
7
CHECKLIST #3 : ROOM
A. Make sure you have power to operate your tools and the system
B. Ensure the power is in a convenient location
C. Clear the room for installation
D. Use the laser to check that the structural support is leveled
E. Mark both sides of the wall
this is where the side tracks will go
CHECKLIST #3 : ROOM