
CLI
PWR1
PWR2 SFP+
SYS
100-240V
PWR
PWR1/PWR2
1 5 9 13 17 21
4 8 12 16 20 24
1
4 N L
IES5100-24FS
L N AC
DC
21 43
SFP+
1817 2019 2221 242321 43 65 87 109 1211 1413 1615 1817 2019 2221 2423
COMBO COMBO
3
EN
Front Panel
Installation Requirements
Before the installation, make sure that you have the following:
Screwdriver, static-proof wristband, bolt, Ethernet cable, other Ethernet terminal devices and
control terminal.
Standard-sized, 19" wide rack with a minimum of 1U height available.
Category 5e or higher RJ45 Ethernet cables and ber optical cable for connecting network devices.
Site Environment
Make sure that the temperature of the installation site is maintained at -40°C~85°C.
The installation site must be well ventilated. Ensure that there is adequate airow around the
switch.
The switch should be installed at least 1U (44.45mm) away from devices to its sides.
Be sure that the switch is level and stable to avoid any hazardous conditions.
Do not install the equipment in a dusty environment.
The installation site must be free from leaking or dripping water, heavy dew, and humidity.
Ensure the rack and working platforms are well earthed.
Power Input
Grounding point
Power Alarm Output
CLI
PWR1
PWR2 SFP+
SYS
1 5 9 13 17 21
4 8 12 16 20 24
1
4
SFP+
21 43 21 43 65 87 10
912
11 14
13 16
15 18
17 20
19 18
17