manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. WEG
  6. •
  7. Circuit Breaker
  8. •
  9. WEG FHU ACW125 User manual

WEG FHU ACW125 User manual

#8-32 UNC
Tap
(4Holes)
4.212
(107)
1.18
(30)
0.433
(11)
4.251
(108) 4.685
(119) F
*Turn off the power before mounting, , wiring,
maintenance or inspection.
Failure to do may result in electric shocks and burns.
withdrawing
it
CAUTION
1. INSTALLATION INSTRUCTION
Figure. 1 and 2 show the location of the handle and door catch
when mounted on the enclosure.
FLANGE, OPERATING HANDLE (FHU ACW125)
2. HANDLE INSTALLATION-See Figures 3 and 4.
DANGER
TABLE1 MAXIMUM "E" DIMENSION
ENCLOSURE
DEPTH FHU-60 FHU-72
TABLE2 MAXIMUM " " DIMENSIONF
ENCLOSURE
DEPTH 62 cable 72 cable
<Fig. 2>
<Fig.3>
<Fig.1>
Dimensions: inch(mm)
Dimensions:inch
Dimensions:inch
1. Do not use deformed or damaged MCCB or operati handle.
2. Mounting, removal, wiring, maintenance and checking should
be done by authorized or certified .
3. Operati handle should not be used in severe environment
such as high temperature, humidity, dusty,corrosive gas and
excessive vibration.
4. Mounting should be done according to the instruction manual.
Mistakes on mounting may be a cause for a and
operation handle or cause an accident such as operator do
himself an injury.
ng
personnel
ng
ACW
1. Turn off and lock out all power supplying the circuit breaker and all
other equipment within the enclosure before installing.
2. Determine mounting location for the handle and circuit breaker. See
Figure. 1 and Tables 1 and 2.
3. The handle can be mounted on right side of flange type enclosures.
4. A latch is provided for applications where no interlocking door latch
mechanism is provided.
5. The PLATE ASS'Y BASE FH-1 mounts to the circuit breaker and
can be padlocked in the "OFF"position.
1. Secure O-RING into groove. Mount handle and frame to the
enclosure flange using the two M6X18 (+)PH, P/W screws. Tighten
screws to 75 in-lbs.
2. Place the PLATE FLANGE LINK onto the LINK CONNECTION PIN
and secure withthe E-ring, D8.
3. Attach the PLATE LOCK LINK to the PLATE LOCK FLANGE using the
M6X10 screw. Tighten nutsto25 in-lbs.
4. Close the enclosure door. This should release the PLATE LOCK LINK
allowing the handle to beturned ON. If the handle cannotbe turned ON,
adjustPLATE HOOKLOCKdownwardin itsslotand repeat item 4.
5. Turn handle ON and attempt to open door. The PLATE LOCK LINK
should hold the door closed. If the door can be opened, readjust the
PLATE HOOK LOCK upwardin its slot. Repeatsteps 3 and 4to insure
that the door can notbe opened whenthe handleis in the ON position.
handle
E
Be sure to read the instruction manual and safety precautions before
use products.
This manual should be given to the person who use products and
maintain them. SAFETY PRECAUTIONS
Before installation, wiring, operation, maintenance or inspection of
the device, be sure to read the warning message carefully and
ensurance proper operation.
Please follow the instructions, they are very important.
In this instruction, level of danger is classified by
UP DOWN UP DOWN
¤
¤
¤
¤
*
NOTE : THE MINIMUM BEND RADIUS FOR THE CABLE IS THREE&
ONE-HALF(3-1/2)INCHES.
Prepare the mounting holes for the handle and circuit breaker
and remove burrs.
F "UP"
F "DOWN"
E MAX
PLATEFLANGELINK
PLATELOCK LINK
M6X18
SCREW
PLATEASS'Y
FLANGE
O-RING
HANDLEASS'YFLANGE
GROOVE
E-RING,D8
PLATELOCK FLANGE
M6X10 SCREW
PLATELOCK LINK
LINKCONNECTIONPIN
8
DANGER
CAUTION It may result in death or serious injury.
It may result in injury or physical damage.
Installation Instruction
All manuals and user guides at all-guides.com
all-guides.com
3. BREAKER AND BREAKER OPERATOR INSTALLATION-See Figure. 5
1. Turn the circuit breaker ON.
2. Attach circuit breaker and PLATE ASS'Y,BASE FHU to the back
panel using four N .8-32 UNC screws as shown at Figure 5.
Tighten screws to 150 in-lbs.
O
3. Attach the PLATE FIXED CABLE TO PLATE ASS`Y BASE FH3
using M5x10 screw. Tighten screws to 25 in-lbs.
*DANGER- Confirmthat suppling power has been turned off.
*CAUTION-DON'T PUSH TRIP BUTTON WITHFINGERS.
4. CABLE INSTALLATION - See Figure. 6
1. Secure cable to PLATE ASS'Y FLANGE with HOLDER FLANGE
CABLE using M5X10 screws. Tighten screws to 75 in-lbs.
HOLDER FLANGE CABLE must interlock with groove in cable.
2. Move handle to OFF position and pull cable to it's maximum stroke
Shim cable connecting and attach into hole of LINK ASS'Y.
Secure with E-ring.
3. Attach end of cable to PLATE ASS'Y BASE FHU as described below.
NOTE: To ensure proper adjustment and to prevent possible damage to
the operator, Follow the remaining steps carefully.
4. Move the handle to it's maximum ON position.
5. Adjust the top cable mounting nut to M5 from start of cable thread as
shown in Detail A.
6. Insert end of the cable rod through the hole in the PLATE BAR TAB
And place the cable mounting threads into the slotted FIXED TAB
PLATE of the PLATE ASS'Y BASE FHU. Tight cable mounting nut
(M12) And adjustment nut (M12) until the cable is secured to the tab.
7. After install the mounting nut and adjustment nut. Handle is maximum
On position.
5. CABLE ADJUSTMENT
<Fig.4>
MANUAL INSTRUCTION FHU ACW125
1. Check that the circuit breaker turns OFF and ON by moving the
operating handle. If circuit breaker does not turn ON, loosen adjusting
nut and tight lower adj nut to PLATE BAR TAB.
Repeat if required.
2. Turn the circuit breaker ON and trip it by pushing the "trip" button (not
using your finger).
3. If the circuit breaker does not reset, loose the lower adj nut and tight
adjusting nut to PLATE BAR TAB.
Repeat if required.
*DANGER- Confirm that suppling power has been turned off.
*CAUTION-DON'T PUSH TRIP BUTTON WITH FINGERS.
<Fig.5>
<Fig.6>
Tap
N0.8-32 UNC
PLATE ASS'Y,
BASE FHU
NO.8-32 UNC 2A
Mounting Screw
Dimensions:inch(mm)
PLATEHOOK LOCK
1/4, NUT
ENCLOSURE
DOOR
1.
( )
71
43.6
1.
( )
48
37.6
1.
( )
16
29.7
1.
( )
12
28.4
7.48
190( )
1.988
50.5( )
1.1
28( )
2.36
60( )
0.09
2.3( )
2.598
66( )
1/4 in
2 Screws
2.32
59( )
3.72
94.6
(OFF)
( )
3.14
( )79.65
(ON)
1.72
43.6( )
2.7
68.6)(
<Detail.A>
PIN CABLE CONNECTING
E-RING, D8
GROOVE
HOLDER FLANGE CABLE M ¿10 SCREW5
CABLE MOUNTING NUT
PLATEASS'Y
FLANGE
PLATE BAR TAB
ADJUSTING NUT,M5
CABLE ROD
FIXED TAB PLATE
ACW125-HOLE
LINKASS'Y
PLATE ASS'Y
BASE FHU
LOWER ADJ NUT
All manuals and user guides at all-guides.com

Other WEG Circuit Breaker manuals

WEG AM DWA400 User manual

WEG

WEG AM DWA400 User manual

WEG ACW100 User manual

WEG

WEG ACW100 User manual

WEG UBW250 User manual

WEG

WEG UBW250 User manual

WEG ACW101V User manual

WEG

WEG ACW101V User manual

WEG UBW2500 User manual

WEG

WEG UBW2500 User manual

WEG ACW400 User manual

WEG

WEG ACW400 User manual

WEG DWB400 User manual

WEG

WEG DWB400 User manual

WEG DWA 630 User manual

WEG

WEG DWA 630 User manual

WEG UBW800S User manual

WEG

WEG UBW800S User manual

WEG UBW120 User manual

WEG

WEG UBW120 User manual

WEG MPW25 User manual

WEG

WEG MPW25 User manual

WEG VBWC Series Manual

WEG

WEG VBWC Series Manual

WEG UBW225 User manual

WEG

WEG UBW225 User manual

WEG DWB800 User manual

WEG

WEG DWB800 User manual

WEG DW-161 User manual

WEG

WEG DW-161 User manual

WEG AGW650 User manual

WEG

WEG AGW650 User manual

WEG DWB600 User manual

WEG

WEG DWB600 User manual

WEG ACW Series User manual

WEG

WEG ACW Series User manual

WEG ABW Series User manual

WEG

WEG ABW Series User manual

WEG CESTARI Worm Gearbox line User manual

WEG

WEG CESTARI Worm Gearbox line User manual

WEG CWB40 80 Series User manual

WEG

WEG CWB40 80 Series User manual

WEG MRX ACW100 User manual

WEG

WEG MRX ACW100 User manual

WEG EHU ACW400 User manual

WEG

WEG EHU ACW400 User manual

WEG UBW600 User manual

WEG

WEG UBW600 User manual

Popular Circuit Breaker manuals by other brands

GE EntelliGuard R7 installation manual

GE

GE EntelliGuard R7 installation manual

Larson Electronics MPD CB-SF-489 Series installation manual

Larson Electronics

Larson Electronics MPD CB-SF-489 Series installation manual

Eaton ZP-IHK installation instructions

Eaton

Eaton ZP-IHK installation instructions

Eaton Cutler-Hammer VCP-W Instructions for installation, operation and maintenance

Eaton

Eaton Cutler-Hammer VCP-W Instructions for installation, operation and maintenance

Eaton NZM1 XFI U Series Instruction leaflet

Eaton

Eaton NZM1 XFI U Series Instruction leaflet

Eaton BRMIKCSR installation instructions

Eaton

Eaton BRMIKCSR installation instructions

ABB Emax 2 Retrofill Installation and maintenance guide

ABB

ABB Emax 2 Retrofill Installation and maintenance guide

Eaton SPBT12-280 NPE50 Series Instruction leaflet

Eaton

Eaton SPBT12-280 NPE50 Series Instruction leaflet

TERASAKI TemBreak 2 T2PM12B instruction manual

TERASAKI

TERASAKI TemBreak 2 T2PM12B instruction manual

hager RCCB 25-63A quick start guide

hager

hager RCCB 25-63A quick start guide

GE AK-1-15 Series instructions

GE

GE AK-1-15 Series instructions

DRIESCHER-WEGBERG VSS Addition to Operation and Assembly Instructions

DRIESCHER-WEGBERG

DRIESCHER-WEGBERG VSS Addition to Operation and Assembly Instructions

IEK BA88-35 user manual

IEK

IEK BA88-35 user manual

hager TS 303 User instruction

hager

hager TS 303 User instruction

ABB SACE Emax 2 operating instructions

ABB

ABB SACE Emax 2 operating instructions

GE AM-4.16-250-6 INSTRUCTIONS AND RECOMMENDED PARTS FOR MAINTENANCE

GE

GE AM-4.16-250-6 INSTRUCTIONS AND RECOMMENDED PARTS FOR MAINTENANCE

Fonrich FR-DCBS-AFS8B user manual

Fonrich

Fonrich FR-DCBS-AFS8B user manual

TERASAKI TemBreak 2 E125 instruction manual

TERASAKI

TERASAKI TemBreak 2 E125 instruction manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.