
PV-ezRack Solar Terrace II_Planing and Installation Guide_V1.3 Page 2 of 11
11/20 Duerdin St Tel: +61 3 9017 6688
Clayton VIC 3168, Australia Fax: +61 3 9017 6668
www.clenergy.com.au Email: sales@clenergy.com.au
1.Introduction
Clenergy PV-ezRack®SolarTerrace II™is a pre-assembled ground mount
system suitable for large scale commercial and utility scale installations.
This product has been developed to fit universal PV installations. The
innovative and patented SolarTerrace II™T-Rails simplify and improve
the accuracy of the installation. Using high quality engineered
components SolarTerrace II™saves developers and installers time and
money when delivering large scale projects.
Please review this manual thoroughly before installing your SolarTerrace
II™system. This manual provides (1) supporting documentation for
building permit applications relating to PV-ezRack SolarTerrace II
Universal PV Module Mounting system, and (2) planning and installation
instructions for SolarTerrace II.
SolarTerrace II™products, when installed in accordance with this guide,
will be structurally adequate and will meet the local standards. During the
installation and especially when working on the roof inform yourself about
the appropriate safety regulations, and please also pay attention to the
relevant regulations of your local region. Please check that you are using
the current version of the installation manual by contacting Clenergy
The installer is solely responsible for:
Complying with all applicable local or national building codes, including
any that may supersede this manual;
Ensuring that ezRack and other products are appropriate for the particular
installation and the installation environment;
Using only ezRack parts and installer-supplied parts as specified by
ezRack (substitution of parts may void the warranty and invalidate the
letter of certification on page 2);
Ensuring that the ground condition are suitable;
How to recycle: according to the local relative statute.
How to disassemble: reverse installation process.
Ensure that there are no less than two professionals working on the panel
installation.
Ensure the installation of the electrical equipment is performed by a
professional and accredited electrician.
Ensuring safe installation of all electrical aspects of the PV array.