6 7
EFG Rise - Frame assembly - Step 4 & 5 EFG Rise - Frame assembly - Step 6, 7, 8 & 9
Step 4 = Assemble U-proles Dinside the beams Aand B.
Step 4 = Place b ottom of the prole (pattern) towards the top of frame.
Step 4 = Adjust the length of frame and lock it with screws Hand tool J.
Step 5 = Mount end caps Ion side supports gable holes (E).
Pattern
Step 6 = Place frame on table top and assemble it with screw Kin
Step 6 = holes on beams Aand B, plus side supports E. Use guide .
. sleeves Pfor easier mounting.
Step 7 = Mount handset with screws Nand control box with
Step 7 = screws M.
Step 8 = Use cable clips Oand screws Lto mount the cable of the
Step 8 = handset and the remaining cables of the frame. Add wire
Step 8 = clips Q to collect cables and make it neat.
Step 9 = Observe and nish!
Step 9 = Go through the initialization procedure (page 3).
OBSERVE:
Make sure every screw is tightened before use.
Turn the table around to standing position and plug the cable.
Ready to use!