1592017400 XLH260 GB r1.0 15.04.2005.doc XLH260 8/15
FnC Fan op rating mod : C-n = running when a load is on, OFF during the defrost; C-y = running when a load is on, ON during the defrost; O-n
= continuous mode, OFF during the defrost; O-y = continuous mode, ON during the defrost;
TEMPERATURE ALARMS
ALC T mp ratur alarm configuration: rE = High and Low alarms related to Set oint; Ab = High and low alarms related to the absolute
temperature.
ALL Low t mp ratur alarm s tting: ALC = rE , 0 ÷
÷÷
÷ 50 °C or 90°F
ALC = Ab , - 50°C or -58°F ÷
÷÷
÷ ALU
when this temperature is reached and after the ALd delay time, the LA alarm is enabled,.
ALU High t mp ratur alarm s tting: ALC= rE, 0 ÷
÷÷
÷ 50°C or 90°F
ALC= Ab, ALL ÷ 110°C or 230°F
when this temperature is reached and after the ALd delay time the HA alarm is enabled.
ALH T mp ratur alarm r cov ry diff r ntial: (0,1÷25,5°C; 1÷45°F) Intervention differential for recovery of temperature alarm.
ALd T mp ratur alarm d lay: (0÷255 min) time interval between the detection of an alarm condition and the corresponding alarm signalling.
dAO D lay of t mp ratur alarm at start-up: (0min÷23h 50min) time interval between the detection of the temperature alarm condition after the
instrument power on and the alarm signalling.
EdA Alarm d lay at th nd of d frost: (0÷255 min) Time interval between the detection of the temperature alarm condition at the end of defrost
and the alarm signalling.
dot D lay of t mp ratur alarm aft r closing th door : (0÷255 min) Time delay to signal the temperature alarm condition after closing the
door.
HUMIDITY ALARMS
AHC Humidity alarm configuration: rE = High and Low alarms related to humidity Set oint; Ab = High and low alarms related to the “absolute”
humidity.
AHL Low humidity alarm s tting: (with AHC = rE: 0 ÷ 50. With AHC = Ab: Lci ÷ AHu)
when this humidity is reached and after the AHd delay time, the HLA alarm is enabled,.
AHu High humidity alarm s tting: (with AHC = rE: 0÷50°C. with AHC = Ab: AHL ÷ uci
when this humidity is reached and after the AHd delay time the HHA alarm is enabled.
AHH Humidity alarm r cov ry diff r ntial: (0.5÷20.0) Intervention differential for recovery of humidity alarm.
AHd Humidity alarm d lay: (0÷255 min) time interval between the detection of an alarm condition and the corresponding alarm signalling.
dHo D lay of humidity alarm at start-up: (0min÷23h 50min) time interval between the detection of the humidity alarm condition after the
instrument power on and the alarm signalling.
doH Alarm d lay at th nd of d frost: (0÷255 min) Time interval between the detection of the humidity alarm condition at the end of defrost
and the alarm signalling.
doA Op n door alarm d lay:(0÷255 min) delay between the detection of the open door condition and its alarm signalling: the flashing message
“dA” is displayed.
nPS Pr ssur switch numb r: (0 ÷15) Number of activation of the pressure switch, during the “did” interval, before signalling the alarm event
(I2F= AL). If th nPS activation in th “did” tim is r ach d, switch off and on th instrum nt to r start normal r gulation.
PROBE INPUTS
Ot Th rmostat prob calibration: (-12.0÷
÷÷
÷12.0°C/ -21÷
÷÷
÷21°F) allows to adjust possible offset of the thermostat probe.
OE Evaporator prob calibration: (-12.0÷
÷÷
÷12.0°C/ -21÷
÷÷
÷21°F) allows to adjust possible offsets of the evaporator probe.
O3 Humidity prob calibration: (-10÷
÷÷
÷10 RH) allows to adjust possible offsets of the humidity probe.
P2P Evaporator prob pr s nc : n= not present: the defrost stops only by time; y= present: the defrost stops by temperature and time.
P3P Humidity prob pr s nc : n= not present; y= present.
LCI R adout with 4 mA : (-999 ÷ 999). Adjustment of read out corresponding to 4mA signal.
UCI R adout with 20 mA : (-999 ÷ 999). Adjustment of read out corresponding to 20mA signal.
DIGITAL INPUTS
i1P Configurabl digital input polarity: CL : the digital input is activated by closing the contact; OP : the digital input is activated by opening
the contact;
i2P Door switch digital input polarity: CL : the digital input is activated by closing the contact; OP : the digital input is activated by opening the
contact;
i1F Digital input op rating mod : configure the digital input function: EAL = generic alarm; bAL = serious alarm mode; PAL = ressure
switch; Ht = heating relay safety; dor = door switch
odc Outputs status wh n op n door: on = normal; Fan = Fan OFF; oFF = all the loads off
rrd Outputs r starting aft r doA alarm: no = outputs not affected by the doA alarm; yES = outputs restart with the doA alarm;
did Tim int rval/d lay for digital input alarm:(0÷255 min.) Time interval to calculate the number of the pressure switch activation when
I1F= AL. If I1F=EAL or bAL (external alarms), “did” parameter defines the time delay between the detection and the successive signalling of
alarms.
OTHER
oA1 Light r lay configuration: ALr = alarm; dEH = dehumidifier; onF = on/off relay: close with instrument on, open with instrument off; Lig =
light, ESt, dEF not s l ct