ABB EV1 User manual

1/17
—
ENERGY METER
EV1
User Manual
EV1
User Manual
Document ID: 9AKK107991A9875
Revision: C
2022-04-19

2/17
Disclaimer
The information in this document is subject to change without notice and
should not be construed as a commitment by ABB S.p.A.. ABB S.p.A.
assumes no responsibility for any errors that may appear in this
document.
In no event shall ABB S.p.A. be liable for direct, indirect, special, incidental
or consequential damages of any nature or kind arising from the use of
this document, nor shall ABB S.p.A. be liable for incidental or
consequential damages arising from use of any software or hardware
described in this document.
Copyrights
This document and parts thereof must not be reproduced or copied
without written permission from ABB S.p.A., and the contents thereof
must not be imparted to a third party nor used for any unauthorized
purpose.
The software or hardware described in this document is furnished under
a license and may be used, copied, or disclosed only in accordance with
the terms of such license.
© Copyright 2020 ABB S.p.A. All rights reserved.
Trademarks
ABB S.p.A. is a registered trademark of the ABB Group. All other brand or
product names mentioned in this document may be trademarks or
registered trademarks of their respective holders.
Contact
ABB S.p.A.
Via Dell'industria, 18
20009 – Vittuone – Milano
Italy
Tel. +39 02 2415 0000

3/17
Table of Contents
1General Information .................................................................................................................. 4
1.1 Responsibility .............................................................................................................................. 4
1.2 Common safety instructions ................................................................................................... 4
Danger .............................................................................................................................................. 4
1.3 Service and warranty instructions.......................................................................................... 4
1.4 Disposal (product end of life information)........................................................................... 4
1.5 Environment..................................................................................................................................5
1.6 Service and Warranty ..................................................................................................................5
1.7 Cyber Security Disclaimer..........................................................................................................5
1.8 Symbols..........................................................................................................................................5
2Technical data .............................................................................................................................7
2.1 Abbreviations................................................................................................................................7
2.2 Technical specifications .............................................................................................................7
2.2.1 Technical Standards ................................................................................................. 9
3Dimension, Assembling and Installation EV1 012-100 ..........................................................10
3.1 Assembling and dimensions ...................................................................................................10
3.2 Installation...................................................................................................................................12
3.3 Protection Housing and sealing .............................................................................................13
4Nameplate .................................................................................................................................14
5LCD-Display ...............................................................................................................................15
6Test LED .....................................................................................................................................16
7Components ..............................................................................................................................16
7.1 Block diagram.............................................................................................................................16
8Functionality ............................................................................................................................. 17
8.1 Measurement.............................................................................................................................. 17
8.1.1 Instantaneous parameter measurements.......................................................... 17
8.2 Fatal Error.................................................................................................................................... 17
9RS485 Interface & Registers .................................................................................................... 17

4/17
1General Information
1.1 Responsibility
The owner or provider is responsible for the proper use of the device. The installation, put-
ting into operation and reinstallation of the meter is only allowed to be done by electrically
skilled persons, which got knowledge about the contents of this user manual.
1.2 Common safety instructions
For installation, setting into operation and installation of the device the local requirements
for safety requirements must be observed.
Danger
Inappropriate use of parts under high voltage may lead to grave injuries and ac-
cidents, which may be fatal even with 230V.
The conductors which are connected to the device must be disconnected to the
mains during assembling and installation. It must be used a prevention for be-
ing switched on accidentally.
The device is not allowed to be used out of specifications.
1.3 Service and warranty instructions
Damaged devices can’t be repaired by you. The warranty and liability will be terminated with
opening the device. The same applies to damages caused by external influences.
For the device no servicing is required.
1.4 Disposal (product end of life information)
This meter was designed and built by ABB to provide many years of service and is backed by
our commitment to provide high quality support. When it eventually reaches the end of its
serviceable life, it should be disposed in accordance with local or national legislation.

5/17
1.5 Environment
This meter is designed for indoor or in a cabinet environment only (avoiding extreme weather
conditions) in accordance with EN50470-1 and EN50470-3, with the terminal cover fitted.
1.6 Service and Warranty
This meter product is warranted against defects in material and workmanship for a period of
one year from date of shipment. During the warranty period ABB will at its option, either re-
pair or replace products which prove to be defective. For warranty service or repair, this prod-
uct must be returned to a service facility designated by ABB. ABB does not warrant that the
operation of the meter or firmware will be uninterrupted or error free.
Damaged devices can’t be repaired by you. The warranty and liability will be terminated with
opening the device. The same applies to damages caused by external influences.
For the device no servicing is required.
1.7 Cyber Security Disclaimer
EV meter is designed to be connected and to communicate information and data via a net-
work interface, which should be connected to a secure network. It is your sole responsibility
to provide and continuously ensure a secure connection between the product and your net-
work or any other network (as the case may be) and to establish and maintain appropriate
measures (such as but not limited to the installation of firewalls, application of authentica-
tion measures, encryption of data, installation of antivirus programs, etc.) to protect the me-
ter, the network, its system and interfaces against any kind of security breaches, unauthor-
ized access, interference, intrusion, leakage and/or theft of data or information. ABB S.p.A.
and its affiliates are not liable for damages and/or losses related to such security breaches,
unauthorized access, interference, intrusion, leakage and/or theft of data or information.
Although ABB S.p.A. provides functionality testing on the products and updates that we re-
lease, you should institute your own testing program for any product updates or other major
system updates (to include but not limited to code changes, configuration file changes, third
party software updates or patches, hardware change out, etc.) to ensure that the security
measures that you have implemented have not been compromised and system functionality
in your environment is as expected.
1.8 Symbols
Danger through Electric Voltages
The symbol indicates warnings, which may lead to personal inju-
ries or death if it is ignored. Take all necessary precautions to
avoid danger!

6/17
Warning
The symbol indicates warnings to a possible dangerous situation
which may lead to personal injuries or damage to properties.
Avoid dangerous situations!
Attention!
“Attention” indicates warnings, which may lead to damage of
properties if not observed.
Notice
“Notice” indicates important information in the manual.

7/17
2Technical data
2.1 Abbreviations
+A Import active energy (to customer)
EN European Standard
Imp/kWh Quantity of pulses each kWh
LCD Liquid Crystal Display
LED Light Emitting Diode
OBIS Object Identification System
+P Import active power
2.2 Technical specifications
Type
One phase direct
Voltage
Nominal voltage Un
230 Vac
Voltage range
0.8 –1.15Un
Frequency
Nominal frequency fn
50 Hz
Frequency range
0.98 –1.02 fn
Current
Reference current Iref = Ib = 10 Itr
5 A
Maximum current Imax
65A
Minimum current Imin
0.25 A
Starting current Ist
0.004 Ib
Accuracy
Cl. B
Class B in compliance with EN 50470-3
Measuring Active Energy
Two Energy Directions
+A reverse locking

8/17
Meter constant
LED-Output
1000 Imp/kWh
Display
LCD
6 digits
Life cycle
> 12 years
RS485- Data Interface
Connector
Two screws type
Parameter
9600/19200/38400 bps, 8E1/8N1/8O1
Communication protocol
Modbus RTU
Power Consumption
Voltage circuit
< 0.4 W / 5.5VA at Un
Current circuit
< 0.012 VA at Ib
Temperature Range and humidity
Typical Operation
-30°C to +70°C
Storage
-40°C to +85°C
Humidity
95% RH non condensing
EMC Properties
Isolation
4 kV AC, 50 Hz, 1min
High Voltage
7kV, Impulse 0.1/2000 µs
Housing
Dimension
DIN-Rail 86x35x62 mm
Material
fiber-glass reinforced Polycarbonate
(flame resistant EN 62053-21)
Class of protection
II
Degree of protection
IP21 (IP 51 in protective enclosure)
Weight
Weight
appr. 0,13 kg
Environment
Mechanical environment
Class M1 as per 2014/32/EU Directive.
Electromagnetic environment
Class E2 as per 2014/32/EU Directive.
Tab. 1: Technical Properties

9/17
2.2.1 Technical Standards
EN 50470-1: Electricity metering equipment (AC) -Part 1: General requirements, test and
test conditions Metering equipment (class indexes A, B, and C);
EN 50470-3: Electricity metering equipment (AC) -Part 3: Particular requirement Static me-
ters for active energy (class indexes A, B, and C);
EN 50022: Low voltage switchgear and control gear for industrial use; mounting rails,
top hat rails, 35 mm wide, for snap-on mounting of equipment
IEC 62053-21: Static meters for active energy (classes 1 and 2)
IEC 62052-11: Electricity metering equipment (AC)-General requirements, tests and test con-
ditions –part 11: metering equipment

10/17
3Dimension, Assembling and Installation
EV1 012-100
3.1 Assembling and dimensions
The meter constructed for assembling on DIN-rail TH 35-7.5 according to IEC 60715.
1. Housing
Nr.
Element
1
Meter Hook
2
LCD
3
DIN rail space
4
Meter cover
5
Meter case
6
Terminal Block with cover

11/17
2. Housing dimension (mm)
3. Terminal block

12/17
3.2 Installation
The connection diagram printed on the housing needs to be considered connecting the me-
ter to the mains power.
4. Connection diagram
Nr.
Terminal
Terminal
Nr.
Terminal-
Ø[mm]
Terminal screw
Torque M [Nm]
1
Current In L1
1
6,3*5,6
(L*W)
M4
Pozidrive PZ1
Philips PH1
1,2 Nm< M < 1,5Nm
2
Current Out L1
3
3
Voltage
4
Data Interface
1
RS485 Interface B
22
5,0 x 3,2
(L*W)
M3 Pozidrive PZ1
Philips PH1
0,5Nm < M < 0,7Nm
2
RS485 Interface A
23
Warning
The requirements of the net provider need to be full filled.
Selective hedges must be used according to requirements of the net providers.

13/17
Attention!
Damage of the terminals due to high torque
The specified maximum torques must not be exceeded!
Ensure that the connected lines are fixed with the needed torque compliant to
EN 60999 for a safe connection. The needed torque depends on the type of used
lines and the maximum current.
3.3 Protection Housing and sealing
As indicated in image 1, the cover of the terminal blocks can be sealed after installation.
The assembled meter base and meter cover will be protected against unauthorized opening
with a manufacturer label (format 8x20 mm, corner radius 0.5 mm) on both sides of the hous-
ing
Important
Warranty and accuracy are void if sealing labels are removed.

14/17
4Nameplate
5. EV1 Nameplate
Nr.
Element
Function
1
Sealing terminal cover
2
Manufacture year
3
Technical nominal data
4
LCD
6 digits without decimal
5
Serial number
number and barcode 128
6
LED
test LED 1000 Imp/kWh
7
Symbols
single phase
protection class
reverse locking
8
Meter type
EV1 012-100

15/17
9
Firmware version
Will be consistent with the actual certified version
10
Number approval docu-
ment
year of certification
CE sign, year of certification, named body for MID
approval
5LCD-Display
The LCD has the following format:
- LCD size: 24.39mm × 9mm
- Digit size: 2.72mm × 6mm
6. EV1 LCD
The counter value of energy for +A is displayed. On the right side the unit kWh is printed on
the housing.
Configurable display items:
Modbus
Address
Register
Units
LCD displayed
5B14
Active power
W
yes
5B00
Voltage
V
yes
5B0C
Current
A
yes
5B2C
Frequency
Hz
yes
5B3A
Power factor
-
yes
0402
Serial number
-
yes
8908
Firmware version
-
yes
8912
Check Sum
-
yes
5000
Current_Total-(Import kWh)
kWh
yes

16/17
6Test LED
The meter has one pulse LED for active energy with 1000 Imp/kWh.
The ON-time of a pulse is 40 ms.
7Components
7.1 Block diagram
MCU
Display
EEPROM
RS485 Interface
LED
Pulse
Output
Power
Current and voltage sampling
A/D
Input
I
V
7. Block diagram
Current measuring: Manganin shunt
Voltage measuring: Resistor divider
A/D: Analog to digital converter for the sampled voltage and cur-
rent
MCU: Micro Controller Unit
Communication interface: RS485-Interface
Data storage EV1: Nonvolatile storage for energy register +A and meter parame-
ter in EEPROM
Display EV1: LCD with 6 digits
LED Pulse output: Active energy +A 1000 Imp/kWh

17/17
8Functionality
8.1 Measurement
The meter measures one phase active energy +A with accuracy class B.
8.1.1 Instantaneous parameter measurements
The instantaneous values can be read out via RS485 interface.
● Voltage and current
● Power factor
● Active power
● Frequency
8.2 Fatal Error
The meter has implemented a self-monitoring system. If the meter recognizes improper op-
eration so that billing relevant values may not be used anymore, it displays “--FF--”. This sta-
tus will be indicated with current display items flashing (1Hz).
9RS485 Interface & Registers
Default Modbus settings:
Baud rate = 9600 (settable)
Device Address = 1 (settable)
Parity = Even
Stop bit, parity bit and data bit can be configured via Modbus as 8E1, 8N1 or 8O1.
Registers are listed in document 9AKK107992A5721
Table of contents
Other ABB Measuring Instrument manuals

ABB
ABB C1900 Series User manual

ABB
ABB FXE4000 Training manual

ABB
ABB EV3 User manual

ABB
ABB ReliaGear ASPMETER A 42 Installation and operation manual

ABB
ABB AWT210 User manual

ABB
ABB FSM4000 Series Installation and operation manual

ABB
ABB MagMaster User manual

ABB
ABB 10D1475 User manual

ABB
ABB EIB Delta User manual

ABB
ABB GLA133 Series User manual

ABB
ABB ProcessMaster FEP630 series User manual

ABB
ABB MACHsense-R User manual

ABB
ABB ProcessMaster FEM630 User manual

ABB
ABB LS4000 User manual

ABB
ABB 8235 Chloride User manual

ABB
ABB Endura AZ40 User manual

ABB
ABB NETA-21 Installation manual

ABB
ABB AW101 User manual

ABB
ABB HART FEP300 Installation and operation manual

ABB
ABB ZEE600 User manual