . . . . . . . . . . . . . . .
Attaching the Mounting Bracket to a Wall 3-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Attaching the Mounting Bracket to a Ceiling 3-9. . . . . . . . . . . . . . . . . . . . . . . . . . .
Attaching the Mounting Bracket to a Pole 3-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Attaching the Mounting Bracket to a Rack 3-16. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Attaching Back Solar Cover to Mounting Bracket 3-19. . . . . . . . . . . . . . . . . . . . . . .
Remote GPS Head Installation 3-21. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Table of Contents – continued
PRELIMINARY
SCt300 BTS Hardware Installation, ATP and FRU Procedures DEC 2000
ii
Chapter 4: Preparing Site Cabling for Sites Equipped with
Customer–Supplied Site I/O Interface
Cabling Overview 4-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cable Descriptions 4-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Site Cabling for BTS With Customer–Supplied Site I/O Interface 4-8. . . . . . . . . .
Power, Ground, and Battery Cabling for Sites Equipped With
Customer–Supplied Site I/O Interface 4-16. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Antenna Cabling for Sites Equipped With
Customer–Supplied Site I/O Interface 4-21. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Site I/O , Span Line, RGPS and Modem Cabling for Sites Equipped With
Customer–Supplied Site I/O Interface 4-24. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
RGPS Cabling for Multi–BTS Configurations 4-31. . . . . . . . . . . . . . . . . . . . . . . . .
Span Line Daisy Chain Cabling 4-36. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Chapter 5: Preparing Site Cabling for Sites Equipped with
Optional Primary Surge Suppressor
Cabling Overview 5-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Site Cabling for BTS With Optional Primary Surge Suppressor 5-2. . . . . . . . . . . .
Attaching Surge Suppressor to Mounting Bracket 5-10. . . . . . . . . . . . . . . . . . . . . . .
Power, Ground and Battery Cabling for Sites Equipped With
Optional Primary Surge Suppressor 5-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Antenna Cabling for Sites Equipped With Optional Primary Surge Suppressor 5-18
Site I/O, Span Line, RGPS and Modem Cabling for Sites Equipped With
Primary Surge Suppressor 5-24. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
RGPS Cabling for Multi–BTS Configurations Equipped with
Optional Primary Surge Suppressor 5-32. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Span Line Daisy Chain Cabling for Sites Equipped with
Optional Primary Surge Suppressor 5-37. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Chapter 6: Installing the Unit and Installation Check Off List
Unit Installation Overview 6-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Connector Locations 6-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Attaching Back Fin Cover to Unit 6-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Attaching Optional Installation Handles to the Unit 6-6. . . . . . . . . . . . . . . . . . . . .
Attaching Unit to Mounting Bracket 6-8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Earth Ground Cabling 6-11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Attaching Front Fin Cover to Unit 6-14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Attaching the Site I/O Junction Box to the Unit 6-15. . . . . . . . . . . . . . . . . . . . . . . .
Attaching the Short Duration Battery to the Unit (optional) 6-17. . . . . . . . . . . . . . .
Short Duration Battery Cabling 6-19. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
AC Power Cabling 6-21. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Table of Contents – continued
DEC 2000 iii
SCt300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
DC Power Cabling 6-23. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Antenna Cabling for Sites Equipped With
Customer–Supplied Site I/O Interface 6-25. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Antenna Cabling for Sites Equipped with
Optional Primary Surge Suppressor 6-30. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
MIB Cabling for Multi–Unit Configurations 6-38. . . . . . . . . . . . . . . . . . . . . . . . . . .
SU Cabling 6-44. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Terminating Unused Connections 6-51. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Powering on Unit and Mounting the Solar Cover 6-52. . . . . . . . . . . . . . . . . . . . . . .
Site Cleanup 6-56. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Installation Completion Checklist 6-57. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Chapter 7: Optimization and Optional Acceptance Test Procedures (ATP)
ATP Overview 7-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
BTS Preparation 7-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Test Equipment and LMF Connection 7-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
BTS Configuration 7-15. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
BTS Software 7-24. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Test Equipment Setup 7-29. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Test Equipment Selection 7-37. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Power Meter Calibration 7-38. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Test Cable Calibration 7-39. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Create CAL File 7-42. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
RF Path Audit 7-44. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Acceptance Tests 7-46. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CDMA Operating Frequency Programming Information – North American
PCS Bands 7-48. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
TX & RX Acceptance Tests 7-53. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Generate an ATP Report 7-60. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Copy LMF CAL File to CBSC 7-61. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Prepare to Leave the Site 7-63. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Chapter 8: Optimization and Optional Acceptance Test Procedures (ATP) for Frequency
Hopping Pilot Beacon (FHPB)
ATP Overview 8-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Create CAL File 8-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
RF Path Audit 8-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Acceptance Tests 8-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
TX Acceptance Tests 8-8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Table of Contents – continued
PRELIMINARY
SCt300 BTS Hardware Installation, ATP and FRU Procedures DEC 2000
iv
Generate an ATP Report 8-11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Copy LMF CAL File to CBSC 8-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Chapter 9: Field Replaceable Unit (FRU) Procedures
Field Replaceable Unit (FRU) Overview 9-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Shut Down & Restoring BTS Signaling 9-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Site I/O Junction Box Replacement Procedure 9-13. . . . . . . . . . . . . . . . . . . . . . . . .
Short Duration Battery Replacement Procedures 9-16. . . . . . . . . . . . . . . . . . . . . . . .
Remote GPS Replacement Procedures 9-19. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Full Unit Replacement Procedures 9-21. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Appendix A: Outdoor Grounding Guidelines Overview
Outdoor Grounding Guidelines Summary A-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Index

DEC 2000 v
SCt300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
List of Figures
SCt300 BTS Hardware Installation, ATP and FRU Procedures
Software Release 2.15.x.x
Figure 1-1: MicroCell Unit Mounted on a Wall 1-4. . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1-2: Primary Surge Suppressor Mounted on a Wall 1-5. . . . . . . . . . . . . . . .
Figure 1-3: MicroCell Unit Mounted on a Rack 1-6. . . . . . . . . . . . . . . . . . . . . . . .
Figure 1-4: Primary Surge Suppressor Mounted on a Rack 1-7. . . . . . . . . . . . . . . .
Figure 1-5: MicroCell Unit Mounted on a Pole 1-8. . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1-6: Primary Surge Suppressor Mounted on a Pole 1-9. . . . . . . . . . . . . . . .
Figure 1-7: PicoCell Unit Mounted on a Ceiling 1-10. . . . . . . . . . . . . . . . . . . . . . . .
Figure 1-8: RS232–IEEE488 Converter Serial Cable Configuration 1-18. . . . . . . . .
Figure 1-9: General Block Diagram Showing the Port Names 1-22. . . . . . . . . . . . .
Figure 1-10: General Block Diagram Showing the Unit, Site I/O Interface, and
External Items 1-23. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1-11: Microcell and Picocell Unit 1-24. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1-12: Site I/O Junction Box and Cable 1-24. . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1-13: Primary Surge Suppressor (Optional) 1-25. . . . . . . . . . . . . . . . . . . . . .
Figure 1-14: AC Installation Box (Optional) 1-25. . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1-15: Mounting Bracket for both Microcell and
Primary Surge Suppressor 1-26. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1-16: Mounting Bracket for Picocell 1-26. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1-17: Adapters for Rack Mounting 1-27. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1-18: Adapters for Pole Mounting 1-28. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1-19: Adapter for Ceiling Mounting (Optional) 1-29. . . . . . . . . . . . . . . . . . .
Figure 1-20: Installation Handles for Lifting Unit (Optional) 1-29. . . . . . . . . . . . . .
Figure 1-21: Short Duration Battery (Optional) 1-29. . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1-22: Front and Back Solar Covers for MicroCell 1-30. . . . . . . . . . . . . . . . .
Figure 1-23: Front and Back Solar Covers for Surge Suppressor 1-30. . . . . . . . . . .
Figure 1-24: Front and Back Fin Covers for MicroCell and
PicoCell (PicoCell shown) 1-31. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 2-1: Securing Lights with Tape 2-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 2-2: Overall Dimensions of MicroCell and PicoCell Units 2-10. . . . . . . . . .
Figure 2-3: Overall Dimensions of Primary Surge Suppressor 2-11. . . . . . . . . . . . .

List of Figures – continued
PRELIMINARY
SCt300 BTS Hardware Installation, ATP and FRU Procedures DEC 2000
vi
Figure 2-4: Installation and Functional Clearances for MicroCell Units
(with Solar Covers) 2-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 2-5: Installation and Functional Clearances for MicroCell Units
(without Solar Covers) 2-13. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 2-6: Installation and Functional Clearances for PicoCell Units
(without Solar Covers) 2-14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 2-7: Installation and Functional Clearances for Primary Surge Suppressor
(without Solar Covers) 2-15. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 2-8: Installation and Functional Clearances for Primary Surge Suppressor
(with Solar Covers) 2-16. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 2-9: Installation and Functional Clearances for
PicoCell Unit Mounted to Ceiling 2-17. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 2-10: Concept of Functionality Clearances for MicroCell and
PicoCell Units 2-18. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3-1: Holes to Use to Mount the Bracket to the Wall 3-4. . . . . . . . . . . . . . . .
Figure 3-2: Securing Mounting Bracket to a Wall 3-8. . . . . . . . . . . . . . . . . . . . . . .
Figure 3-3: Picocell Ceiling Mounting Bracket 3-10. . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3-4: Securing Mounting Bracket to the Adapter 3-11. . . . . . . . . . . . . . . . . . .
Figure 3-5: Pole Adapter and Straps 3-14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3-6: Attaching Mounting Bracket to a Pole 3-15. . . . . . . . . . . . . . . . . . . . . .
Figure 3-7: Attaching the Mounting Bracket to a Rack 3-18. . . . . . . . . . . . . . . . . . .
Figure 3-8: Attaching MicroCell Back Solar Cover to Mounting Bracket 3-20. . . .
Figure 3-9: Installing the Remote GPS Head 3-22. . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4-1: Site Cabling for One Microcell 4-8. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4-2: Site Cabling for Two Microcells 4-9. . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4-3: Site Cabling for Three Microcells 4-10. . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4-4: Site Cabling for Four Microcells 4-11. . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4-5: Site Cabling for One Picocell 4-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4-6: Site Cabling for Two Picocells 4-13. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4-7: Site Cabling for Three Picocells 4-14. . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4-8: Site Cabling for Four Picocells 4-15. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4-9: AC Input Cable Connector Information 4-17. . . . . . . . . . . . . . . . . . . . .
Figure 4-10: DC Input Cable Connector Information 4-18. . . . . . . . . . . . . . . . . . . .
Figure 4-11: AC Installation Box 4-20. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4-13: Antenna Cabling Details 4-21. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4-14: Antenna Cabling for Three Microcells 4-22. . . . . . . . . . . . . . . . . . . . .
Figure 4-15: Antenna Cabling for Maximum of Four Microcells or Picocells 4-23.
Figure 4-16: Site I/O Cabling Details (MicroCell Unit Shown) 4-25. . . . . . . . . . . .
Figure 4-17: Site I/O Interface Cabling for
RGPS (Synchronous) Configurations 4-33. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

List of Figures – continued
DEC 2000 vii
SCt300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
Figure 4-18: Site I/O Interface Cabling for
HSO (Non–Synchronous) Configurations 4-34. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4-18: Site I/O Interface Cabling for Span Line Daisy Chain Cabling 4-37. .
Figure 5-1: Site Cabling for One Microcell with Primary Surge Suppressor 5-2. .
Figure 5-2: Site Cabling for Two Microcells with Primary Surge Suppressor 5-3.
Figure 5-3: Site Cabling for Three Microcells with Primary Surge Suppressor 5-4
Figure 5-4: Site Cabling for Four Microcells with Primary Surge Suppressor 5-5.
Figure 5-5: Site Cabling for One Picocell with Primary Surge Suppressor 5-6. . . .
Figure 5-6: Site Cabling for Two Picocells with Primary Surge Suppressor 5-7. . .
Figure 5-7: Site Cabling for Three Picocells with Primary Surge Suppressor 5-8. .
Figure 5-8: Site Cabling for Four Picocells with Primary Surge Suppressor 5-9. . .
Figure 5-9: Attaching the Surge Suppressor to the Mounting Bracket 5-11. . . . . . .
Figure 5-10: AC Input Cable Connector Information 5-13. . . . . . . . . . . . . . . . . . . .
Figure 5-11: DC Input Cable Connector Information 5-14. . . . . . . . . . . . . . . . . . . .
Figure 5-12: Primary Surge Suppressor AC Input Power Connection Locations 5-16
Figure 5-14: Antenna Cabling Details 5-18. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 5-15: Antenna Cabling for one Microcell with
Primary Surge Suppressor 5-19. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 5-16: Antenna Cabling for Two Microcells with
Primary Surge Suppressor 5-20. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 5-17: Antenna Cabling for Three Microcells with
Primary Surge Suppressor 5-20. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 5-18: Antenna Cabling for Four Microcells with
Primary Surge Suppressor 5-21. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 5-19: Antenna Cabling for one Picocell with
Primary Surge Suppressor 5-21. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 5-20: Antenna Cabling for Two Picocells with
Primary Surge Suppressor 5-22. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 5-21: Antenna Cabling for Three Picocells with
Primary Surge Suppressor 5-22. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 5-22: Antenna Cabling for Four Picocells with
Primary Surge Suppressor 5-23. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 5-22: Site I/O Cabling Details with
Optional Primary Surge Suppressor (MicroCell Unit Shown) 5-25. . . . . . . . . . . . . .
Figure 5-23: Punchdown Block Location 5-26. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 5-24: Punchdown Block 5-26. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 5-26: Site I/O Interface Cabling for
RGPS (Synchronous) Configurations 5-34. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 5-27: Site I/O Interface Cabling for
HSO (Non–Synchronous) Configurations 5-35. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 5-27: Site I/O Interface Cabling for
Span Line Daisy Chain Cabling 5-38. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

List of Figures – continued
PRELIMINARY
SCt300 BTS Hardware Installation, ATP and FRU Procedures DEC 2000
viii
Figure 6-1: Location of MicroCell Unit Connectors 6-2. . . . . . . . . . . . . . . . . . . . .
Figure 6-2: Location of PicoCell Unit Connectors 6-3. . . . . . . . . . . . . . . . . . . . . . .
Figure 6-3: Location of Primary Surge Suppressor Connectors 6-4. . . . . . . . . . . . .
Figure 6-4: Attaching Back Fin Cover to Unit (Picocell Shown) 6-5. . . . . . . . . . .
Figure 6-5: Attaching the Installation Handles to the Unit (Picocell Shown) 6-7. .
Figure 6-6: Attaching the Unit to the Mounting Bracket 6-10. . . . . . . . . . . . . . . . . .
Figure 6-7: Detail Location of Ground Stud 6-12. . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 6-8: Grounding Stud on Mounting Bracket 6-13. . . . . . . . . . . . . . . . . . . . . .
Figure 6-9: Attaching Front Fin Cover to Unit (Picocell Shown) 6-14. . . . . . . . . . .
Figure 6-10: Attaching the Site I/O Junction Box to the Unit 6-16. . . . . . . . . . . . . .
Figure 6-11: Attaching the Short Duration Battery to the Unit 6-18. . . . . . . . . . . . .
Figure 6-12: Battery Cable Installation 6-20. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 6-14: AC Power Cabling Details 6-22. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 6-14: DC Power Cabling Details 6-24. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 6-16: Antenna Cabling Details for MicroCell and PicoCell Unit 6-26. . . . . .
Figure 6-17: Antenna Cabling for Two Microcells 6-27. . . . . . . . . . . . . . . . . . . . . .
Figure 6-18: Antenna Cabling for Three Microcells 6-27. . . . . . . . . . . . . . . . . . . . .
Figure 6-19: Antenna Cabling for Four Microcells 6-28. . . . . . . . . . . . . . . . . . . . . .
Figure 6-20: Antenna Cabling for Two Picocells 6-28. . . . . . . . . . . . . . . . . . . . . . . .
Figure 6-21: Antenna Cabling for Three Picocells 6-29. . . . . . . . . . . . . . . . . . . . . . .
Figure 6-22: Antenna Cabling for Four Picocells 6-29. . . . . . . . . . . . . . . . . . . . . . .
Figure 6-23: Installation of Third and Fourth Antenna Lightning Arrestors 6-31. . .
Figure 6-24: Antenna Cabling Details for MicroCell and
PicoCell Unit Equipped with Primary Surge Suppressor 6-32. . . . . . . . . . . . . . . . . .
Figure 6-25: Antenna Cabling for Two Microcells Equipped with
Primary Surge Suppressor 6-33. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 6-26: Antenna Cabling for Three Microcells Equipped with
Primary Surge Suppressor 6-34. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 6-27: Antenna Cabling for Four Microcells Equipped with
Primary Surge Suppressor 6-35. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 6-28: Antenna Cabling for Two Picocells Equipped with
Primary Surge Suppressor 6-36. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 6-29: Antenna Cabling for Three Picocells Equipped with
Primary Surge Suppressor 6-36. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 6-30: Antenna Cabling for Four Picocells Equipped with
Primary Surge Suppressor 6-37. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 6-31: MIB Cabling for Two Units 6-42. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 6-32: MIB Cabling for Three Units 6-42. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 6-33: MIB Cabling for Four Units 6-43. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

List of Figures – continued
DEC 2000 ix
SCt300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
Figure 6-34: SU Cabling Details for Single MicroCell or Picocell 6-48. . . . . . . . . .
Figure 6-35: SU Cabling Details for Two Units 6-49. . . . . . . . . . . . . . . . . . . . . . . . .
Figure 6-36: SU Cabling Details for Three Units 6-49. . . . . . . . . . . . . . . . . . . . . . . .
Figure 6-37: SU Cabling Details for Four Units 6-50. . . . . . . . . . . . . . . . . . . . . . . .
Figure 6-38: Lock Positions on Primary Surge Suppressor 6-54. . . . . . . . . . . . . . . .
Figure 6-39: Location of AC Power Breakers on Primary Surge Suppressor 6-54. .
Figure 6-40: Front Solar Cover 6-55. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 7-1: Front Solar Cover (MicroCell Illustrated) 7-2. . . . . . . . . . . . . . . . . . . .
Figure 7-2: Location of AC and DC Power Breakers 7-3. . . . . . . . . . . . . . . . . . . . .
Figure 7-3: Location of AC Power Breakers Inside Primary Surge Suppressor 7-4
Figure 7-4: How To Remove The Diagnostic Access Cover (Microcell shown) 7-5
Figure 7-5: Detail Location of the Diagnostic Access Area for MicroCell 7-6. . . .
Figure 7-6: Detail Location of the Diagnostic Access Area for PicoCell 7-6. . . . .
Figure 7-7: BTS to LMF connection 7-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 7-8: 15–Pin MMI/LMF Serial Connector 7-8. . . . . . . . . . . . . . . . . . . . . . . .
Figure 7-9: R3465 Communications Test Set Timing Signal Detail
(Advantest R3465) 7-11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 7-10: Communications Test Set Timing Signal Detail
(CyberTest, HP 8935, HP 8921) 7-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 7-11: LMF to Test Equipment Connection 7-13. . . . . . . . . . . . . . . . . . . . . . .
Figure 7-12: RS232–IEEE488 Converter Serial Cable Configuration 7-14. . . . . . . .
Figure 7-13: Power Meter Detail 7-35. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 7-14: Cable Calibration Test Setup 7-41. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 7-15: North America PCS Frequency Spectrum (CDMA Allocation) 7-48. .
Figure 7-16: North American Cellular Telephone System Frequency Spectrum
(CDMA Allocation). 7-51. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 7-17: TX ATP Setup (CyberTest, HP 8935 and Advantest R3465 7-56. . . . .
Figure 7-18: TX ATP Setup (HP 8921A) 7-57. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 7-19: RX ATP Setup (CyberTest, HP 8935 and Advantest) 7-58. . . . . . . . . .
Figure 7-20: RX ATP Setup (HP 8921A) 7-59. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 7-21: How To Replace The Diagnostic Access Cover (Microcell shown) 7-65
Figure 9-1: FRU Items 9-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 9-2: Front and Back Solar Covers for MicroCell 9-3. . . . . . . . . . . . . . . . . .
Figure 9-3: Front and Back Fin Covers for MicroCell and
PicoCell (PicoCell shown) 9-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 9-4: Site I/O Junction Box Replacement 9-15. . . . . . . . . . . . . . . . . . . . . . . . .
Figure 9-5: Battery Replacement 9-18. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 9-6: RGPS Head Replacement 9-20. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

List of Figures – continued
PRELIMINARY
SCt300 BTS Hardware Installation, ATP and FRU Procedures DEC 2000
x
Figure 9-7: Unit Replacement (MicroCell shown) 9-24. . . . . . . . . . . . . . . . . . . . . . .

DEC 2000 xi
SCt300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
List of Tables
SCt300 BTS Hardware Installation, ATP and FRU Procedures
Software Release 2.15.x.x
Table 1-1: Tools and Materials for Pole Mounting 1-13. . . . . . . . . . . . . . . . . . . . . . .
Table 1-2: Tools and Materials for Rack Mounting 1-13. . . . . . . . . . . . . . . . . . . . . .
Table 1-3: Mounting Bracket Tools and Materials for Concrete Wall Mounting 1-14
Table 1-4: Tools and Materials for Concrete Ceiling 1-15. . . . . . . . . . . . . . . . . . . . .
Table 1-5: Tools Required to Perform FRU Procedures 1-21. . . . . . . . . . . . . . . . . . .
Table 2-1: Procedure to Prepare the Site for the BTS 2-7. . . . . . . . . . . . . . . . . . . .
Table 2-2: Installation Dimensions for the MicroCell and PicoCell Units 2-8. . . .
Table 2-3 Minimum Clearances MicroCell and PicoCell Units 2-9. . . . . . . . . . . . .
Table 2-4 Minimum Clearances for Surge Suppressor 2-9. . . . . . . . . . . . . . . . . . . .
Table 3-1: Mounting Bracket Tools and Materials for Concrete Wall Mounting 3-5
Table 3-2: Procedure to Drill Holes in the Wall for
Mounting Bracket Installation 3-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 3-3: Procedure to Secure the Mounting Bracket to a Wall 3-7. . . . . . . . . . . .
Table 3-4: Tools and Materials for Concrete Ceiling 3-10. . . . . . . . . . . . . . . . . . . . .
Table 3-5: Procedure to Secure the Mounting Bracket to the Adapter 3-11. . . . . . . .
Table 3-6: Tools and Materials for Pole Mounting 3-12. . . . . . . . . . . . . . . . . . . . . . .
Table 3-7: Procedure for Attaching the Mounting Bracket to a Pole 3-13. . . . . . . . .
Table 3-8: Tools and Materials for Rack Mounting 3-16. . . . . . . . . . . . . . . . . . . . . .
Table 3-9: Procedure to Attach the Mounting Bracket to a Rack 3-16. . . . . . . . . . . .
Table 3-10: Procedure to attach Back Solar Cover to Mounting Bracket 3-19. . . . .
Table 3-11: Installing the RGPS Head 3-21. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-1: Cable Descriptions and Part Numbers 4-2. . . . . . . . . . . . . . . . . . . . . . . .
Table 4-2: Microcell Expansion Kit for Units 1 to 2
Short MIB A (Cubicle) – T448AL 4-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-3: Microcell Expansion Kit for Units 1 to 2
Long MIB A (Non–Cubicle) – T448AM 4-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-4: Picocell Expansion Kit for Units 1 to 2
Short MIB A (Cubicle) – T448AN 4-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-5: Picocell Expansion Kit for Units 1 to 2
Long MIB A (Non–Cubicle) – T448AP 4-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-6: Microcell/Picocell Expansion Kit for Units 2 to 3
Current 2m MIB B – T448AR 4-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

List of Tables – continued
PRELIMINARY
SCt300 BTS Hardware Installation, ATP and FRU Procedures DEC 2000
xii
Table 4-7: Microcell/Picocell Expansion Kit for Units 2 to 3
Long 5m MIB B – T448AS 4-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-8: Microcell/Picocell Expansion Kit for Units 3 to 4
Current 2m MIBs B and C – T448AT 4-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-9: Microcell/Picocell Expansion Kit for Units 3 to 4
Longer 5M MIBs B and C – T448AU 4-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-10: Picocell Expansion Kit for Units 3 to 4
Current 2M MIBs B and C – T448AV 4-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-11: Picocell Expansion Kit for Units 3 to 4
Longer 5M MIBs B and C – T448AW 4-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-12: RGPS Synchronization Cable Kit – SGKN4351A 4-7. . . . . . . . . . . .
Table 4-13: RGPS Synchronization Cable Kit – SGKN4352A 4-7. . . . . . . . . . . .
Table 4-14: Cables Needed for Power, Earth Ground, and Battery Connections 4-17
Table 4-15: AC Input Cable Information 4-17. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-16: DC Input Cable Information 4-18. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-17: Procedure to Install Earth Ground Cable 4-18. . . . . . . . . . . . . . . . . . . . .
Table 4-18: Procedure to Install AC Input Cable(s) (Indoor Applications) 4-19. . . .
Table 4-19: Procedure to Install AC Installation Box
(Optional – Required for Outdoor Installations) 4-19. . . . . . . . . . . . . . . . . . . . . . . .
Table 4-20: AC Installation Box Cabling 4-19. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-21: Procedure to Install DC Input Cable(s) 4-20. . . . . . . . . . . . . . . . . . . . . .
Table 4-24: Cables Needed for Antenna Connections 4-21. . . . . . . . . . . . . . . . . . . .
Table 4-25: Pin and Signal Information for Cable C (Antenna Cable) 4-21. . . . . . .
Table 4-26: Cables Needed for Antenna Connections 4-24. . . . . . . . . . . . . . . . . . . .
Table 4-27: Pin/Signal Information for Site I/O Cable 4-26. . . . . . . . . . . . . . . . . . . .
Table 4-28: Connecting the RGPS to the Site I/O Cable 4-29. . . . . . . . . . . . . . . . . .
Table 4-29: Cable Descriptions and Part Numbers 4-31. . . . . . . . . . . . . . . . . . . . . . .
Table 4-30: RGPS Synchronization Cable Kit – SGKN4351A 4-31. . . . . . . . . . . .
Table 4-31: RGPS Synchronization Cable Kit – SGKN4352A 4-31. . . . . . . . . . . .
Table 4-32: Multi–BTS Cable Run List 4-35. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 4-31: Cable Descriptions and Part Numbers 4-36. . . . . . . . . . . . . . . . . . . . . . .
Table 4-32: Cable Run List for Span Line Daisy Chain Cabling 4-38. . . . . . . . . . . .
Table 5-1: Procedure to Attach the Surge Suppressor to the Mounting Bracket 5-10
Table 5-2: Cables Needed for Power, Earth Ground, and Battery Connections 5-13.
Table 5-3: AC Input Cable Information 5-13. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 5-4: DC Input Cable Information 5-14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 5-5: Procedure to Install the Master Ground Cable on a
BTS Equipped with Optional Primary Surge Suppressor 5-14. . . . . . . . . . . . . . . . .
Table 5-6: Procedure to Install Earth Ground Cable on a
BTS Equipped with Optional Primary Surge Suppressor 5-15. . . . . . . . . . . . . . . . .

List of Tables – continued
DEC 2000 xiii
SCt300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
Table 5-7: Procedure to Install AC Input Cable(s) on a
BTS Equipped with Optional Primary Surge Suppressor 5-15. . . . . . . . . . . . . . . . .
Table 5-8: Procedure to Install DC Input Cable(s) 5-17. . . . . . . . . . . . . . . . . . . . . . .
Table 5-11: Cables Needed for Antenna Connections 5-18. . . . . . . . . . . . . . . . . . . .
Table 5-12: Pin and Signal Information for Cables C and D (Antenna Cable) 5-18.
Table 5-13: Procedure to Install Antenna Cabling for Sites Equipped with
Primary Surge Suppressor 5-19. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 5-12: Cables Needed for Antenna Connections 5-24. . . . . . . . . . . . . . . . . . . .
Table 5-13: Procedure to Install Site I/O Cable Between Site I/O Junction Box and
Optional Primary Surge Suppressor 5-25. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 5-14: Pin/Signal Information for Site I/O Cable and Punchdown Block 5-28.
Table 5-15: Connecting the RGPS to the Site I/O Cable 5-30. . . . . . . . . . . . . . . . . .
Table 5-18: Cable Descriptions and Part Numbers 5-32. . . . . . . . . . . . . . . . . . . . . . .
Table 5-19: RGPS Synchronization Cable Kit – SGKN4351A 5-32. . . . . . . . . . . .
Table 5-20: RGPS Synchronization Cable Kit – SGKN4352A 5-32. . . . . . . . . . . .
Table 5-21: Multi–BTS RGPS Cable Run List for Primary Surge Suppressor 5-36.
Table 5-20: Cable Descriptions and Part Numbers 5-37. . . . . . . . . . . . . . . . . . . . . . .
Table 5-21: Cable Run List for Span Line Daisy Chain Cabling 5-39. . . . . . . . . . . .
Table 6-1: Procedure to Attach Rear Fin Cover to Units 6-5. . . . . . . . . . . . . . . . . .
Table 6-2: Installation Handle Kit – SGLN5754 6-6. . . . . . . . . . . . . . . . . . . . . . . .
Table 6-3: Procedure to Attach the Installation Handles to the Unit 6-6. . . . . . . . .
Table 6-4: Procedure to Attach the Unit to the Mounting Bracket 6-9. . . . . . . . . . .
Table 6-5: Ground Cable Description and Part Number 6-11. . . . . . . . . . . . . . . . . . .
Table 6-6: Procedure to Attach the Earth Ground Cables 6-11. . . . . . . . . . . . . . . . .
Table 6-7: Procedure to Attach Front Fin Cover to Unit 6-14. . . . . . . . . . . . . . . . . .
Table 6-8: Procedure to Attach the Site I/O Junction Box to the Unit 6-15. . . . . . . .
Table 6-9: Procedure to Attach a Site I/O Cap to the Unit (optional) 6-16. . . . . . . .
Table 6-10: Procedure to Attach the Short Duration Battery to the Unit 6-17. . . . . .
Table 6-11: Procedure to Connect the Short Duration Battery Cable to Unit 6-19. .
Table 6-13: AC Input Cable Description and Part Number 6-21. . . . . . . . . . . . . . . .
Table 6-14: Procedure to Connect AC Power to the Unit 6-21. . . . . . . . . . . . . . . . .
Table 6-14: DC Input Cable Description and Part Number 6-23. . . . . . . . . . . . . . . .
Table 6-15: Procedure to Connect DC Power to the Unit 6-23. . . . . . . . . . . . . . . . .
Table 6-17: Cable Descriptions and Part Numbers 6-25. . . . . . . . . . . . . . . . . . . . . . .
Table 6-18: Cable Descriptions and Part Numbers 6-30. . . . . . . . . . . . . . . . . . . . . . .
Table 6-19: Procedure to Install Antenna Lightning Arrestors 6-30. . . . . . . . . . . . . .
Table 6-20: MIB Terminators 6-38. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-21: Microcell Expansion Kit for Units 1 to 2
Short MIB A (Cubicle) – T448AL 6-38. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

List of Tables – continued
PRELIMINARY
SCt300 BTS Hardware Installation, ATP and FRU Procedures DEC 2000
xiv
Table 6-22: Microcell Expansion Kit for Units 1 to 2
Long MIB A (Non–Cubicle) – T448AM 6-39. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-23: Picocell Expansion Kit for Units 1 to 2
Short MIB A (Cubicle) – T448AN 6-39. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-24: Picocell Expansion Kit for Units 1 to 2
Long MIB A (Non–Cubicle) – T448AP 6-39. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-25: Microcell/Picocell Expansion Kit for Units 2 to 3
Current 2m MIB B – T448AR 6-39. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-26: Microcell/Picocell Expansion Kit for Units 2 to 3
Long 5m MIB B – T448AS 6-40. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-27: Microcell/Picocell Expansion Kit for Units 3 to 4
Current 2m MIBs B and C – T448AT 6-40. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-28: Microcell/Picocell Expansion Kit for Units 3 to 4
Longer 5M MIBs B and C – T448AU 6-40. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-29: Picocell Expansion Kit for Units 3 to 4
Current 2M MIBs B and C – T448AV 6-41. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-30: Picocell Expansion Kit for Units 3 to 4
Longer 5M MIBs B and C – T448AW 6-41. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-31: Cables Needed for SU Connections 6-44. . . . . . . . . . . . . . . . . . . . . . . .
Table 6-32: Microcell Expansion Kit for Units 1 to 2
Short MIB A (Cubicle) – T448AL 6-44. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-33: Microcell Expansion Kit for Units 1 to 2
Long MIB A (Non–Cubicle) – T448AM 6-45. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-34: Picocell Expansion Kit for Units 1 to 2
Short MIB A (Cubicle) – T448AN 6-45. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-35: Picocell Expansion Kit for Units 1 to 2
Long MIB A (Non–Cubicle) – T448AP 6-45. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-36: Microcell/Picocell Expansion Kit for Units 2 to 3
Current 2m MIB B – T448AR 6-45. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-37: Microcell/Picocell Expansion Kit for Units 2 to 3
Long 5m MIB B – T448AS 6-46. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-38: Microcell/Picocell Expansion Kit for Units 3 to 4
Current 2m MIBs B and C – T448AT 6-46. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-39: Microcell/Picocell Expansion Kit for Units 3 to 4
Longer 5M MIBs B and C – T448AU 6-46. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-40: Picocell Expansion Kit for Units 3 to 4
Current 2M MIBs B and C – T448AV 6-47. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-41: Picocell Expansion Kit for Units 3 to 4
Longer 5M MIBs B and C – T448AW 6-47. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-42: Install the SU Cable on One MicroCell or PicoCell 6-47. . . . . . . . . . . .
Table 6-43: Install SU Cabling for Multi–BTS Configurations 6-48. . . . . . . . . . . . .
Table 6-44: Terminations of Unused Connectors 6-51. . . . . . . . . . . . . . . . . . . . . . . .
Table 6-45: Terminations of Unused Connectors 6-51. . . . . . . . . . . . . . . . . . . . . . . .
Table 6-46: Procedure to Power on the Unit and Mount the Solar Cover 6-52. . . . .

List of Tables – continued
DEC 2000 xv
SCt300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
Table 6-47: Procedure to Power on the Surge Suppressor, the Unit, and
Mount the Solar Cover 6-53. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 6-47: Installation Completion Checklist 6-58. . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-1: Procedure for Removing Diagnostic Access Cover 7-5. . . . . . . . . . . . .
Table 7-2: 15–Pin MMI/LMF Serial Cable Information 7-8. . . . . . . . . . . . . . . . . .
Table 7-3: Interfacing test equipment to the BTS 7-9. . . . . . . . . . . . . . . . . . . . . . . .
Table 7-4: Connect the Communication Test Set and Power Meter to the LMF 7-13
Table 7-5: Create a HyperTerminal Connection 7-15. . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-6: Establishing MMI Communication 7-17. . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-7: Updating Default Channel Setting to Customer Operating Channel 7-18
Table 7-8: Verify BTS Sync Mode 7-20. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-9: Verify DPLL Tracking 7-20. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-10: Verify Default Startup Coordinates 7-22. . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-11: Create Site–Specific BTS Directory 7-24. . . . . . . . . . . . . . . . . . . . . . . .
Table 7-12: Start the LMF and Login to the BTS 7-25. . . . . . . . . . . . . . . . . . . . . . .
Table 7-13: Update BTS Specific CDF File Device Load Version 7-26. . . . . . . . . .
Table 7-14: Download/Enable MAWI 7-27. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-15: System Status LED States 7-28. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-16: Selecting Test Equipment Manually in a Serial Connection Tab 7-30. .
Table 7-17: Selecting Test Equipment Using Auto-Detect 7-31. . . . . . . . . . . . . . . . .
Table 7-18: Test Equipment Calibration 7-32. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-19: R3465 Calibration Procedure 7-33. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-20: Gigatronics Power Meter GPIB Address Procedure 7-35. . . . . . . . . . . .
Table 7-21: Test Equipment Setup 7-36. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-22: Test Equipment Selection 7-37. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-23: Calibrate the Power Meter 7-38. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-24: Automated Cable Calibration 7-40. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-25: Create CAL File 7-43. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-26: RF Path Audit 7-45. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-27: 1900 MHz TX and RX Frequency vs. Channel 7-49. . . . . . . . . . . . . . .
Table 7-28: 800 MHz TX and RX Frequency vs. Channel 7-51. . . . . . . . . . . . . . . .
Table 7-29: TX Acceptance Test Outline 7-53. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-30: TX Test Using Backup Synchronization 7-53. . . . . . . . . . . . . . . . . . . . .
Table 7-31: RX ATP Test 7-55. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-32: Generate an ATP Report 7-60. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-33: Copy Files from LMF to a Diskette 7-61. . . . . . . . . . . . . . . . . . . . . . . .
Table 7-34: Copying CAL Files from Diskette to the CBSC 7-62. . . . . . . . . . . . . . .

List of Tables – continued
PRELIMINARY
SCt300 BTS Hardware Installation, ATP and FRU Procedures DEC 2000
xvi
Table 7-35: Remove External Test Equipment 7-63. . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-36: Reset BTS and Remote Site Initialization 7-63. . . . . . . . . . . . . . . . . . . .
Table 7-37: Bring BTS into Service 7-64. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 7-38: Remove LMF 7-64. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 8-1: Create CAL File 8-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 8-2: RF Path Audit 8-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 8-3: TX Acceptance Test Outline 8-8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 8-4: TX Test Using Backup Synchronization 8-8. . . . . . . . . . . . . . . . . . . . . .
Table 8-5: Generate an ATP Report 8-11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 8-6: Copy Files from LMF to a Diskette 8-12. . . . . . . . . . . . . . . . . . . . . . . . .
Table 8-7: Copying CAL Files from Diskette to the CBSC 8-13. . . . . . . . . . . . . . . .
Table 9-1: Login and Access Alarm Window Procedure 9-4. . . . . . . . . . . . . . . . . .
Table 9-2: Shut Down Signaling Functions 9-5. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 9-3: Restore Signaling Operations 9-9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 9-4: Item Number Replacement List 9-13. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 9-5: Remove the Failed Site I/O Junction Box 9-14. . . . . . . . . . . . . . . . . . . . .
Table 9-6: Install the Replacement Site I/O Junction Box 9-14. . . . . . . . . . . . . . . . .
Table 9-7: Item Number Replacement List 9-16. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 9-8: Remove the Failed Short Duration Battery 9-17. . . . . . . . . . . . . . . . . . . .
Table 9-9: Install the Replacement Short Duration Battery 9-17. . . . . . . . . . . . . . . .
Table 9-10: Item Number Replacement List 9-19. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 9-11: Remove the Failed RGPS Head 9-19. . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 9-12: Install the Replacement RGPS Head 9-20. . . . . . . . . . . . . . . . . . . . . . . .
Table 9-13: Item Number Replacement List 9-21. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 9-14: Remove the Failed Unit 9-21. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 9-15: Install the New Unit 9-23. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Foreword
DEC 2000 xvii
SCt300 BTS Hardware Installation, ATP and FRU Procedures
PRELIMINARY
Scope of manual
This manual is intended for use by cellular telephone system
craftspersons in the day-to-day operation of Motorola cellular system
equipment and ancillary devices. It is assumed that the user of this
information has a general understanding of telephony, as used in the
operation of the Public Switched Telephone Network (PSTN), and is
familiar with these concepts as they are applied in the cellular
mobile/portable radiotelephone environment. The user, however, is not
expected to have any detailed technical knowledge of the internal
operation of the equipment.
This manual is not intended to replace the system and equipment
training offered by Motorola, although it can be used to supplement or
enhance the knowledge gained through such training.
Text conventions
The following special paragraphs are used in this manual to point out
information that must be read. This information may be set-off from the
surrounding text, but is always preceded by a bold title in capital letters.
The four categories of these special paragraphs are:
Presents additional, helpful, non-critical information that
you can use.
NOTE
Presents information to help you avoid an undesirable
situation or provides additional information to help you
understand a topic or concept.
IMPORTANT
*
Presents information to identify a situation in which
equipment damage could occur, thus avoiding damage to
equipment.
CAUTION
Presents information to warn you of a potentially
hazardous situation in which there is a possibility of
personal injury.
WARNING

Foreword – continued
PRELIMINARY
SCt300 BTS Hardware Installation, ATP and FRU Procedures DEC 2000
xviii
The following typographical conventions are used for the presentation of
software information:
SIn text, sans serif BOLDFACE CAPITAL characters (a type style
without angular strokes: i.e., SERIF versus SANS SERIF) are used to
name a command.
SIn text, typewriter style characters represent prompts and the
system output as displayed on an operator terminal or printer.
SIn command definitions, sans serif boldface characters represent those
parts of the command string that must be entered exactly as shown and
typewriter style characters represent command output responses
as displayed on an operator terminal or printer.
SIn the command format of the command definition, typewriter
style characters represent the command parameters.
Changes to manual
Changes that occur after the printing date are incorporated into your
manual by Cellular Manual Revisions (CMRs). The information in this
manual is updated, as required, by a CMR when new options and
procedures become available for general use or when engineering
changes occur. The cover sheet(s) that accompany each CMR should be
retained for future reference. Refer to the Revision History page for a list
of all applicable CMRs contained in this manual.
Receiving updates
Technical Education & Documentation (TED) maintains a customer
database that reflects the type and number of manuals ordered or shipped
since the original delivery of your Motorola equipment. Also identified
in this database is a “key” individual (such as Documentation
Coordinator or Facility Librarian) designated to receive manual updates
from TED as they are released.
To ensure that your facility receives updates to your manuals, it is
important that the information in our database is correct and up-to-date.
Therefore, if you have corrections or wish to make changes to the
information in our database (i.e., to assign a new “key” individual),
please contact Technical Education & Documentation at:
MOTOROLA, INC.
Technical Education & Documentation
1 Nelson C. White Parkway
Mundelein, Illinois 60060
U.S.A.
Phone:
Within U.S.A. and Canada 800-872-8225. . . . .
Outside of U.S.A. and Canada +1-847-435–5700. .
FAX: +1-847-435–5541. . . . . . . . . . . . . . . . . . . . . .
Other manuals for SC 300
1
Table of contents
Other Motorola Transceiver manuals

Motorola
Motorola Micom-2 User manual

Motorola
Motorola DC800 User manual

Motorola
Motorola T56ZV1 User manual

Motorola
Motorola MICOM-3F User manual

Motorola
Motorola SC 300 User manual

Motorola
Motorola GP360 Series User manual

Motorola
Motorola LM2000 - SOUTHERNLINC User manual

Motorola
Motorola TETRA MTP850 EX User manual

Motorola
Motorola MICOM-2ES User manual

Motorola
Motorola HF-SSB MICOM-500E-A G761AA User manual