manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. WHITECROFT LIGHTING
  6. •
  7. Lantern
  8. •
  9. WHITECROFT LIGHTING Cygnus SY User manual

WHITECROFT LIGHTING Cygnus SY User manual

Other WHITECROFT LIGHTING Lantern manuals

WHITECROFT LIGHTING Foil SRD Manual

WHITECROFT LIGHTING

WHITECROFT LIGHTING Foil SRD Manual

WHITECROFT LIGHTING Avenue Metro Suspended User manual

WHITECROFT LIGHTING

WHITECROFT LIGHTING Avenue Metro Suspended User manual

WHITECROFT LIGHTING ACL INDUSTRY Manual

WHITECROFT LIGHTING

WHITECROFT LIGHTING ACL INDUSTRY Manual

WHITECROFT LIGHTING Cygnus SX Manual

WHITECROFT LIGHTING

WHITECROFT LIGHTING Cygnus SX Manual

WHITECROFT LIGHTING Florin E3 Series Manual

WHITECROFT LIGHTING

WHITECROFT LIGHTING Florin E3 Series Manual

WHITECROFT LIGHTING Aerial Industry User manual

WHITECROFT LIGHTING

WHITECROFT LIGHTING Aerial Industry User manual

WHITECROFT LIGHTING TEGAN SLIM 600SQ User manual

WHITECROFT LIGHTING

WHITECROFT LIGHTING TEGAN SLIM 600SQ User manual

WHITECROFT LIGHTING Aerial Industry User manual

WHITECROFT LIGHTING

WHITECROFT LIGHTING Aerial Industry User manual

WHITECROFT LIGHTING Florin IP65 User manual

WHITECROFT LIGHTING

WHITECROFT LIGHTING Florin IP65 User manual

WHITECROFT LIGHTING Aerial Industry User manual

WHITECROFT LIGHTING

WHITECROFT LIGHTING Aerial Industry User manual

Popular Lantern manuals by other brands

DS Produkte TRF18P0752-1 instructions

DS Produkte

DS Produkte TRF18P0752-1 instructions

Stahl ECOLUX 6610 Series operating instructions

Stahl

Stahl ECOLUX 6610 Series operating instructions

SNOWJOE SUNJOE 24V-LGT500-CT Operator's manual

SNOWJOE

SNOWJOE SUNJOE 24V-LGT500-CT Operator's manual

PRG VARI LITE VL5 Service manual

PRG

PRG VARI LITE VL5 Service manual

Raytec VARIO2 series installation guide

Raytec

Raytec VARIO2 series installation guide

ENSA LEDBT18WS2 installation instructions

ENSA

ENSA LEDBT18WS2 installation instructions

LUG OFFICE LB LED N/T Installation instruction

LUG

LUG OFFICE LB LED N/T Installation instruction

Draper RLEDL19/B instructions

Draper

Draper RLEDL19/B instructions

Green Lighting TRI-SENSOR GL4612LU Assembly & fitting instructions

Green Lighting

Green Lighting TRI-SENSOR GL4612LU Assembly & fitting instructions

Panasonic EY3741B57 operating instructions

Panasonic

Panasonic EY3741B57 operating instructions

Clas Ohlson LCC8T instruction manual

Clas Ohlson

Clas Ohlson LCC8T instruction manual

Coolon WDN-140 manual

Coolon

Coolon WDN-140 manual

shada 1000436 instruction manual

shada

shada 1000436 instruction manual

BEGA 84 036 Instructions for use

BEGA

BEGA 84 036 Instructions for use

BEGA 33 596 Instructions for use

BEGA

BEGA 33 596 Instructions for use

Dale Tiffany GT701162 Assembly instructions

Dale Tiffany

Dale Tiffany GT701162 Assembly instructions

Wagan Brite Nite Pop-Up USB Lantern user manual

Wagan

Wagan Brite Nite Pop-Up USB Lantern user manual

Eaton Crouse-Hinds Pauluhn DLLA M2 Series Installation & maintenance information

Eaton

Eaton Crouse-Hinds Pauluhn DLLA M2 Series Installation & maintenance information

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

Whitecroft Lighting Limited
Burlington Street, Ashton-under-Lyne, Lancashire OL7 0AX
Telephone +44 (0)870 5 087 087 Facsimile: +44 (0)870 5 084 210
Registered No. 3848973 England Registered Office:
As above
Cygnus SY
Installation Leaflet
October 2015 - Rev B
GENERAL INFORMATION
1) Please follow the instructions overleaf in sequence.
2) A qualified electrician, in accordance with IEE wiring regulations, should carry out
connection to mains wiring.
3) TURN THE POWER OFF DURING MAINTENANCE!
4) Ensure that the rated voltage and frequency requirements are compatible with the
available mains supply.
5) Damaged components must be replaced with new ones of the same type.
6) Always make sure the diffuser surface is cleaned of dirt and other foreign matter.
7) Cleaning of reflectors and lenses should be carried out using clean, soft and lint
free cloths and anti-static cleaning fluid.
8) Suitable for indoor and outdoor installation.
9) Photobiological safety: Exempt group at a distance of 1.5m, according to EN
62471:2008
10) The LED light source contained in this luminaire shall only be replaced by the
manufacturer or his service agent or a similarly qualified person.
11) Replaced damaged protective shields with manufacturers spare parts only.
12) The LED luminaires are protected against overvoltage, such as electrostatic
discharge, with protective impedance made to comply with BS EN 60598.
13) Some luminaires installed in outdoor environments may experience a build-up of
internal condensation. This is due to a difference in temperature between inside
and outside the luminaire which is quite common and acceptable under BS EN
60598.
Please note: All images shown are for illustration
purposes
and should be used as a reference guide only.
TECHNICAL SUPPORT
Tel: 0161 331 5700
E-mail: [email protected]
www.whitecroftlighting.com
PK/LEAF/CYGNSY
Fig.8 Orientation /
alignment of fittings.
The Cygnus SY is an Exterior post top
luminaire. The product is Class II insulated
and does not require an earth connection.
Each Cygnus SY luminaire is shipped
in one single package:
Before commencing installation, check contents of carton to ensure that all components
are present and in good condition.
1. Driver Housing – Contains insert for 60mm poles
2. Lamp Housing
3. Connector Kit – Bagged terminal block, cable gland and M6x16 screws
Height
mm Dia
mm Max Weight
Kg Surface
exposed to
wind
605 400 5.9 0.076m
2
Fig.
6
INSTALLATION SEQUENCE
It is recommended that the fitting is
assembled prior to screwing to the top of the
post.
Housing Assembly
1. Remove the fitting from the
packaging (be careful separating the
cardboard inserts as the driver
housing sits loose inside).
2. Connect the two pole plugs.(Fig. 6,
Step 3)
3. Attach the driver housing to the lamp
housing. Ensure the gasket seal is
free from dirt and debris prior to
tightening the M6 screws to a torque
of 2Nm. Make sure the rubber o-
rings are attached to each
screw.(Fig. 6, Step 4/5)
Wiring
4. Strip back supply cable (not
included) as shown. Cores should
be 1.5-2.5mm
2
.(Fig.2)
5. Feed cable through gland, push live
and neutral wires into the screw
terminals and tighten.(Fig.3)
6. Snap terminal plug into gland before
tightening around cable.(Fig.4)
7. Connect the mains flex connector to
the driver housing connector and
secure using bayonet feature.(Fig.5)
Mounting to column
8. Pull the mains flex and connector
out of the base of the driver housing.
(Fig. 6, Step 1)
9. The housing comes with an insert for
a 60mm diameter post which should
be in place and fixed with the M6 x
24mm grub / blind set screws.(Fig.7)
10. For a 76mm pole remove the insert,
taking care not to lose the nuts that
the screws fasten to (these are not
held captive in the housing) and re-
fit with the M6 x 16mm screws. For
each variant screws should be
tightened to a torque of 6Nm.(Fig.7)
Specification
If the product is to be
installed on fibreglass
poles, the LED circuit can
develop very high electrical
potential that would
damage the luminaire.
Therefore in this case it is
recommended to carry out
equipotential bonding
between the fixture’s metal
frame and the ground
terminal.
Fig.
1
Installation of Class 2 luminaires on
fibreglass poles
WIRING CONNECTIONS
Fig.
7
Fig. 2
Fig.
3
Fig.
4
Fig.
5