
5.2 Preparations for installation ............................................................................................... 62
5.2.1 Requirements for installation ............................................................................................. 62
5.2.2 Insulation resistance .......................................................................................................... 63
5.2.2.1 Insulation resistance and polarization index ....................................................................... 63
5.2.2.2 Checking the insulation resistance and polarization index of the winding............................ 64
5.3 Installing the machine........................................................................................................ 67
5.3.1 Preparing the assembly area............................................................................................... 67
5.3.2 Lift the machine to where it will be mounted and position it............................................... 67
5.4 Alignment and fastening.................................................................................................... 68
5.4.1 Repainting/touching up the paint nish of explosion-protected machines............................ 68
5.4.2 Measures for alignment and mounting............................................................................... 68
5.4.3 Flatness of the supporting surfaces for conventional motors............................................... 69
5.5 Installing the machine........................................................................................................ 69
5.5.1 Preconditions for smooth, vibration-free operation............................................................. 69
5.5.2 Aligning the machine to the driven machine and mounting................................................ 70
5.5.2.1 Horizontal types of construction with mounting feet .......................................................... 70
5.5.2.2 Horizontal types of construction with ange....................................................................... 70
5.5.2.3 Vertical types of construction with ange........................................................................... 71
5.5.2.4 Type of construction without ange ................................................................................... 71
5.5.3 Removing the rotor shipping brace..................................................................................... 71
5.5.4 Recommended alignment accuracy.................................................................................... 72
5.5.5 Mounting the drive output elements.................................................................................. 72
5.5.5.1 Pulling on and pulling o drive output elements................................................................. 73
5.5.5.2 Diagram showing pulling on and pulling o drive output elements ..................................... 74
6 Electrical connection ........................................................................................................................... 77
6.1 Connecting the machine.................................................................................................... 78
6.1.1 Selecting cables ................................................................................................................. 78
6.1.2 Terminal box...................................................................................................................... 78
6.1.2.1 Terminal marking............................................................................................................... 79
6.1.2.2 Circuit diagram inside the terminal box cover ..................................................................... 79
6.1.2.3 Direction of rotation........................................................................................................... 79
6.1.2.4 Additional bores in the terminal box................................................................................... 80
6.1.2.5 Cable entry........................................................................................................................ 80
6.1.2.6 Thread sizes in terminal box............................................................................................... 81
6.1.3 Minimum air clearances ..................................................................................................... 81
6.1.4 Internal equipotential bonding........................................................................................... 82
6.2 Tightening torques............................................................................................................. 82
6.2.1 Cable entries, sealing plugs and thread adapters................................................................. 82
6.3 Connecting the grounding conductor................................................................................. 82
6.3.1 Grounding connection type................................................................................................ 83
6.4 Temperature sensor/anti-condensation heating connection ................................................ 85
6.4.1 Connecting optional integrated devices and equipment...................................................... 85
6.4.2 Auxiliary circuit connection................................................................................................ 85
6.5 Conductor connection........................................................................................................ 85
6.5.1 Connecting conductors ...................................................................................................... 86
6.5.2 Cable ends with wire end sleeves ....................................................................................... 89
6.5.3 Connection with/without cable lugs ................................................................................... 89
Table of contents
1MB..5/6 shaft height 71 ... 355
Operating Instructions, 11/2023, A5E52779956A 5