
Station Decoder Installation
Thestationdecodermoduleisavailablein1-station,2-station,or4-stationconfiguration.
Thestand-aloneGDCmodelcanhandleupto100stationsperoutputboard.Thesestationscanbeconnectedtotheoutput
boardterminalsinanyconfiguration(25stationsconnectedtoeachofthefourterminalpairsor100stationsconnectedtoone
terminalpair,etc.).Thedecodermodulescanbeconnectedinparallelanywhereonthetwo-wirecommunicationlineconnected
tothestationterminals.Eachstationcanactivateuptotwosolenoids.
WhenaTri-CommCellularmodemisinstalledinthe2ndoutputboardposition,themaximumnumberofstationsonthe
1stoutputboardisincreasedupto200stations.
Itisrecommendedthatthedecodermodulesareinstalledinanapprovedvalveboxtoprovideeasyaccesstothewiring.
Use3MDBR/Ytowaterproofallconnectors.
Recommended Controller-to-Decoder cable:14AWG(2.5mm2),solidcopper,jacketed2-conductor,directburial.
ThepreferredwiremakeandmodelisthePaigeIrrigationWire,SpecP7350D.
Recommended Decoder-to-Solenoid cable:14AWG(2.5mm2),solidcopper,2-conductor,directburial.Thepreferredwire
makeandmodelisthePaigeIrrigationWire,SpecP7351D.
Burial Depth
TororecommendsthattheController-to-DecoderandDecoder-to-Solenoidcablesshouldhaveaminimumcoverof6"
(150mm).Theirrigationplanmayspecifyadditionaldepthtobeconsistentwiththedepthofmainlineorlateralpipeworkand/
orsoilconditioningproceduressuchasaeration.Installationproceduresmustcomplywithallapplicablelocalandnational
electricalcodes.
•Useonlywireapprovedfordirectburialifinstallingthewiresundergroundwithoutconduit.
•Allfieldwiringsplicesmustbeaccessibletofacilitatetroubleshootingand/orservice.
Step 1 – Routecommunicationcablefromthecontrollertothestationdecodermoduleinstallationlocation.
Themaximumwirelengthbetweenthecontrollerandthedecodermoduleis15,000'(4500m).
Step 2 – Securethecommunicationwirestoterminal1oftheGDCoutputboard.Whitewireontothe1stterminalandblack
wireontothesecondterminal.SeeFigure 4.
Step 3 – Installthedecodermoduleinavalvebox.Recordthedecodermodule’saddressnumberfoundonthesidelabel.
Thisaddressnumberidentifiesthestation(s)thatthedecodermodulecontrol.
Step 4 – Securethecommunicationwirestothedecodermodule’sblackandwhitewires.Connecttheblackcommunication
wiretotheblackdecodermodulewire.Connecttheremainingcommunicationwire(redorwhite)tothewhite
decodermodulewire.Use3MDBR/Ytoproperlywater-proofallwireconnections.
Step 5 – Routeoutputwiresfromthedecodermoduletothesolenoid.
Themaximumwirelengthbetweenthedecodermoduleandthesolenoidis410'(125m).
Step 6– Connectthesolenoidwirestothedecodermodule’sstationwires.Thestationwiresarecolorcodedforeasy
identification.Connectthesolidcolored(red,green,orangeorblue)stationwiretothered/whitesolenoidwire.
Connectthesimilarcolorstationwirewithblackstripetotheblacksolenoidwire.Use3MDBR/Ytoproperlywater-
proofallwireconnections.
Step 7 – Connectanadditionalsolenoidtothestationwireasnecessary.
Eachstationhasamaximumloadoftwosolenoids.
Step 8 – RepeatSteps3–8foradditionaldecodermodules.