EnglishDeutsch
 logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. ABB
  6. •
  7. Industrial Equipment
  8. •
  9. ABB Stanilite evago User manual

ABB Stanilite evago User manual

Other ABB Industrial Equipment manuals

ABB HT580738 User manual

ABB

ABB HT580738 User manual

ABB HT580667 User manual

ABB

ABB HT580667 User manual

ABB HT843855 User manual

ABB

ABB HT843855 User manual

ABB HT582447 User manual

ABB

ABB HT582447 User manual

ABB UA16 RA Series User manual

ABB

ABB UA16 RA Series User manual

ABB HT842114 User manual

ABB

ABB HT842114 User manual

ABB DODGE COOL LUBE 2 User manual

ABB

ABB DODGE COOL LUBE 2 User manual

ABB PT004116 User manual

ABB

ABB PT004116 User manual

ABB HT604083 User manual

ABB

ABB HT604083 User manual

ABB TZIDC-200 User manual

ABB

ABB TZIDC-200 User manual

ABB A150-M User manual

ABB

ABB A150-M User manual

ABB Terra DC wallbox User manual

ABB

ABB Terra DC wallbox User manual

ABB A165-L User manual

ABB

ABB A165-L User manual

ABB HT845232 User manual

ABB

ABB HT845232 User manual

ABB HT567585 User manual

ABB

ABB HT567585 User manual

ABB HT607323 User manual

ABB

ABB HT607323 User manual

ABB HT546409 User manual

ABB

ABB HT546409 User manual

ABB UniSec User manual

ABB

ABB UniSec User manual

ABB HT576644 User manual

ABB

ABB HT576644 User manual

ABB HT611076 User manual

ABB

ABB HT611076 User manual

ABB A145-M56 User manual

ABB

ABB A145-M56 User manual

ABB XAC24061 User manual

ABB

ABB XAC24061 User manual

ABB HT611333 User manual

ABB

ABB HT611333 User manual

ABB HT841994 User manual

ABB

ABB HT841994 User manual

Popular Industrial Equipment manuals by other brands

Mark 7 Evolution user manual

Mark 7

Mark 7 Evolution user manual

Husky HyPET Original instructions

Husky

Husky HyPET Original instructions

bora PM-1800 user manual

bora

bora PM-1800 user manual

Grizzly T32428 owner's manual

Grizzly

Grizzly T32428 owner's manual

Siemens 8MF1 Series operating instructions

Siemens

Siemens 8MF1 Series operating instructions

Phoenix PHX-150 user guide

Phoenix

Phoenix PHX-150 user guide

Hermetica 10 Series user manual

Hermetica

Hermetica 10 Series user manual

HORNER OEE Solution manual

HORNER

HORNER OEE Solution manual

Hammerhead HG375 parts manual

Hammerhead

Hammerhead HG375 parts manual

SCHUNK VERO-S NSE-A3 138 Assembly and operating manual

SCHUNK

SCHUNK VERO-S NSE-A3 138 Assembly and operating manual

Webasto GSE CAN installation guide

Webasto

Webasto GSE CAN installation guide

BAC BCP2D Installation, Operating, Maintenance

BAC

BAC BCP2D Installation, Operating, Maintenance

M&C SP Series instruction manual

M&C

M&C SP Series instruction manual

Raven DCS 700 Installation and service manual

Raven

Raven DCS 700 Installation and service manual

Maxcess FIFE D-MAXE 3 Quick reference guide

Maxcess

Maxcess FIFE D-MAXE 3 Quick reference guide

MachineryHouse SW4000 instruction manual

MachineryHouse

MachineryHouse SW4000 instruction manual

Dover Triton 9610 installation guide

Dover

Dover Triton 9610 installation guide

turck DI80-N quick start guide

turck

turck DI80-N quick start guide

https://manuals.online logo
https://manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2026 Manuals.Online. All Rights Reserved.

—
INSTALLATION MANUAL
Stanilite®
Platinum exit LED evago
DALI emergency
Doc no. 29-00309_1
This document covers What’s inside the box
Safety warning Exit LED evago
Installation instructions Installation manual
Testing precautions Warranty information
Troubleshooting guide
Troubleshooting guide
If you have installed and connected the fitting as per the instructions listed earlier and it does
not function correctly, use the following table as a guide to fixing the problem. Look up the
type of fault in the left column and check the possible causes from the right column.
If the fitting still does not work after checking these possible causes, contact ABB customer
service in Australia on 1800 60 20 20.
—
ABB Australia Pty Limited
For enquiries
ABB contact centre: 1800 60 20 20
E-mail: AU-ABB-Stanilite@abb.com
www.stanilite.com.au © Copyright 2020 ABB. All rights reserved.
9AKK107046A0978 - A - Feb 2020
No. Fault Possible causes
LED light source and indicating LED not lit AC supply not connected; or
AC supply turned off
LED light source is lit but indicating LED not lit Battery not connected or faulty
LED light source does not switch to emergency
mode when the test button is pressed
Test switch damaged; or
Battery not connected or faulty
LED light source works momentarily on emergency
when the test button is pressed

Thank you for choosing ABB product
Please read this document thoroughly before
commencing installation and retain for future
reference. Contact ABB customer service in
Australia on 1800 60 20 20 if you need any
assistance. The installation instructions were
correct at the time of print. To reflect changes in
technology and Australian standards; ABB
reserves the right to amend the instructions
without notice. Updated document can be found
on the Stanilite website.
Safety warning
In Australia and New Zealand, only licensed
electricians are permitted by law to work with
240 volt electrical installations.
Do not attempt to install or connect this product
unless you are a licensed electrician.
Turn off and isolate the electrical supply before
connecting this fitting to the building wires.
Do not touch the terminals of the terminal block
when the light fitting is energised.
The only user-serviceable part is the battery
pack. LED light source is not user-serviceable.
Do not attempt to service other parts of the
fitting as this will void the warranty.
As the installer, it is your responsibility to ensure
compliance with all relevant building and safety

the applicable standards for data and mains
cabling installation procedures and
requirements.
DALI (Digital Addressable Lighting Interface)
DALI is widely acknowledged as being an open
protocol as defined under IEC 62386 and is
designed only for communication in lighting
systems.
ABB exit and emergency luminaire with DALI
functionality comply with DALI standard IEC
62386.
The DALI evago wiring consists of additional 2
control wires apart from the active and neutral

product.
Note: No mains or mains carrying cables are to
be connected to DALI terminals or 2 control
wires (white and black).
Important to note:
• This product is designed for indoor use only.
Important: Carefully read this installation manual before installing or using the fitting. This
installation manual provides important information about the correct installation, use,
maintenance and disposal of this product.
Please observe the following guidelines
1. The fitting should only be installed by qualified personnel and installation must be in accordance
with AS/NZS 3000 and local regulations.
2. This product may not be modified in any way what so ever or used for a purpose or in an environment
other than for which it is designed. Failing to observe these guidelines will invalidate the warranty
and the compliance of this product.
3. Before installing the fitting, the supply must be isolated.
4. The light source in this fitting is non-replaceable.
Installing and connecting
1. This fitting should be connected to the voltage equivalent to that indicated on the type label. This
fitting is fitted with a terminal block suitable for loop-in-loop-out connection. The earth terminal
is provided for convenience of wiring through only and should not form part of any protective
shield. For further information on the different connection possibilities, see the instructions in
this installation manual.
Installation instructions
Important: Triangular markings indicate how to place the e-box with respect to the first-fix. Check
correct orientation before placing first-fix.
Connecting Exploded view
Connecting
Connect
230 - 240V 50Hz
MAX 10A
138
43
Niet continu
Non-maintained
Non continu
Continu
Maintained
Continu
Maintained
2
Screw
1
Ceiling
3
Close wire cover
5
Place pictograph plates
4
Place e-box
6
Screw
Wall
43
5
Close wire cover Place e-box
Screw
Triangular markings indicate how to place the e-box with respect to the first fix.
Check correct orientation before placing first fix.
PLEASE NOTE!
! !
Cable size
max. 4 x 2.5mm²
strip 8mm
Accessories
Junction box cover
Spacer
Erklärung - Explanations
Exploded view
Connect mains
240V / 50Hz
Initial energising
After 24 hours the luminaire is fully commissioned.
b
l
i
n
k
b
l
i
n
k
wait
60h24h
100%0-30%
Only self-contained luminaires
First Fix
Wall bracket
E-box
Lightguide
Explanations
b
l
i
n
k
b
l
i
n
k
OK
Emergency mode
In test
Failure
Non-maintainedMaintained Switched
maintained
Ceiling Wall
Connecting
max. 4 x 2,5 mm²
Connect
230 - 240V 50Hz
MAX 10A
138
43
Niet continu
Non-maintained
Bereitschaftsschaltung
Non continu
Non-maintained
Continu
Maintained
Dauerschaltung
Continu
Maintained
Geschakeld
Switch-maintained
Geschaltet
Couplé
Switched maintained
CIS /
BUS / MD
DIM /
CINEMA + -+ -
2
Screw
1
Ceiling
3
Close wire cover
5
Place pictograph plates
4
Place e-box
6
Screw
Wall
43
5
Close wire cover Place e-box
Screw
Triangular markings indicate how to place the e-box with respect to the first fix.
Check correct orientation before placing first fix.
PLEASE NOTE!
! !
Connecting
max. 4 x 2,5 mm²
Connect
230 - 240V 50Hz
MAX 10A
138
43
Niet continu
Non-maintained
Bereitschaftsschaltung
Non continu
Non-maintained
Continu
Maintained
Dauerschaltung
Continu
Maintained
Geschakeld
Switch-maintained
Geschaltet
Couplé
Switched maintained
CIS /
BUS / MD
DIM /
CINEMA + -+ -
2
Screw
1
Ceiling
3
Close wire cover
5
Place pictograph plates
4
Place e-box
6
Screw
Wall
43
5
Close wire cover Place e-box
Screw
Triangular markings indicate how to place the e-box with respect to the first fix.
Check correct orientation before placing first fix.
PLEASE NOTE!
! !
Connecting
max. 4 x 2,5 mm²
Connect
230 - 240V 50Hz
MAX 10A
138
43
Niet continu
Non-maintained
Bereitschaftsschaltung
Non continu
Non-maintained
Continu
Maintained
Dauerschaltung
Continu
Maintained
Geschakeld
Switch-maintained
Geschaltet
Couplé
Switched maintained
CIS /
BUS / MD
DIM /
CINEMA + -+ -
2
Screw
1
Ceiling
3
Close wire cover
5
Place pictograph plates
4
Place e-box
6
Screw
Wall
43
5
Close wire cover Place e-box
Screw
Triangular markings indicate how to place the e-box with respect to the first fix.
Check correct orientation before placing first fix.
PLEASE NOTE!
! !
Connecting
Connect
230 - 240V 50Hz
MAX 10A
138
43
Niet continu
Non-maintained
Non continu
Continu
Maintained
Continu
Maintained
2
Screw
1
Ceiling
3
Close wire cover
5
Place pictograph plates
4
Place e-box
6
Screw
Wall
43
5
Close wire cover Place e-box
Screw
Triangular markings indicate how to place the e-box with respect to the first fix.
Check correct orientation before placing first fix.
PLEASE NOTE!
! !
Cable size
max. 4 x 2.5mm²
strip 8mm
Important: 24 hours is required to allow the fitting battery to reach full capacity, ie: prior to a
discharge test. As the installer, it is your responsibility to conduct the initial discharge testing of
the installed fitting. Refer to AS/NZS 2293.
Testing precautions
Once the fitting is permanently connected to the
mains supply, a commissioning discharge test as
required in AS/NZS 2293.2 must be carried out.
You will need to allow 24 hours for the battery to
fully charge prior to conducting this test,

requires that fittings operate in emergency mode
for a period not less than 2 hours for their
commissioning test and for not less than 90
minutes thereafter (it is required that 6 monthly

keep the records for the commissioning test and
enter them into the building emergency services
logbook or via other recording methods as
allowed by AS/NZS 2293.2.
Construction sites
Continuously switching off the mains power
supply that is connected to emergency light
fittings during the construction phase of an
installation will cause these fittings to discharge
and charge their batteries many times over a
short period; this can shorten life of the battery.
ABB does not recommend such practices and
may not honour the warranty on batteries when
they are subjected to such harsh operating
conditions. Emergency light fittings are designed
to be discharge tested once every 6 months as
per AS/NZS 2293.2, subjecting the product to
repeated discharge or charge cycles is regarded
as an abuse of the fittings.
1. 