711. 05. 17. Leaflet Number 671177
DECLARATION OF INCORPORATION AND INFORMATION FOR SAFE INSTALLATION,
OPERATION AND MAINTENANCE
To comply with EC Council Directives 2006/42/EC Machinery Directive and
2014/30/EU (EMC).
To be read in con unction with the relevant Product Documentation (see 2.1)
1.0 GENERAL
1.1 The equ pment referred to n th s Declaration of Incorporation s suppl ed by
Nua re to be assembled nto a vent lat on system wh ch may or may not nclude
add t onal components.
The ent re system must be cons dered for safety purposes and t s the
respons b l ty of the nstaller to ensure that all of the equ pment s nstalled n
compl ance w th the manufacturers recommendat ons and w th due regard to
current leg slat on and codes of pract ce.
2.0 INFORMATION SUPPLIED WITH THE EQUIPMENT
2.1 Each tem of equ pment s suppl ed w th a set of documentat on wh ch prov des
the nformat on requ red for the safe nstallat on and ma ntenance of the
equ pment. Th s may be n the form of a Data sheet and/or Installat on and
Ma ntenance nstruct on.
2.2 Each un t has a rat ng plate attached to ts outer cas ng. The rat ng plate
prov des essent al data relat ng to the equ pment such as ser al number, un t
code and electr cal data. Any further data that may be requ red w ll be found
n the documentat on. If any tem s unclear or more nformat on s requ red,
contact Nua re.
2.3 Where warn ng labels or not ces are attached to the un t the nstruct ons g ven
must be adhered to.
3.0 TRANSPORTATION, HANDLING AND STORAGE
3.1 Care must be taken at all t mes to prevent damage to the equ pment. Note that
shock to the un t may result n the balance of the mpeller be ng affected.
3.2 When handl ng the equ pment, care should be taken w th corners and edges and
that the we ght d str but on w th n the un t s cons dered. L ft ng gear such as
sl ngs or ropes must be arranged so as not to bear on the cas ng.
3.3 Equ pment stored on s te pr or to nstallat on should be protected from the
weather and steps taken to prevent ngress of contam nants.
4.0 OPERATIONAL LIMITS
4.1 It s mportant that the spec f ed operat onal l m ts for the equ pment are
adhered to e.g. operat onal a r temperature, a r borne contam nants and un t
or entat on.
4.2 Where nstallat on accessor es are suppl ed w th the spec f ed equ pment eg.
wall mount ng brackets. They are to be used to support the equ pment only.
Other system components must have separate prov s on for support.
4.3 Flanges and connect on sp gots are prov ded for the purpose of jo n ng to
duct work systems. They must not be used to support the ductwork.
5.0 INSTALLATION REQUIREMENTS
In add t on to the part cular requ rements g ven for the nd v dual product, the
follow ng general requ rements should be noted.
5.1 Where access to any part of equ pment wh ch moves, or can become electrically
live are not prevented by the equ pment panels or by f xed nstallat on deta l
(eg duct ng), then guard ng to the appropr ate standard must be f tted.
5.2 The electr cal nstallat on of the equ pment must comply w th the requ rements
of the relevant local electr cal safety regulat ons.
5.3 For EMC all control and sensor cables should not be placed w th n 50mm or on
the same metal cable tray as 230V sw tched l ve, l ght ng or power cables and
any cables not ntended for use w th th s product.
6.0 COMMISSIONING REQUIREMENTS
6.1 General pre-comm ss on ng checks relevant to safe operat on cons st of the
follow ng:
Ensure that no fore gn bod es are present w th n the fan or cas ng.
Check electr cal safety. e.g. Insulat on and earth ng.
Check guard ng of system.
Check operat on of Isolators/Controls.
Check fasten ngs for secur ty.
6.2 Other comm ss on ng requ rements are g ven n the relevant product documentat on.
7.0 OPERATIONAL REQUIREMENTS
7.1 Equ pment access panels must be n place at all t mes dur ng operat on of the
un t, and must be secured w th the or g nal fasten ngs.
7.2 If fa lure of the equ pment occurs or s suspected then t should be taken out of
serv ce unt l a competent person can effect repa r or exam nat on. (Note that
certa n ranges of equ pment are des gned to detect and compensate for fan fa lure).
8.0 MAINTENANCE REQUIREMENTS
8.1 Spec f c ma ntenance requ rements are g ven n the relevant product documentat on.
8.2 It s mportant that the correct tools are used for the var ous tasks requ red.
8.3 If the access panels are to be removed for any reason the electr cal supply to the
un t must be solated.
8.4 A m n um per od of two m nutes should be allowed after electr cal d sconnect on
before access panels are removed. Th s w ll allow the mpeller to come to rest.
NB: Care should still be taken however since airflow generated at some
other point in the system can cause the impeller to “windmill” even when
power is not present.
8.5 Care should be taken when remov ng and stor ng access panels n w ndy
cond t ons.
INFORMATION FOR SAFE INSTALLATION, OPERATION AND MAINTENANCE
OF NUAIRE VENTILATION EQUIPMENT
We declare that the machinery named below is intended to be assembled
with other components to constitute a system of machinery. All parts
except for moving parts requiring the correct installation of safety
guards comply with the essential requirements of the Machinery Directive.
The machinery shall not be put into service until the system has been
declared to be in conformity with the provisions of the EC Machinery
Directive.
Designation of machinery: Ecosmart Belt Dr ve S ngle Fan Xtractor
Machinery Types: ESX
Relevant EC Council Directives: 2006/42/EC (Mach nery D rect ve)
Applied Harmonised Standards: BS EN ISO 12100-1, BS EN ISO 12100-2,
EN60204-1, BS EN ISO 9001,
BS EN ISO 13857
Applied National Standards: BS848 Parts 1, 2.2 and 5
Note: All standards used were current and val d at the date of s gnature.
Signature of manufacture representatives:
Name: Pos t on: Date:
1) C. B ggs Techn cal D rector 26. 05. 16
2) A. Jones Manufactur ng D rector 26. 05. 16