
Colour High Volume Production System - Installation Guide
Pro C900 Page 5 of 24
Machine Run-up and Installation Requirements
The following items are required to run up and install the Pro C900/ Pro
C900s mainframe:
Qty Item Notes
6 Silicon Oil
Type SS
A257 9550
Three bottles of silicon oil for the machine (when on-site) and three
bottles for the customer. The Pro C900 / Pro C900s models are
shipped with enough silicon oil in the oil tank to complete the
workshop run-up procedure.
1 Mainframe
32 Amp
single
phase male
plug
Two types of plugs are recommended. The type of plug that needs to
be purchased will depend on the customer’s 32 amp female socket
location and type:
Clipsal Product Number 56PA332, 3 Round Pins, Angled Plug
Clipsal Product Number 56P332, 3 Round Pins, Straight.
1 Trained
Customer
Replaceable
Units
(TCRU) Kit
This kit will be delivered with every order. Ideally the TCRU items will
remain at the customer’s site.
1 Customer
Replaceable
Units (CRU)
Toner, finishing consumables, waste toner bottle (G178 6973). These
items will remain at the customer’s office.
1 Field
Replaceable
Unit (FRU)
Fusing unit (G178 4142). This item will remain at the customer’s
office.
1 Silicon Oil
Catcher
Tray
This tray will be required for the FRU fusing unit. The silicon oil
Catcher Tray is not available as a spare part. Please source a local
solution.
4 100gsm A4
non coated Four reams of 100gsm A4 non-coated paper
2 100gsm A3
non-coated Two reams of 100gsm A3 non-coated paper.
1 64mb
Machine SD
Card
NVRAM data, address book data and Fiery settings back-up. At
installation all address book information, NVRAM data and Fiery
settings will be backed up to an SD card. This item will remain at the
customer’s office.
1 19mm
Yellow
Tongue
Flooring
When flooring is required, Yellow Tongue flooring is the
recommended flooring type. It comes in various shapes and sizes.
Chosen sizes will need to suit the machine and finishing option
configuration so that the join between each floor board does not
coincide with the wheels of the mainframe or finishing option.
Please refer to the Production Range Dimension Calculator xls file to
determine flooring dimensions.
This calculator can be downloaded from the Technical Website/
Documents/ Pro C900 - Pro C900s / Installation Documents section.
Please use the following link;
http://partners.ricoh.com.au/web/aubase/technical/documents.nsf/
allbymodel/B1EF3252E8A986B8CA2575D00080D6C3?OpenDocument