
Vertiv |NetSure 5100 Series Installation Manual (IM582137100)|Rev. Q
Assemblies Comprising the Power System Frame Grounding
Connection................................................................................................................................................................ 53
Central Office Ground Connection ................................................................................................... 53
Rectifier Nominal 120 VAC / 208 VAC / 240 VAC Input and AC Input
Equipment Grounding Connections................................................................................................55
Wiring Considerations...........................................................................................................................................55
To 19” or 23” Rectifier AC Input / Solar Converter DC Input Panel (List
40, 45) and 23” Rectifier AC Input Panel (List 46)....................................................................55
To Individual Module Mounting Assembly(s) Equipped with Molex
Connectors and Provided with Rectifier AC Input Cable Assemblies or
Rectifier AC Input Line Cords....................................................................................................................... 59
Solar Converter 140 VDC to 200 VDC / 200 VDC to 400 VDC Input
Connections............................................................................................................................................................ 60
Wiring Considerations.......................................................................................................................................... 60
To 19” or 23” Rectifier AC Input / Solar Converter DC Input Panel (List
40, 45).................................................................................................................................................................................. 60
To 23” Solar Connection Cabinet (List 61)........................................................................................63
To Individual Module Mounting Assembly(s) Equipped with Molex
Connectors and Provided with Solar Converter DC Input Cable
Assemblies.......................................................................................................................................................................63
-48 VDC System Connections to an Optional List 60 Hybrid
Connection Cabinet .........................................................................................................................................66
External Alarm, Reference, Monitoring, and Control Connections ................... 67
External Alarm, Reference, Monitoring, and Control Connection
Locations ...........................................................................................................................................................................67
System Interface Circuit Card Connections (if required).................................................. 70
RS485 Modbus Connection (if required)............................................................................................71
IB2 (Controller Interface Board) Connections (if required)...............................................71
Optional EIB (Controller Extended Interface Board) Connections (if
required).............................................................................................................................................................................79
Circuit Breaker Alarm and Shunt Monitoring Connections to an
Optional List 60 Hybrid Connection Cabinet.................................................................................85
Optional Customer Fuel Sensor Input ...................................................................................................87
Connecting a Device or System to the NCU CAN Bus (if required)....................... 88
NCU Controller Ethernet Connection (if required) ..........................................................88
Control Bus Connections between Controller and Module Mounting
Assemblies .................................................................................................................................................................91
Optional Transient Voltage Surge Suppressor (TVSS) Device
Ground Connection..........................................................................................................................................93
Load Connections..............................................................................................................................................97
Load Connections to a List 20, 25 Distribution Cabinet......................................................97
Load Connections to a List 21, 26 Distribution Cabinet....................................................102
Load Connections to a List 27 Distribution Cabinet ............................................................109
Load Connections to an Optional GMT Fuse Block............................................................... 112
Load Connections to a List KG Distribution Panel ................................................................. 113
Connections to an Optional List 60 Hybrid Connection Cabinet.....................114