2
S19-465EFW Installation
10/22/2012 Bradley•215-1170 Rev. N; ECN 12-05-003C
IMPORTANT
Read this installation manual completely to ensure proper installation, then file it with the owner or
maintenance department. Compliance and conformity to drain requirements and other local codes and
ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding any
packaging material. If any parts are missing, do not begin installation until you obtain the missing
parts.
Flush the water supply lines before beginning installation and after installation is complete. Test the
unit for leaks and adequate water flow. Main water supply to the eyewash should be “ON” at all times.
Provisions shall be made to prevent unauthorized shutoff.
The ANSI Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley plumbed
emergency fixtures require a minimum of 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be
tepid per ANSI Z358.1.
The inspection and testing results of this equipment should be recorded weekly to verify proper
operation. This equipment should be inspected annually to ensure compliance with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be trained regarding the
placement and proper operation of emergency equipment per ANSI Z358.1.
For questions regarding the operation or installation of this product, visit www.bradleycorp.com or call
800.BRADLEY (800.272.3539).
Product warranties and service parts information may also be found under ”Products” on our web site
at bradleycorp.com.
Installation
THIS
SIDE
UP
Packing List
P.O.Box309, Menomonee Falls,WI 53051
R
TESTTHISUNIT EACHWEEK
Test-operatevalve(s) each week and sign below.
Reportany malfunctions immediately.
Ventil(e)wöchentlich imTestbetrieb prüfen, bestätigt
durchUnterschrift. Jegliche Störung sofort melden.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date Signed
Signed
Signed
DIESESGERÄT1ST WÖCHENTLICH ZU PRÜFEN.
ESSAIHEBDOMADAIRE
Testle fonctionnement des valves chaque semaine et
signeen bas. S'il y à quelque chose qui ne va pas fait
unrapport immédiatement.
P.O.BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL:1-800-BRADLEY FAX:(262-251-5817)
http://www.bradleycorp.com
114-051
Installation
NOTICE! Avoid cleaners containing organic solvents, alcohols, and hydrocarbons.
Rinse with water after cleaning.
Supplies Required:
Teflon tape and/or pipe sealant
½" NPT water supply inlet (30–90 psi)
Sign-mounting hardware
Backflow prevention device as required by UPC, IPC and/or local plumbing codes
Make sure that, when mounted, the unit will measure 33"–45" from the top of the sprayheads to the finished floor per
ANSI Z358.1.
Step 1: Install the drench hose
1. Rough in ½" NPT supply piping (by installer) from the wall where the drench hose is desired.
2. Select desired location in deck for drench hose and drill a 15⁄16" (34mm) diameter hole.
3. Install the mounting collar, O-ring and locknut provided.
Step 2: Connect water supply
Apply pipe sealant (supplied by installer) to all male threaded pipe joints.
1. Connect one end of the drench hose to the ½" NPT water supply.
2. Insert the hose through the mounting collar assembly. Slide the handle over the hose (above the deck).
3. Install the valve body onto the other end of the hose. Thread the handle onto the valve body.
4. Open the water supply lines. Test for leaks and adequate water flow.
5. Mount the safety sign to the wall using the sign-mounting hardware supplied by installer.