MEMSHIELD 4 INSTALLATION INSTRUCTIONS FOR
INCOMING AND OUTGOING METERING - 400A to 800A
Instruction leaflet LT1224 (01/19)
IMPORTANT NOTES
1. This product should be installed, commissioned and maintained by or under the supervision of a competent electrician in
accordance with current electrical engineering Codes of Practice, Requirements for the Electrical Installations (IET Wiring
Regulations BS7671), Construction (Design and Management) Regulations, HSG150 - Health and Safety in Construction, Statutory
requirements and any Specific instruction issued by the Company.
2. After completing the installation and testing of this product it is essential that this leaflet is drawn to the attention of the
person responsible for its future operation and maintenance, and is at all times available for ready reference.
3. These notes assume throughout that the product is disconnected from the supply. It is essential that this is done before any
work is carried out.
4. These Panelboards are only designed for use with Eaton MCCBs. Failure to comply will result in invalid warranty and
certification.
POWER SUPPLY TAP OFF FITTING EM4PBVT
Fit the DIN rail before mounting the fuse block.
For Incoming Meter Pack always fit the fuse block on the LH side,
otherwise the fuse block can be fitted on either side of the pan.
Feed the cables through the grommet and position to suit the
breakout in the top busbar removable shield. Replace the shield
and ensure the grommet is captured in the breakout.
INCOMING METER BOX ASSEMBLY - EM4PB250EXM AND METER
Incoming Meter Box can be fitted top or bottom.
CT in Pulse/Modbus
Power
In
Power
Out
Voltage
O/P
Voltage
I/P
N/L3
L2
L1 NL1 L2 L3
METER
Cable tidy Trunking
EM4PB250EXM
RJ45 CT
Connection
L3
L2
L1
L1
L2
L3
N
L1
L2
L3
L2
L1
N
L3
METER SETTINGS
Basic Meter Setup:- For detailed meter settings see Meter Operating Instructions.
Press: ”E “ for 3 seconds to toggle from Auto to Manual mode. (Stops screen scrolling).
IMPORTANT- Do NOT perform ‘Left Hand CT Mounting Phase Correction’ in Meter Operating Instructions.
The meter phases L1, L2 & L3 are setup for the CT to be mounted on both the RH and LH side of the board.
L1 L2 L3
Removable shield
breakout
Meter/CT Ratio Setup - The meter default CT setting is 160A. To
change the meter CT setting follow instructions below.
1. Press + keys together for 3 seconds to enter configuration menu.
2. To enter default password 1000 - Press then press . Press 4
times to move on and to enter CT primary page 04.
3. Press to select the digit to change and press or to raise or
lower the CT value. Set to 250, 400, or 800 to match CT.
4. Press to save settings and move on.
5. Press + keys together for 3 seconds to exit configuration menu.
METER TYPES
EPBMETER1 –Modbus/Pulse.
EMC3PP2P1 –Multi function MID with
Modbus/Pulse.
Note:
1. Ensure wire seal is fitted to MID Meter.
2. MID Meter will time out and lock, when
setting CT ratio, if meter setup instruction
are not followed.
Fuse block
800A INCOMER METER KIT FITTING - Refer to main installation leaflet LTXXXX for additional fitting details (EM4PBK804 and EM4PBK804L)
TOP ENTRY FITTING EM4PBK804M
CT needs to be moved from delivered position (shown shaded)
to position shown below.
NL1 L2 L3
NL1 L2 L3
800A LUGS INCOMER
FITTING EM4PBK804LM
TOP ENTRY FITTING EM4PBK404M
CT needs to be moved from delivered position (shown shaded)
to position shown below.
400A INCOMER METER KIT FITTING - Refer to main installation leaflet LTXXXX for additional fitting details (EM4PBK404 and EM4PBK404L)
NL1 L2 L3
NL1 L2 L3
400A LUGS INCOMER
FITTING EM4PBK404LM 400A MCCB INCOMER FITTING EM4PBK404M
NL1 L2 L3
NL1 L2 L3
EM4PB250EX
To Meter
To Meter 800A MCCB INCOMER FITTING EM4PBK804M
EM4PB250EX
31Nm
31Nm
31Nm
31Nm
31Nm
31Nm
31Nm
46Nm
46Nm
31Nm
46Nm
31Nm
OUTGOING METER ASSEMBLY - CT KIT FITTING
EPBCTMT160, EPBCTMT250 AND EPBCTMT400
OUTGOING METER CABLEWAYS
EM4PB68SXM, EPBN21240SXM,
EM4PB1214SXM, EM4PB1618SXM
CORNER FILLER - EM4PB300CX
POWER CABLE SETUP
Connect the power supply to the
Voltage I/P terminal of the first
outgoing meter. Loop the power
cable provided from the Voltage O/P
terminal to the Voltage I/P terminal
of the next meter.
Use extension EPBN3LKKTM to
connect the power from the LH side
meters to the meters on the RH side
cableway.
If required, 2 supplies can be fitted
to separately feed the LH and RH side
cableways.
Cable tie and Pad - across hinge.
Coil excess cable in trunking.
0.5m meter to meter
power lead
2.0m meter to CT
RJ45 CT lead
Cable tidy trunking.
Peel off the double sided
tape and fix where required
SINGLE POLE CT SPLITTER BOX EPBCTMT3P
The splitter box allows the separate phase monitoring
of a three phase CT on individual meters.
The CT can be fitted in the panelboard or cableway
for both group or compartmentailsed except in the
following instances:
- NZM3 CT must be fitted in the Cableway for
compartmentailsed form4 type6.
- Single pole CT must be fitted in the Cableway for
compartmentalised form4 type2 & 6
Ensure that P1 side of the CT is facing the MCCB.
Connect the RJ45 cable from the CT to the Meter.
Cable tie across hinge. Coil excess cable in trunking.
CT EXTENSION CABLE FITTING EPBN3LKRJ45
Use the RJ45 CT extension cable when fitting
a CT on the opposite side to the Cableway
/meter.
METERING ID LABELS
CT ID Label
Cable ID Label
Meter ID
Label
POWER EXTENSION CABLE EPBN3LKKTM
Power supply to the RH side Meter Cableway.
Route either across the bottom of the board
or up through the trunking and across the top
of the board.
Voltage O/P
Voltage I/P
Box fixing, ensure scratch washers
are fitted both sides
CABLEWAY EARTH
Provision to move
earth bar into
cableway, utilising
earth strap
P2
L3 L2 L1 RJ45 CT Connection
31Nm
15Nm
Warning -
Intellectual Property Rights
Eaton wishes to make it clear that it owns intellectual property rights in the
product which it manufactures (whether or not listed in this leaflet) and that it
will take legal action against any party found to be manufacturing, using, or
selling any article which infringes the company’s intellectual property. All
marks in this document identified with an R symbol or a TM symbol adjacent
to the mark are trademarks of Eaton.
© 2019 Eaton Electric Limited.
All rights reserved. www.eaton.com/recycling
The use to which this product is put and its place of installation is outside our
control. Particular care should therefore be taken to follow the instructions
given here and to ensure their continued availability in conjunction with the
use of the product.
No responsibility can be accepted by us if these instructions are disregarded.
Further copies of these instructions and information concerning the
installation and proper use of this product can be obtained by contacting the:
Technical Services Department
Eaton Electric Limited, Middleton, Manchester, M24 1GQ.
Tel: +44(0)8700 545 333,
email: techsup[email protected]
Connect the power supply to the
Voltage I/P terminal of the incomer
meter. Use extension EPBN3LKKTM to
connect from the Voltage O/P terminal
of the incomer meter to the Voltage I/P
terminal of the first outgoing meter.
Use the 0.5m power cable to connect
the power to the subsequent meters.
2.0m POWER CABLE EXTENSION
FITTING - EPBN3LKKTM
Use the extension cable to connect
power from the LH side meters to the
RH side cableway meters and for fitting
the incoming and outgoing metering
together.
The Top Meter extension box is not
required if the Incoming meter is fitted in
the side cableway.
SINGLE POLE CT OUTSIDE MCCB COMPARTMENTS
CT IN MCCB COMPARTMENT
The CT needs to be moved forward
on the mounting bracket to allow
room to sweep the RJ45 cable
through the exit point in the gland
plate.
General Note: Torque all M5 fixings to 3.8Nm Max.
The CT needs to be moved backward
on the mounting bracket (move the
fixing feet to opposite side) and
mounted the assembly in the
cableway at 45° to allow room for the
sweep of the live cables from the 3
single pole compartments.
Voltage O/P
Voltage I/P
To Incomer CT
First Outgoing CT
Voltage I/P
Incomer Meter
OUTGOING AND INCOMING METERING

Other Eaton Industrial Electrical manuals

Eaton VHI20-PKZ0 Manual

Eaton

Eaton VHI20-PKZ0 Manual

Eaton DILM150-XHI Series Manual

Eaton

Eaton DILM150-XHI Series Manual

Eaton COOPER POWER SERIES User manual

Eaton

Eaton COOPER POWER SERIES User manual

Eaton M22 ADC Series Manual

Eaton

Eaton M22 ADC Series Manual

Eaton Memshield 3 Series Manual

Eaton

Eaton Memshield 3 Series Manual

Eaton RMQ-Titan C22-PV Series Manual

Eaton

Eaton RMQ-Titan C22-PV Series Manual

Eaton Moeller EU5E-SWD-8DX Manual

Eaton

Eaton Moeller EU5E-SWD-8DX Manual

Eaton RAMO Manual

Eaton

Eaton RAMO Manual

Eaton 9372-FB-P Series User manual

Eaton

Eaton 9372-FB-P Series User manual

Eaton COOPER POWER SERIES User manual

Eaton

Eaton COOPER POWER SERIES User manual

Eaton MODAN 6000 Manual

Eaton

Eaton MODAN 6000 Manual

Eaton RMQ-Titan M22-FI Series Manual

Eaton

Eaton RMQ-Titan M22-FI Series Manual

Eaton COOPER POWER SERIES Instruction manual

Eaton

Eaton COOPER POWER SERIES Instruction manual

Eaton EASY-COM-SWD Series Manual

Eaton

Eaton EASY-COM-SWD Series Manual

Eaton DILM12-XMCE Manual

Eaton

Eaton DILM12-XMCE Manual

Eaton COOPER POWER SERIES User manual

Eaton

Eaton COOPER POWER SERIES User manual

Eaton DMM-160/I5 Series Manual

Eaton

Eaton DMM-160/I5 Series Manual

Eaton ZB-XPLH Manual

Eaton

Eaton ZB-XPLH Manual

Eaton EASY256-HCI Manual

Eaton

Eaton EASY256-HCI Manual

Eaton DualGuard-S ESF30 Service manual

Eaton

Eaton DualGuard-S ESF30 Service manual

Eaton Power Defense NZM-XBZ225 Manual

Eaton

Eaton Power Defense NZM-XBZ225 Manual

Eaton P1/I2 Series Manual

Eaton

Eaton P1/I2 Series Manual

Eaton NZM3-XR Series Manual

Eaton

Eaton NZM3-XR Series Manual

Eaton MTL SUM5 User manual

Eaton

Eaton MTL SUM5 User manual

Popular Industrial Electrical manuals by other brands

Elektro-Automatik ELR 9000 HP operating manual

Elektro-Automatik

Elektro-Automatik ELR 9000 HP operating manual

Smartrise M1000-PM Startup manual

Smartrise

Smartrise M1000-PM Startup manual

Murata GRM1555C1E161JA01 Series Reference sheet

Murata

Murata GRM1555C1E161JA01 Series Reference sheet

Murata GRM033R60J104ME19 Series Reference sheet

Murata

Murata GRM033R60J104ME19 Series Reference sheet

Murata GRM32CR72A684KA01 Series Reference sheet

Murata

Murata GRM32CR72A684KA01 Series Reference sheet

Murata GQM22M5C2H9R1BB01 Series Reference sheet

Murata

Murata GQM22M5C2H9R1BB01 Series Reference sheet

Murata GRM1555C1H3R9WA01 Series Reference sheet

Murata

Murata GRM1555C1H3R9WA01 Series Reference sheet

Festo EAMM-U-***-D***-***P-S1 series Assembly instructions

Festo

Festo EAMM-U-***-D***-***P-S1 series Assembly instructions

Murata GRM185R61E105KA12 Series Reference sheet

Murata

Murata GRM185R61E105KA12 Series Reference sheet

Superior SD23 Operator's manual

Superior

Superior SD23 Operator's manual

Murata GRM1885C2A4R0CA01 Series Reference sheet

Murata

Murata GRM1885C2A4R0CA01 Series Reference sheet

Murata GRT21BR60J335KE13 Series Reference sheet

Murata

Murata GRT21BR60J335KE13 Series Reference sheet

Murata GCM1885C1H201JA16 Series Reference sheet

Murata

Murata GCM1885C1H201JA16 Series Reference sheet

Murata GJM1555C1H130JB01 Series Reference sheet

Murata

Murata GJM1555C1H130JB01 Series Reference sheet

Murata GRM0335C1H510GA01 Series Reference sheet

Murata

Murata GRM0335C1H510GA01 Series Reference sheet

PASCOR ATLANTIC TTR6 manual

PASCOR ATLANTIC

PASCOR ATLANTIC TTR6 manual

Siemens IE FC M12 Plug PRO 4x2 Compact operating instructions

Siemens

Siemens IE FC M12 Plug PRO 4x2 Compact operating instructions

BEKA BA505C manual

BEKA

BEKA BA505C manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.