ELECTRIC CONNECTIONS
The WRL heat pumps are completely wired at
the factory and only require connecon to the
electrical mains, downstream from a unit switch,
according to that envisioned by the Standards in
force on this subject in the country of installation.
It is also advised to check that:
• The electrical mains features are suitable
for the absorpon values indicated in
the electrical data table, TAB. also taking
into consideraon any other machines
operang at the same me.
• The unit is only powered when installaon
has been completed (hydraulic and
electric).
• Respect the connecon indicaons of the
phase, and earth wires.
• The power supply line must have a
relevant protecon mounted upstream
against short circuits and dispersions to
earth, which isolates the system with
respect to other ulies.
• The voltage must be within a tolerance
of ±10% of the nominal power supply
voltage of the machine (for unbalanced
three-phase unit max 3% between the
phases). Whenever these parameters are
not respected, contact the electric energy
public body. For electric connecons,
use the cables with double isolaon
according to the Standards in force on this
subject in the dierent countries.
• The use of an omnipolar magnet
circuit breaker switch is mandatory, in
compliance with the IEC-EN Standards
(contact opening at least 3 mm), with
suitable cut-o power and dierenal
protecon on the basis of the electric data
table shown below, installed as near as
possible to the appliance.
• It is mandatory to make an eecve earth
connecon. The manufacturer cannot be
considered responsible for any damage
caused by the lack of or ineecve
appliance earth connecon.
• For units with three-phase power supply,
check the correct connecon of the
phases.
RECOMMENDED ELECTRIC CABLE SEC
TION
The cable secon shown in the table are
recommended for maximum lengths of 50m.
For longer lengths or dierent cable laying, it is
up to the PLANNER to calculate the appropriate
line switch, the power supply line as well as the
connecon to the earth wire and connecon cables
depending on:
• the length
• the type of cable
• the absorpon of the unit and the physical
locaon, and the ambient temperature.
ATTENTION:
ELECTRIC POWER CONNECTION TO THE
ELECTRICAL MAINS
1. Before
connecng the unit to the power
supply
mains
, ensure that the isolang
switch is
open.
2. Open
the front panel
3. Use
the holes at the top on the
framework for the main electric power
supply cable and for the cables of the
other external connecons under the
responsibility of the installer.
4. It is
forbidden to access with electric
cables in posions not specically
envisioned in this manual.
5. Avoid
direct contact with not insulated
copper piping
and
with compressor.
6. Idenfy
the clamps for the electric
connecon, always refer to the electric
layout supplied with the unit.
7. For
the
funconal
connecon of the
unit bring a power supply cable
to
the
electric control board inside the unit
and connect
to
the U-N and PE clamps
respecng (U) phase, (N) neutral,
(PE)
earth
in
case of single-phase power
supply
(230V~50Hz),
8. U-V-W
like phases, N like neutral and PE
like
earth in case of three-phase power
supply (400V-
3N~50Hz).
9. Re-posion
the inspecon panels
10. Ensure
that all protecons removed
for the electric connecon have been
restored before electrically powering
the unit.
11. Posion
the main system switch
(external
to the appliance) at “ON”.
All the electrical operaons must be carried out bySTAFF IN POSSESSION OF THE
NECESSARY QUALIFICATIONS BY LAW, suitably trained and informed on the risks related
to these operaons.
The characteriscs of the electrical lines and of the related components must be
determined by STAFF QUALIFIED TO DESIGN ELECTRICAL SYSTEMS, in compliance with
the internaonal and naonal regulaons of the place of installaon of the unit and in
compliance with the regulaons in force at the moment of installaon.
For the installaon requirements refer only to the electrical diagram supplied with the
appliance. The electrical diagram along with the manuals must be kept in good condion
and ALWAYS AVAILABLE FOR ANY FUTURE SERVICING ON THE UNIT.
IT ISmandatory to verify that the machine is waterght before making the electrical
connecons and it must only be powered up aer the hydraulic and electrical works have
been completed.