PE1107mZ/PE1216mG Energy PDU Quick Start Guide www.aten.com
Hardware Review A
1. Power Cord
2. Over Load Protector
3. Total Current Meter
4. Connection Interface
5. Power Outlet
Hardware Setup B
For safety reasons the Energy PDU should not be installed with the power
sockets facing directly up or down, and thus should only be installed with
the power sockets facing out from a vertical position.
Mounting
PDU is compatible with standard cabinet (482.6 mm (19”) ) or non-standard
cabinet
1. PDU can be mounted on the frame in a horizontal way or on both sides of
the cabinet in a vertical direction.
2. PDU can be mounted on the front or rear side of the frame in a horizontal
way.
Installation
1. For each device you want to connect, use its power cable to connect
from the device's AC socket to any available outlet on the PE1107mZ/
PE1216mG
2. (Optional) If using an EC1000 Energy Box, plug the cable that connects
the PE1107mZ/PE1216mG to the Energy Box into the PE1107mZ/
PE1216mG's RJ-45 port(s).
3. Connect the PE1107mZ/PE1216mG “s power cord to an AC power
source.
Note: We strongly advise that you do not plug the PE1107mZ/PE1216mG
into a multi socket extension cord, since it may not receive enough
amperage to operate correctly.
4. Once you have fi nished these installation steps, you can turn on the
Energy PDU and the connected devices.
Specifi cations
Model PE1107mZ PE1216mG
Electrical
Nominal Input
Voltage 250 VAC 250 VAC
Maximum Input
Current 10A Max 16A Max
Input Frequency 50-60 Hz 50-60 Hz
Input Connection 1 x GB1002 10A Plug 1 x IEC C20
Input Power 2500 VA(Max) 4000 VA(Max)
Outlet Type 7 x GB2099.3 10A
Receptacle 16 x IEC C13
Nominal Output
Voltage 250 VAC 250 VAC
Maximum Output
Current (Outlet) 10A (Max) 10A (Max)
Maximum Output
Current (Bank) 10A (Max) 16A(Max)
Maximum Output
Current (Total) 10A (Max) 16A(Max)
Breakers 1 x 10A Non-Fuse breaker 1 x 16A Non-Fuse breaker
Metering PDU level Current PDU level Current
Model PE1107mZ PE1216mG
Electrical
Outlet Switching None None
Current Meter Y Y
Current Monitor
(EC1000)
Connector
1 x CT Module RJ-45 port 1 x CT Module RJ-45 port
PDU Metering
Accuracy
Current>10A Accuracy
+/-5%
Current < 10A Accuracy
+/-0.5A
Current>10A Accuracy
+/-5%
Current < 10A Accuracy
+-0/.5A
EC1000 Energy
Box Metering
Accuracy
Current >1A Accuracy +/-
1%
Current <1A Accuracy +/-
0.1A
Current >1A Accuracy +
/-1%
Current <1A Accuracy +/-
0.1A
Power Cord
Length 2 m 2 m
Environmental
Temperature
(Operating /
Storage)
0 – 60˚C 0 – 60˚C
© Copyright 2013 ATEN®International Co., Ltd.
ATEN and the ATEN logo are trademarks of ATEN International Co., Ltd. All rights reserved.
All other trademarks are the property of their respective owners.
This product is RoHS compliant.
Printing Date: 07/2013
Energy PDU
Quick Start Guide
PE1107mZ/PE1216mG
Hardware Review
A
Package Contents
1 Energy PDU
1 Mounting Kit
1 User Instructions
B
3
2
1
Server 1 Server 2 Server 3 Server 4 Server 5 Server 6 Server 7
54321
54321
PE1107mZPE1216mG
All information, documentation, firmware,
software utilities, and specifi cations contained in
this package are subject to change without prior
notifi cation by the manufacturer. Please visit our
website http://www.aten.com/download/?cid=dds
for the most up-to-date versions.
The following contains information that relates
to China:
Hardware Installation