
OSYBR20A-EN
5/6
INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS
GEAR DIMENSIONS
Valve size [mm]
K Actuator
BS
BR
VR
TR
LR
L3
T3
065
to
100
065
to
080
050
to
065
150 MAG-F07
125
to
150
100
to
125
080
to
100
300 MAG-F10
- 150
125
to
150
300 MAG-F12
HANDLING OF GEAR
• The handle wheel of the gear is removed and
shipped.
• Insert the handle into the gear shaft.
• Insert a pin into the hole in the handle.
HANDLING & STORAGE
HANDLING
Proper care in handling the valve should be taken to
prevent damage. Do not drop or throw it.
STORAGE
Store the valve in the protected area from dust,
moisture, and direct sunlight. If possible, should be
kept in the original packaging.
CHECKING
• Check the product code before installation.
• Confirm that there is no screw loose or part
deformation.
INSTALLATION
PRECAUTIONS
Before installing, clean pipe and valve ends.
Make sure they are free of dirt, dust and etc.
PIPING FLANGES
• VR type has a flow direction. Install the valve
accordingly.
• Specify the ST option if a steam fluid. Flow direction is
restricted by ST option. (BR / BS)
• Gasket should be selected appropriately to suit the
fluid, pressure and temperature.
Use spring washer to prevent from decreasing surface
pressure gasket when the temperature change
happens frequently.
• Tighten all bolts using crossover method to load the
joint evenly.
• Wafer type ball valve is put between two seats of
flanged-end and tightened with long bolts. (BS)
• In the TR / LR type, when the flow path is subjected to
a high pressure from arrow, it may leak slightly to the
low pressure port.
ENVIRONMENT
If there is a possibility that the fluid and drive part
freeze, please take measures to prevent freezing.
POSITIONING
Should be positioned through 90° upward from
horizontal. Provide space around the product to allow
manual operation, inspection and replacement work.
CAUTIONS FOR MAINTENANCE (T3 / L3)
Do not keep warm for maintenance of the valve gland.
φK
OPEN SHUT
Handle
Pin