Steps to verify the integrity of the installation’s wiring:
1. Verify the mains power supply to the panel and the connection of the protective earth (PE) to the board
terminals. The panel should be supplied by a separate line with its own circuit-breaker.
2. Using a multimeter measure the resistance between the protective earth (PE) terminal and the panel’s
earth bar. It should be less than 10 Ω.Higher values indicate bad panel grounding, and it is highly
dangerous and unsafe to operate it.
3. Optical inspection of each cable for possible wear/damage caused during the installation.
4. Optical inspection of each point connection for bad/wrong wiring.
5. If points are connected using a loop topology, using a multimeter measure the resistance between each
L+ and its corresponding LF+ line. It should be less than 60 Ω. Higher values indicate faulty
connections/cable and should be investigated and resolved.
6. If points are connected using a loop topology, repeat the previous step for loop cable, each L- and its
corresponding LF-line and each shield line start-finish.
7. If points are not connected using a loop topology (no return line), connect temporally the L-, L+ and its
shield, at the last point (end of line) together. Using a multimeter measure the resistance between the
start of L- and L+ line. It should be less than 60 Ω. Higher values indicate bad connections/faulty cable
and should be investigated.
8. If points are not connected using a loop topology, repeat the previous step for the L- or L+ line and its
shield. IMPORTANT: Remove the temporal connection at the end of the line between L-, L+ and its
shield.
9. Using a multimeter measure the resistance between each L+ and its corresponding L- line. It should be
more than 10 kΩ. Lower values indicate faulty connections/cable/short circuits and should be
investigated and resolved.
10. Using a multimeter measure the resistance between each L+ and its corresponding shield line. There
should be no circuit continuity (at least 10 MΩ). Lower values indicate faulty connections/cable/short
circuits and should be investigated and resolved.
11. Repeat the previous step between each L- and its corresponding shield line, each L+ and the protective
earth (PE) line and each L- and the protective earth (PE) line.
12. Every time a problem is detected and corrected on a line, all the check for this line should be repeated