
Installation and Operating Instructions / 安装使用说明
The right is reserved to change specifications without prior notification or public announcement. 2 of 3
9 821 0404 UWR200
Important Information / 重要信息
1. The installation and maintenance of the product can only use the original parts, and the installation and operation of the equipment
shall be subject to national and international regulations.
本产品安装和维护工作只能使用原厂配件,设备的安装和操作适用于国家和国际法规。
2. DMK is not liable for any damages resulting from improper or unskilled conduct.
DMK 不承担任何因不当或不熟练行为而造成的损害赔偿责任。
3. Only qualied installation personnel are allowed to assemble and install products obtained from the DMK.
只允许有安装资质的人员组装和安装从 DMK 获得的产品。
4. The contents of this manual are subject to change without prior notice. Please refer to the material in kind.
本说明书的内容如有变更,恕不另行通知。请以实物为准。
5. If in doubt, please contact the supplier.
如有疑问,请与供应商联系。
Recommended Installation Procedure / 推荐安装过程
Toolings / 工具
十字螺丝刀
1-1. Put the wave tube through the nut and the
rubber plug.
# The wave tube should reach the bottom of
the rubber plug #
2-1. Fasten the nut with the screw by using
a tool.
3-1. Put the cable through the wave
tube and the hole of the mounting
sleeve from outside.
将波管接通螺母和橡胶塞。波管应顶到橡胶塞底部。
用工具将螺母拧紧。 用扳手将防水接头扭紧在波管上。