SERVICE INSTRUCTION 01AUGUST2021
TS100 LOAD CALIBRATION INSTRUCTIONS
SB-TS100_Load Calibration.pdf
HYBRIDLIFTS.COM TECHNICAL SERVICE: +1-262-297-5195
11. When the system detects the DOWN switch activated, the display will show “LOWERING.”
• The system will wait for the DOWN switch to be released once the platform is fully lowered.
12. The load calibration “DYNAMIC” phase is now complete.
13. The display will show “REDO LOADED? YES” – for the first time calibration only “YES” can be selected.
• Press the ENTER button to confirm that loaded calibration is needed
14. The display will show “PLATFORM LOADED?”, asking for confirmation that the platform is loaded.
• Press the ENTER button to confirm.
15. The display will show “PLEASE LIFT …”, waiting for the UP switch to be activated to begin raising the platform.
• Activate the UP switch and keep it activated until the platform has reached full height.
16. When the system detects the UP switch activated, the display will show “LIFT LOADED” with the current
height (from 0% to 100%).
17. After a delay, the system will stop the platform lift and take height & pressure measurements; the display will
show “MEASURING #xx.”
• When the measurements have been taken, the platform will resume lifting.
18. The lifting … stopping … measuring … lifting process will continue until the platform reaches full height.
19. When the platform reaches full height (and height 100% is displayed), release the UP switch.
20. The display shows “TOTAL DATA: xx” to indicate the number of measurements taken, then shows “PLEASE
LOWER …”
• Activate the DOWN switch and keep it activated until the platform is fully lowered.
21. When the system detects the DOWN switch activated, the display will show “LOWER LOADED” with the
current height (from 100% to 0%).
22. Again after a delay, the system will stop the platform lower and take height & pressure measurements; the
display will show “MEASURING #xx.”
• When the measurements have been taken, the platform will resume lowering.
23. The lowering … stopping … measuring … lowering process will continue until the platform is fully lowered.
24. When the platform is fully lowered (and height 0% is displayed), release the DOWN switch; the display shows
“TOTAL DATA: xx” to indicate the number of measurements taken.
25. The load calibration “LOADED” phase is now complete.
26. The display will show “REDO EMPTY? YES” – for the first time calibration only “YES” can be selected.
• Press the ENTER button to confirm that empty calibration is needed.
27. The display will show “PLATFORM EMPTY?”, asking for confirmation that the platform is empty.
• Remove all load from the platform then press the ENTER button to confirm.
28. The display will show “PLEASE LIFT …”, waiting for the UP switch to be activated to begin raising the platform.
• Activate the UP switch and keep it activated until the platform has reached full height.
• When the system detects the UP switch activated, the display will show “LIFT EMPTY” with the current
height (from 0% to 100%).
• Similar to the “LIFT LOADED” phase the lifting … stopping … measuring … lifting process will continue
until the platform reaches full height, then the UP switch can be released.
• The display shows “TOTAL DATA: xx” to indicate the number of measurements taken.
29. The display will show “PLEASE LOWER …”
• Close the DOWN switch and keep it activated until the platform is fully lowered.
• Similar to the “LOWER LOADED” phase the lowering … stopping … measuring … lowering process will
continue until the platform is fully lowered, then the DOWN switch can be released.
• The display shows “TOTAL DATA: xx” to indicate the number of measurements taken.