GE Optima CT680 Series User manual

OPERATING DOCUMENTATION
5472001-1EN
Rev. 6
Optima CT680 Series and Optima CT670
Installation Manual
(Book 1 of 2)

GE COMPANY
DIRECTION 5472001-1EN, REVISION 6OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Page 2
Book 1 of 2: Mechanical Installation
Pages 1 - 206
Effectivity
The information in this manual applies to the following Optima CT Systems:
• Optima CT680 Quantum
• Optima CT680 Expert
• Optima CT680 Professional
• Optima CT670

GE COMPANY
DIRECTION 5472001-1EN, REVISION 6 OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Important Precautions Page 3
IMPORTANT PRECAUTIONS
LANGUAGE
ПРЕДУПРЕЖДЕНИЕ
(BG)
Това упътване за работа еналично само на английски език.
•Ако доставчикът на услугата на клиента изиска друг език,
задължение на клиента еда осигури превод.
•Не използвайте оборудването, преди да сте се консултирали и
разбрали упътването за работа.
•Неспазването на това предупреждение може да доведе до
нараняване на доставчика на услугата, оператора или пациентa в
резултат на токов удар, механична или друга опасност.
警告
(ZH-CN)
本维修手册仅提供英文版本。
• 如果维修服务提供商需要非英文版本,客户需自行提供翻译服务。
• 未详细阅读和完全理解本维修手册之前,不得进行维修。
• 忽略本警告可能对维修人员,操作员或患者造成触电、机械伤害或其他
形式的伤害。
警告
(ZH-HK)
本服務手冊僅提供英文版本。
• 倘若客戶的服務供應商需要英文以外之服務手冊,客戶有責任提供翻譯
服務。
• 除非已參閱本服務手冊及明白其內容,否則切勿嘗試維修設備。
• 不遵從本警告或會令服務供應商、網絡供應商或病人受到觸電、機械性
或其他的危險。
警告
(ZH-TW)
本維修手冊僅有英文版。
• 若客戶的維修廠商需要英文版以外的語言,應由客戶自行提供翻譯服
務。
• 請勿試圖維修本設備,除非 您已查閱並瞭解本維修手冊。
• 若未留意本警告,可能導致維修廠商、操作員或病患因觸電、機械或其
他危險而受傷。
UPOZORENJE
(HR)
Ovaj servisni priručnik dostupan je na engleskom jeziku.
• Ako davatelj usluge klijenta treba neki drugi jezik, klijent je dužan
osigurati prijevod.
• Ne pokušavajte servisirati opremu ako niste u potpunosti pročitali i
razumjeli ovaj servisni priručnik.
• Zanemarite li ovo upozorenje, može doći do ozljede davatelja usluge,
operatera ili pacijenta uslijed strujnog udara, mehaničkih ili drugih rizika.
VÝSTRAHA
(CS)
Tento provozní návod existuje pouze v anglickém jazyce.
•Vpřípadě, že externí služba zákazníkům potřebuje návod v jiném
jazyce, je zajištění překladu do odpovídajícího jazyka úkolem zákazníka.
• Nesnažte se o údržbu tohoto zařízení, aniž byste si přečetli tento
provozní návod a pochopili jeho obsah.
•Vpřípaděnedodržování této výstrahy může dojít k poranění pracovníka
prodejního servisu, obslužného personálu nebo pacientůvlivem
elektrického proudu, respektive vlivem mechanických či jiných rizik.

GE COMPANY
DIRECTION 5472001-1EN, REVISION 6OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Page 4 Important Precautions
ADVARSEL
(DA)
Denne servicemanual findes kun på engelsk.
• Hvis en kundes tekniker har brug for et andet sprog end engelsk, er det
kundens ansvar at sørge for oversættelse.
• Forsøg ikke at servicere udstyret uden at læse og forstå denne
servicemanual.
• Manglende overholdelse af denne advarsel kan medføre skade på
grund af elektrisk stød, mekanisk eller anden fare for teknikeren,
operatøren eller patienten.
WAARSCHUWING
(NL)
Deze onderhoudshandleiding is enkel in het Engels verkrijgbaar.
• Als het onderhoudspersoneel een andere taal vereist, dan is de klant
verantwoordelijk voor de vertaling ervan.
• Probeer de apparatuur niet te onderhouden alvorens deze
onderhoudshandleiding werd geraadpleegd en begrepen is.
• Indien deze waarschuwing niet wordt opgevolgd, zou het
onderhoudspersoneel, de operator of een patiënt gewond kunnen raken
als gevolg van een elektrische schok, mechanische of andere gevaren.
WARNING
(EN)
This service manual is available in English only.
• If a customer's service provider requires a language other than English,
it is the customer's responsibility to provide translation services.
• Do not attempt to service the equipment unless this service manual has
been consulted and is understood.
• Failure to heed this warning may result in injury to the service provider,
operator or patient from electric shock, mechanical or other hazards.
HOIATUS
(ET)
See teenindusjuhend on saadaval ainult inglise keeles.
• Kui klienditeeninduse osutaja nõuab juhendit inglise keelest erinevas keeles,
vastutab klient tõlketeenuse osutamise eest.
• Ärge üritage seadmeid teenindada enne eelnevalt käesoleva teenindusjuhendiga
tutvumist ja sellest aru saamist.
• Käesoleva hoiatuse eiramine võib põhjustada teenuseosutaja, operaatori või
patsiendi vigastamist elektrilöögi, mehaanilise või muu ohu tagajärjel.
VAROITUS
(FI)
Tämä huolto-ohje on saatavilla vain englanniksi.
• Jos asiakkaan huoltohenkilöstö vaatii muuta kuin englanninkielistä materiaalia,
tarvittavan käännöksen hankkiminen on asiakkaan vastuulla.
• Älä yritä korjata laitteistoa ennen kuin olet varmasti lukenut ja ymmärtänyt
tämän huolto-ohjeen.
• Mikäli tätä varoitusta ei noudateta, seurauksena voi olla huoltohenkilöstön,
laitteiston käyttäjän tai potilaan vahingoittuminen sähköiskun, mekaanisen vian
tai muun vaaratilanteen vuoksi.
ATTENTION
(FR)
Ce manuel d’installation et de maintenance est disponible uniquement en
anglais.
• Si le technicien d'un client a besoin de ce manuel dans une langue autre
que l'anglais, il incombe au client de le faire traduire.
• Ne pas tenter d'intervenir sur les équipements tant que ce manuel
d’installation et de maintenance n'a pas été consulté et compris.
• Le non-respect de cet avertissement peut entraîner chez le technicien,
l'opérateur ou le patient des blessures dues à des dangers électriques,
mécaniques ou autres.

GE COMPANY
DIRECTION 5472001-1EN, REVISION 6 OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Important Precautions Page 5
WARNUNG
(DE)
Diese Serviceanleitung existiert nur in englischer Sprache.
• Falls ein fremder Kundendienst eine andere Sprache benötigt, ist es
Aufgabe des Kunden für eine entsprechende Übersetzung zu sorgen.
• Versuchen Sie nicht diese Anlage zu warten, ohne diese
Serviceanleitung gelesen und verstanden zu haben.
• Wird diese Warnung nicht beachtet, so kann es zu Verletzungen des
Kundendiensttechnikers, des Bedieners oder des Patienten durch
Stromschläge, mechanische oder sonstige Gefahren kommen.
ΠΡΟΕΙ∆ΟΠΟΙΗΣΗ
(EL)
Το παρόν εγχειρίδιο σέρβις διατίθεται μόνο στα αγγλικά.
• Εάν οτεχνικός σέρβις ενός πελάτη απαιτεί το παρόν εγχειρίδιο σε
γλώσσα εκτός των αγγλικών, αποτελεί ευθύνη του πελάτη να παρέχει τις
υπηρεσίες μετάφρασης.
• Μην επιχειρήσετε την εκτέλεση εργασιών σέρβις στον εξοπλισμό αν δεν
έχετε συμβουλευτεί και κατανοήσει το παρόν εγχειρίδιο σέρβις.
• Αν δεν προσέξετε την προειδοποίηση αυτή, ενδέχεται να προκληθεί
τραυματισμός στον τεχνικό σέρβις, στο χειριστή ήστον ασθενή από
ηλεκτροπληξία, μηχανικούς ήάλλους κινδύνους.
FIGYELMEZTETÉS
(HU)
Ezen karbantartási kézikönyv kizárólag angol nyelven érhetőel.
•Haavevőszolgáltatója angoltól eltérőnyelvre tart igényt, akkor a vevő
felelőssége a fordítás elkészíttetése.
• Ne próbálja elkezdeni használni a berendezést, amíg a karbantartási
kézikönyvben leírtakat nem értelmezték.
• Ezen figyelmeztetés figyelmen kívül hagyása a szolgáltató, működtető
vagy a beteg áramütés, mechanikai vagy egyéb veszélyhelyzet miatti
sérülését eredményezheti.
AÐVÖRUN
(IS)
Þessi þjónustuhandbók er aðeins fáanleg á ensku.
• Ef að þjónustuveitandi viðskiptamanns þarfnast annas tungumáls en
ensku, er það skylda viðskiptamanns að skaffa tungumálaþjónustu.
• Reynið ekki að afgreiða tækið nema að þessi þjónustuhandbók hefur
verið skoðuð og skilin.
• Brot á sinna þessari aðvörun getur leitt til meiðsla á þjónustuveitanda,
stjórnanda eða sjúklings frá raflosti, vélrænu eða öðrum áhættum.
AVVERTENZA
(IT)
Il presente manuale di manutenzione è disponibile soltanto in lingua inglese.
• Se un addetto alla manutenzione richiede il manuale in una lingua
diversa, il cliente è tenuto a provvedere direttamente alla traduzione.
• Procedere alla manutenzione dell'apparecchiatura solo dopo aver
consultato il presente manuale ed averne compreso il contenuto.
• Il mancato rispetto della presente avvertenza potrebbe causare lesioni
all'addetto alla manutenzione, all'operatore o ai pazienti provocate da
scosse elettriche, urti meccanici o altri rischi.
警告
(JA)
このサービスマニュアルには英語版しかありません。
• サービスを担当される業者が英語以外の言語を要求される場合、翻訳
作業はその業者の責任で行うものとさせていただきます。
• このサービスマニュアルを熟読し理解せずに、装置のサービスを行わ
ないでください。
• この警告に従わない場合、サービスを担当される方、操作員あるいは
患者さんが、感電や機械的又はその他の危険により負傷する可能性が
あります。

GE COMPANY
DIRECTION 5472001-1EN, REVISION 6OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Page 6 Important Precautions
경고
(KO)
본 서비스 매뉴얼은 영어로만 이용하실 수 있습니다 .
• 고객의 서비스 제공자가 영어 이외의 언어를 요구할 경우 , 번역 서비스
를 제공하는 것은 고객의 책임입니다 .
• 본 서비스 매뉴얼을 참조하여 숙지하지 않은 이상 해당 장비를 수리하려
고 시도하지 마십시오 .
• 본 경고 사항에 유의하지 않으면 전기 쇼크 , 기계적 위험 , 또는 기타 위
험으로 인해 서비스 제공자 , 사용자 또는 환자에게 부상을 입힐 수 있습
니다 .
BRĪDINĀJUMS
(LV)
Šīapkopes rokasgrāmata ir pieejama tikai angļu valodā.
• Ja klienta apkopes sniedzējam nepieciešama informācija citāvalodā, klienta
pienākums ir nodrošināt tulkojumu.
• Neveiciet aprīkojuma apkopi bez apkopes rokasgrāmatas izlasīšanas un
saprašanas.
•Šībrīdinājuma neievērošanas rezultātāvar rasties elektriskās strāvas trieciena,
mehānisku vai citu faktoru izraisītu traumu risks apkopes sniedzējam,
operatoram vai pacientam.
ĮSPĖJIMAS
(LT)
Šis eksploatavimo vadovas yra tik anglųkalba.
• Jei kliento paslaugųtiekėjas reikalauja vadovo kita kalba – ne anglų, suteikti
vertimo paslaugas privalo klientas.
•Nemėginkite atlikti įrangos techninės priežiūros, jei neperskaitėte ar
nesupratote šio eksploatavimo vadovo.
• Jei nepaisysite šio įspėjimo, galimi paslaugųtiekėjo, operatoriaus ar paciento
sužalojimai dėl elektros šoko, mechaniniųar kitųpavojų.
ADVARSEL
(NO)
Denne servicehåndboken finnes bare på engelsk.
• Hvis kundens serviceleverandør har bruk for et annet språk, er det
kundens ansvar å sørge for oversettelse.
• Ikke forsøk å reparere utstyret uten at denne servicehåndboken er lest
og forstått.
• Manglende hensyn til denne advarselen kan føre til at
serviceleverandøren, operatøren eller pasienten skades på grunn av
elektrisk støt, mekaniske eller andre farer.
OSTRZEŻENIE
(PL)
Niniejszy podręcznik serwisowy dostępny jest jedynie w języku angielskim.
•Jeśli serwisant klienta wymaga języka innego niżangielski, zapewnienie
usługi tłumaczenia jest obowiązkiem klienta.
• Nie próbowaćserwisowaćurządzenia bez zapoznania sięz niniejszym
podręcznikiem serwisowym i zrozumienia go.
• Niezastosowanie siędo tego ostrzeżenia może doprowadzićdo obrażeń
serwisanta, operatora lub pacjenta w wyniku porażenia prądem
elektrycznym, zagrożenia mechanicznego bądźinnego.
ATENÇÃO
(PT-BR)
Este manual de assistência técnica encontra-se disponível unicamente em
inglês.
• Se outro serviço de assistência técnica solicitar a tradução deste
manual, caberá ao cliente fornecer os serviços de tradução.
• Não tente reparar o equipamento sem ter consultado e compreendido
este manual de assistência técnica.
• A não observância deste aviso pode ocasionar ferimentos no técnico,
operador ou paciente decorrentes de choques elétricos, mecânicos ou
outros.

GE COMPANY
DIRECTION 5472001-1EN, REVISION 6 OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Important Precautions Page 7
ATENÇÃO
(PT-PT)
Este manual de assistência técnica só se encontra disponível em inglês.
• Se qualquer outro serviço de assistência técnica solicitar este manual
noutro idioma, é da responsabilidade do cliente fornecer os serviços de
tradução.
• Não tente reparar o equipamento sem ter consultado e compreendido
este manual de assistência técnica.
• O não cumprimento deste aviso pode colocar em perigo a segurança do
técnico, do operador ou do paciente devido a choques eléctricos,
mecânicos ou outros.
ATENŢIE
(RO)
Acest manual de service este disponibil doar în limba engleză.
•Dacăun furnizor de servicii pentru clienţi necesităo altălimbădecât cea
engleză, este de datoria clientului săfurnizeze o traducere.
• Nu încercaţi săreparaţi echipamentul decât ulterior consultării şi
înţelegerii acestui manual de service.
• Ignorarea acestui avertisment ar putea duce la rănirea depanatorului,
operatorului sau pacientului în urma pericolelor de electrocutare,
mecanice sau de altănatură.
ОСТОРОЖНО!
(RU)
Данное руководство по техническому обслуживанию представлено
только на английском языке.
• Если сервисному персоналу клиента необходимо руководство не на
английском, ана каком-то другом языке, клиенту следует
самостоятельно обеспечить перевод.
• Перед техническим обслуживанием оборудования обязательно
обратитесь кданному руководству ипоймите изложенные внем
сведения.
• Несоблюдение требований данного предупреждения может
привести ктому, что специалист по техобслуживанию, оператор или
пациент получит удар электрическим током, механическую травму
или другое повреждение.
UPOZORENJE
(SR)
Ovo servisno uputstvo je dostupno samo na engleskom jeziku.
• Ako klijentov serviser zahteva neki drugi jezik, klijent je dužan da
obezbedi prevodilačke usluge.
• Ne pokušavajte da opravite uređaj ako niste pročitali i razumeli ovo
servisno uputstvo.
• Ne pokušavajte da opravite uređaj ako niste pročitali i razumeli ovo
servisno uputstvo.
UPOZORNENIE
(SK)
Tento návod na obsluhu je k dispozícii len v angličtine.
• Ak zákazníkov poskytovateľslužieb vyžaduje iný jazyk ako angličtinu,
poskytnutie prekladateľských služieb je zodpovednosťou zákazníka.
• Nepokúšajte sa o obsluhu zariadenia, kým si neprečítate návod na
obluhu a neporozumiete mu.
• Zanedbanie tohto upozornenia môže spôsobiťzranenie poskytovateľa
služieb, obsluhujúcej osoby alebo pacienta elektrickým prúdom,
mechanické alebo iné ohrozenie.

GE COMPANY
DIRECTION 5472001-1EN, REVISION 6OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Page 8 Important Precautions
ATENCION
(ES)
Este manual de servicio sólo existe en inglés.
• Si el encargado de mantenimiento de un cliente necesita un idioma que
no sea el inglés, el cliente deberá encargarse de la traducción del
manual.
• No se deberá dar servicio técnico al equipo, sin haber consultado y
comprendido este manual de servicio.
• La no observancia del presente aviso puede dar lugar a que el
proveedor de servicios, el operador o el paciente sufran lesiones
provocadas por causas eléctricas, mecánicas o de otra naturaleza.
VARNING
(SV)
Den här servicehandboken finns bara tillgänglig på engelska.
• Om en kunds servicetekniker har behov av ett annat språk än engelska,
ansvarar kunden för att tillhandahålla översättningstjänster.
• Försök inte utföra service på utrustningen om du inte har läst och förstår
den här servicehandboken.
• Om du inte tar hänsyn till den här varningen kan det resultera i skador på
serviceteknikern, operatören eller patienten till följd av elektriska stötar,
mekaniska faror eller andra faror.
OPOZORILO
(SL)
Ta servisni priročnik je na voljo samo v angleškem jeziku.
• Če ponudnik storitve stranke potrebuje priročnik v drugem jeziku, mora
stranka zagotoviti prevod.
• Ne poskušajte servisirati opreme, če tega priročnika niste v celoti
prebrali in razumeli.
• Če tega opozorila ne upoštevate, se lahko zaradi električnega udara,
mehanskih ali drugih nevarnosti poškoduje ponudnik storitev, operater
ali bolnik.
DİKKAT
(TR)
Bu servis kılavuzunun sadece ingilizcesi mevcuttur.
•Eğer müşteri teknisyeni bu kılavuzu ingilizce dışında bir başka lisandan
talep ederse, bunu tercüme ettirmek müşteriye düşer.
• Servis kılavuzunu okuyup anlamadan ekipmanlara müdahale etmeyiniz.
• Bu uyarıya uyulmaması, elektrik, mekanik veya diğer tehlikelerden
dolayıteknisyen, operatör veya hastanın yaralanmasına yol açabilir.

GE COMPANY
DIRECTION 5472001-1EN, REVISION 6 OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Important Precautions Page 9
DAMAGE IN TRANSPORTATION
All packages should be closely examined at time of delivery. If damage is apparent, have notation
“Damage in Shipment” written on all copies of the freight or express bill before delivery is accepted
or “signed for” by a General Electric representative or a hospital receiving agent. Whether noted or
concealed, damage MUST be reported to the carrier immediately upon discovery, or in any event,
within 14 days after receipt, and the contents and containers held for inspection by the carrier. A
transportation company will not pay a claim for damage if an inspection is not requested within this
14-day period.
To file a report:
• Call 1-800-548-3366 and use option 8.
• Fill out a report on http://egems.med.ge.com/edq/home.jsp
• Contact your local service coordinator for more information on this process.
Rev. June 13, 2006
CERTIFIED ELECTRICAL CONTRACTOR STATEMENT
All electrical Installations that are preliminary to positioning of the equipment at the site prepared
for the equipment shall be performed by licensed electrical contractors. In addition, electrical feeds
into the Power Distribution Unit shall be performed by licensed electrical contractors. Other
connections between pieces of electrical equipment, calibrations and testing shall be performed by
qualified GE Medical personnel. The products involved (and the accompanying electrical
installations) are highly sophisticated, and special engineering competence is required. In
performing all electrical work on these products, GE will use its own specially trained field
engineers. All of GE’s electrical work on these products will comply with the requirements of the
applicable electrical codes.
The purchaser of GE equipment shall only utilize qualified personnel (i.e., GE’s field engineers,
personnel of third-party service companies with equivalent training, or licensed electricians) to
perform electrical servicing on the equipment.
IMPORTANT...X-RAY PROTECTION
X-ray equipment, if not properly used, may cause injury. Accordingly, the instructions herein
contained should be thoroughly read and understood by everyone who will use the equipment
before you attempt to place this equipment in operation. The General Electric Company, GE
Healthcare Group, will be glad to assist and cooperate in placing this equipment in use.
Although this apparatus incorporates a high degree of protection against x-radiation other than the
useful beam, no practical design of equipment can provide complete protection. Nor can any
practical design compel the operator to take adequate precautions to prevent the possibility of any
persons carelessly exposing themselves or others to radiation.
It is important that anyone having anything to do with x-radiation be properly trained and fully
acquainted with the recommendations of the National Council on Radiation Protection and
Measurements as published in NCRP Reports available from NCRP Publications, 7910 Woodmont
Avenue, Room 1016, Bethesda, Maryland 20814, and of the International Commission on
Radiation Protection, and take adequate steps to protect against injury.
The equipment is sold with the understanding that the General Electric Company, GE Healthcare
Group, its agents, and representatives have no responsibility for injury or damage which may result
from improper use of the equipment.
Various protective materials and devices are available. It is urged that such materials or devices be
used.

GE COMPANY
DIRECTION 5472001-1EN, REVISION 6OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Page 10 Important Precautions
IMPORTANT...RADIOACTIVE MATERIAL HANDLING
Only employees formally trained in radioactive materials handling and this equipment are
authorized by the GE Healthcare Radiation Safety Officer to use radioactive materials to service
this equipment.
GE Healthcare is required to notify the applicable U.S. state agency PRIOR to any source service
event involving pin source handling. See NUC/PET radioactive material guides for specific
instruction or contact your EHS Specialist.
A radiation survey must be performed when a pin source has been removed and replaced. See
Radiation Survey Form Instructions or contact your EHS Specialist.
Rev 2 (July 21, 2005)
LITHIUM BATTERY CAUTIONARY STATEMENTS
CAUTION Risk of Explosion.
Danger of explosion if battery is incorrectly replaced.
Replace only with the same or equivalent type recommended by the manufacturer. Discard
used batteries according to the manufacturer’s instructions.
ATTENTION Danger d’Explosion
Il y a danger d’explosion s’il y a replacement incorrect de la batterie.
Remplacer uniquement avec une batterie du même type ou d’un type recommandé par le
constructeur. Mettre au rébut les batteries usagées conformément aux instructions du
fabricant.
OMISSIONS & ERRORS
Customers, please contact your GE Sales or Service representatives. GE personnel, please use
the GE Healthcare PQR Process to report all omissions, errors, and defects in this publication.

GE COMPANY
DIRECTION 5472001-1EN, REVISION 6OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Revision History Page 11
Revision History
Rev Date Reason for change
6 Sep 04, 2017 Add the Optima CT670 product name
5May 05, 2017 Chapter 2, Section 3.3.2: Added HP LCD connection
information
Chapter 2, Section 3.4: Added Figure 2-12 for z840 rear panel
connection
Chapter 8, Section 3.0: Added Figure 8-8 for z840 rear panel
connection
4 May 20, 2016 Chapter 2, Section 3.1: Added keyboard overlay installation
information
Update Figure 2-5 and Table 2-5 for GSCB connection
Section 3.2: Added PMT-22 information
3Sep 06, 2015 Chapter 1, Section 5.4: Updated Figure 1-5
Chapter 1, Section 11: Added information of 5487992-2 Anchor
2 April 09, 2014 Chapter 2: Updated Table 2-3 system interconnect cables
information
Chapter 4: Updated Figure 4-5 Gantry Base Cover Installed
Chapter 8: Added Section 4.0 and Section 5.0 option installation
1Dec 20, 2013 Initial release for KL64 Saturn MV

GE COMPANY
DIRECTION 5472001-1EN, REVISION 6OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Page 12 Revision History

GE COMPANY
DIRECTION 5472001-1EN, REVISION 6OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Table of Contents Page 13
Table of Contents: Book 1
Book 1 TOC
Preface
Publication Conventions ...................................................................................... 21
Section 1.0
Safety & Hazard Information ........................................................................... 21
1.1 Text and Character Representation................................................................................. 21
1.2 Graphical Representation................................................................................................ 22
Section 2.0
Publication Conventions ................................................................................. 23
2.1 General Paragraph and Character Styles........................................................................ 23
2.2 Page Layout..................................................................................................................... 23
2.3 Computer Screen Output/Input Character Styles ............................................................ 24
2.4 Buttons, Switches and Keyboard Inputs (Hard & Soft Keys) ........................................... 24
Chapter 1
Position Subsystems ............................................................................................ 25
Section 1.0 Installer/FE Notices...................................................................... 25
1.1 General Safety Guidelines............................................................................................... 25
1.2 Shipping, Warehouse and Transportation Warning......................................................... 25
1.3 International Shipments................................................................................................... 25
1.4 On Site Warning .............................................................................................................. 25
1.5 Service Actions ................................................................................................................ 25
Section 2.0
Introduction ...................................................................................................... 26
2.1 Overview.......................................................................................................................... 26
2.2 Pre-Installation Template................................................................................................. 26
2.3 Required Common Tools and Supplies ........................................................................... 27
Section 3.0 Delivery Procedure....................................................................... 30
3.1 System Transportation - Temperature Extremes............................................................. 30
3.2 Stored Systems ............................................................................................................... 30
3.3 Construction Site Storage................................................................................................ 30
3.4 Construction Site Installations ......................................................................................... 30
3.4.1 Construction Site with Completed Radiology Area ............................................. 31
3.4.2 Full Construction Site with Limited Delivery Access ........................................... 31
3.4.3 Construction Site Unpacking .............................................................................. 31
3.5 Working with the Mover ................................................................................................... 32
3.5.1 Delivery Dolly Options: ....................................................................................... 32
3.5.2 Equipment Delivery Route .................................................................................. 32
3.5.3 Floor Protection .................................................................................................. 32
3.5.4 Removing Gantry Dollies and Covers................................................................. 32
3.6 Damage In Transportation ............................................................................................... 32
3.7 A1 Breaker....................................................................................................................... 33
3.7.1 Installation Conditions......................................................................................... 33
Section 4.0 Layout the Floor Template .......................................................... 34

GE COMPANY
DIRECTION 5472001-1EN, REVISION 6OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Page 14 Table of Contents
4.1 Time & Personnel............................................................................................................ 34
4.2 Tools and Test Equipment .............................................................................................. 34
4.3 Safety .............................................................................................................................. 34
4.4 Floor Preparation ............................................................................................................ 34
4.4.1 Preparation......................................................................................................... 34
4.4.2 Flooring .............................................................................................................. 34
4.5 Room Preparation ........................................................................................................... 35
4.6 Procedure........................................................................................................................ 35
Section 5.0 Install the Gantry .......................................................................... 39
5.1 Time and Personnel ........................................................................................................ 39
5.2 Tools and Test Equipment .............................................................................................. 39
5.3 Gantry Preparation.......................................................................................................... 39
5.3.1 Access Greater than 28 in.................................................................................. 39
5.3.2 Access Less than 28 in. ..................................................................................... 39
5.4 Procedure........................................................................................................................ 40
Section 6.0 Level the Gantry............................................................................ 43
6.1 Time and Personnel ........................................................................................................ 43
6.2 Tools and Test Equipment .............................................................................................. 43
6.3 Procedure........................................................................................................................ 43
Section 7.0 Gantry Bearing Gap Inspection.................................................. 46
7.1 Time and Personnel ........................................................................................................ 46
7.2 Tools and Test Equipment .............................................................................................. 46
7.3 Preparation: Damage Indicators ..................................................................................... 46
7.4 Procedure........................................................................................................................ 47
7.5 Finalization ...................................................................................................................... 48
7.5.1 Mechanical Installers.......................................................................................... 48
7.5.2 FE Service Action, if Required ........................................................................... 48
7.5.3 FE Inspection Completion .................................................................................. 49
Section 8.0 Install Gantry Alignment Laser and Bracket .............................. 50
8.1 Time and Personnel ........................................................................................................ 50
8.2 Tools and Test Equipment .............................................................................................. 50
8.3 Procedure........................................................................................................................ 50
Section 9.0 Table Installation (GT1700V)........................................................ 54
9.1 Time and Personnel ........................................................................................................ 54
9.2 Tools and Test Equipment .............................................................................................. 54
9.3 Procedures...................................................................................................................... 54
9.3.1 Draw Table Reference Lines.............................................................................. 54
9.3.2 Table Prep and Set-up ....................................................................................... 55
9.3.3 Table Cover Removal ........................................................................................ 57
9.3.4 Removing the Accessory Rail Strip.................................................................... 58
9.3.5 Install the Table Cradle Laser Alignment Plates ................................................ 58
9.3.6 Level and Center the Table to the Gantry .......................................................... 59
9.3.6.1 Conditions .......................................................................................... 59
9.3.6.2 Specifications..................................................................................... 59
9.3.6.3 Procedure .......................................................................................... 59
9.3.7 Tighten the Lock Rings ...................................................................................... 62
Section 10.0 Table Installation (Lite Table) .................................................... 63
10.1 Time and Personnel ........................................................................................................ 63

GE COMPANY
DIRECTION 5472001-1EN, REVISION 6OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Table of Contents Page 15
Book 1 TOC
10.2 Tools and Test Equipment............................................................................................... 63
10.3 Procedures ...................................................................................................................... 63
10.3.1 Draw Table Reference Lines .............................................................................. 63
10.3.2 Cradle Center Procedure.................................................................................... 65
10.3.3 Install the Table Cradle Laser Alignment Plates................................................. 66
10.3.4 Level and Center the Table to the Gantry........................................................... 67
10.3.4.1 Conditions........................................................................................... 67
10.3.4.2 Specifications ..................................................................................... 67
10.3.4.3 Procedure........................................................................................... 68
Section 11.0 Drill the Anchor Holes............................................................... 69
11.1 Notes to Mechanical Installers......................................................................................... 69
11.2 Requirements .................................................................................................................. 69
11.3 Drilling Procedure (For Gantry and GT1700V Table) ...................................................... 70
11.4 Drilling Procedure (For Lite Table)................................................................................... 73
11.5 Gantry & Table (GT1700V) Alternate Anchor Holes........................................................ 75
11.6 Lite Table Redundant Anchor Holes................................................................................ 76
11.7 Install the Anchors (For Gantry and GT1700V Table) ..................................................... 77
11.8 Install the Anchors (For Lite Table).................................................................................. 79
11.9 Alignment Recheck.......................................................................................................... 80
11.10 Removing Table Shipping Dollies.................................................................................... 81
11.10.1 Time and Personnel............................................................................................ 81
11.10.2 Tools and Test Equipment.................................................................................. 81
11.10.3 Preparation ......................................................................................................... 81
11.10.4 Procedure ........................................................................................................... 81
Section 12.0 Rear Entry Cable Box................................................................. 83
12.1 Rear Entry with Surface Floor Duct ................................................................................. 84
Section 13.0 Install Table Footswitch Assembly (GT1700V)........................ 85
13.1 Time and Personnel......................................................................................................... 85
13.2 Tools and Test Equipment............................................................................................... 85
13.3 Procedure ........................................................................................................................ 85
Section 14.0 Install Table Footswitch Assembly (Lite Table) ...................... 89
14.1 Time and Personnel......................................................................................................... 89
14.2 Tools and Test Equipment............................................................................................... 89
14.3 Procedure ........................................................................................................................ 89
Section 15.0 Remove Gantry Tilt Bracket ...................................................... 91
15.1 Time and Personnel......................................................................................................... 91
15.2 Tools and Test Equipment............................................................................................... 91
15.3 Procedure ........................................................................................................................ 91
Section 16.0 Position the Power Distribution Unit........................................ 92
16.1 Time and Personnel......................................................................................................... 92
16.2 Tools and Test Equipment............................................................................................... 92
16.3 Procedure ........................................................................................................................ 92
Section 17.0 Install Operator Console............................................................ 96
17.1 Time and Personnel......................................................................................................... 96
17.2 Tools and Test Equipment............................................................................................... 96
17.3 Procedures ...................................................................................................................... 96
17.3.1 Install SWS table ................................................................................................ 96

GE COMPANY
DIRECTION 5472001-1EN, REVISION 6OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Page 16 Table of Contents
17.3.2 Peripherals Placement ....................................................................................... 96
Section 18.0 Seismic Mounting....................................................................... 97
18.1 Time and Personnel ........................................................................................................ 97
18.2 Procedures...................................................................................................................... 97
18.2.1 Console .............................................................................................................. 97
18.2.2 Power Distribution Unit....................................................................................... 98
Chapter 2
Power, Ground & Interconnect Cables ............................................................... 99
Section 1.0 Introduction................................................................................... 99
1.1 Cable Storage ................................................................................................................. 99
1.2 System Component Identification ................................................................................. 100
1.3 Cable Color Identifiers................................................................................................... 100
Section 2.0 System Interconnect Diagram................................................... 102
Section 3.0 Console Connections................................................................. 103
3.1 GSCB, Keyboard & Mouse Installation ......................................................................... 103
3.2 Connecting the Media Tower (5270510-20/-21/-22) ..................................................... 106
3.3 Connecting the LCD Monitor......................................................................................... 107
3.3.1 Connect Scan Monitor and Image Monitor for EIZO LCD:............................... 107
3.3.2 Connect Scan Monitor and Image Monitor for HP LCD: .................................. 108
3.3.3 LCD Video Monitor Setup ................................................................................ 109
3.4 Host Computer Connections ......................................................................................... 110
3.5 Switch Hub Connections ............................................................................................... 112
3.6 AC Box Connections ..................................................................................................... 113
3.7 Cable Arrangement ....................................................................................................... 114
Section 4.0 Install Options............................................................................. 115
4.1 Install USB Barcode Reader ......................................................................................... 115
4.2 Install Optional Remote Monitor.................................................................................... 115
4.3 Install Accessory I/F Hardware (IPC) Option ................................................................ 115
4.4 Install Respiratory Gating Option .................................................................................. 115
4.5 Install Injector Option .................................................................................................... 115
4.6 Install Cardiac Gating IVY Monitor and Stand Option ................................................... 115
4.7 Customer Accessories - Head Holders and Extender................................................... 116
4.8 UPS Installation............................................................................................................. 116
4.9 Flat Tabletop used with Respiratory Gating .................................................................. 116
4.10 SmartStep Installation ................................................................................................... 116
Section 5.0 Gantry Cable Connections......................................................... 117
5.1 Gantry Cable Connections ............................................................................................ 117
5.2 Cardiac Monitor Setup .................................................................................................. 120
5.3 Respiratory Monitor Setup (Version 1.7)....................................................................... 122
Section 6.0 Table Connections (GT1700V)................................................... 123
Section 7.0 Table Connections (Lite Table) ................................................. 124
Section 8.0
PDU Cable Connections & Configuration .................................................... 125
8.1 Introduction to NGPDU ................................................................................................. 125

GE COMPANY
DIRECTION 5472001-1EN, REVISION 6OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Table of Contents Page 17
Book 1 TOC
8.1.1 Panel - 380 - 480VAC Mains “TS1” Input Power Connection........................... 126
8.1.2 Panel - Circuit Breakers.................................................................................... 126
8.1.3 HVDC Connection ............................................................................................ 127
8.1.4 440V Connection .............................................................................................. 128
8.1.5 Gantry & Console Power Connections ............................................................. 128
8.1.6 PDU Control Cable ........................................................................................... 129
8.1.7 System Ground Connection.............................................................................. 129
8.1.8 Warning Light & Door Interlock Connections.................................................... 130
8.1.8.1 Warning Light Configuration & Connection ...................................... 130
8.1.8.2 Door Interlock Connections .............................................................. 131
Section 9.0 System Ground Connections.................................................... 132
Chapter 3
System Continuity & Ground Checks................................................................ 133
Section 1.0 System Continuity (Mechanical Contractor)............................ 133
1.1 Time and Personnel....................................................................................................... 133
1.2 Tools and Test Equipment............................................................................................. 133
1.3 Procedure ...................................................................................................................... 133
Section 2.0 Site Ground Continuity Check .................................................. 137
Section 3.0 Shim Installation......................................................................... 138
3.1 Time and Personnel....................................................................................................... 138
3.2 Tools and Test Equipment............................................................................................. 138
3.3 Preparation .................................................................................................................... 138
3.4 Procedure ...................................................................................................................... 139
3.5 Finalization..................................................................................................................... 140
Chapter 4
System Covers: Installation & Alignment ......................................................... 143
Section 1.0 Process Overview ...................................................................... 143
1.1 Gantry Front Cover Installation...................................................................................... 144
1.2 Gantry Rear Cover Installation ...................................................................................... 144
1.3 Gantry Bore Cover Installation....................................................................................... 144
1.4 Gantry Top Covers ........................................................................................................ 145
1.4.1 Installation......................................................................................................... 145
1.5 Gantry Side Covers ....................................................................................................... 145
1.5.1 Installation......................................................................................................... 145
1.6 Gantry Strap Installation ................................................................................................ 145
1.7 Scan Windows............................................................................................................... 147
1.7.1 Installation......................................................................................................... 147
1.8 Install Gantry Base Covers............................................................................................ 148
1.8.1 Tools Required ................................................................................................. 148
1.8.2 Procedure ......................................................................................................... 148
1.8.3 Footswitch Covers Installation (GT1700V) ....................................................... 149
Section 2.0 Install Console Covers............................................................... 150
2.1 Time and Personnel....................................................................................................... 150
2.2 Tools and Test Equipment............................................................................................. 150

GE COMPANY
DIRECTION 5472001-1EN, REVISION 6OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Page 18 Table of Contents
2.3 Procedures.................................................................................................................... 150
2.3.1 Console Side Covers ....................................................................................... 150
2.3.2 Console Top Cover .......................................................................................... 151
2.3.3 Console Front Cover ........................................................................................ 152
Section 3.0 Table Cover Installation (GT1700V) .......................................... 153
3.1 Side Covers................................................................................................................... 153
3.2 Install Panels................................................................................................................. 153
3.2.1 Top Panel #1.................................................................................................... 153
3.2.2 Bottom Panel #1............................................................................................... 153
3.2.3 Top Panel #2.................................................................................................... 154
3.2.4 Bottom Panel #2............................................................................................... 154
3.3 Re-install Side Panel..................................................................................................... 154
3.4 Table Side Covers Install .............................................................................................. 154
3.5 Table Side Covers Removal ......................................................................................... 154
Section 4.0 Table Covers Installation (Lite Table)....................................... 155
4.1 Table Base Cover ......................................................................................................... 155
4.2 Flapper Installation........................................................................................................ 155
4.3 Skirt Cover installation .................................................................................................. 156
4.4 Bottom cover installation ............................................................................................... 157
Section 5.0 Install All Option Covers............................................................ 158
Section 6.0 Electrical Power On & Ground Checks..................................... 158
6.1 Introduction and Flowchart............................................................................................ 159
6.2 Electrical Power On & Ground Checks Process Overview ........................................... 159
6.3 Required Tools.............................................................................................................. 159
6.4 Initial PDU Configuration............................................................................................... 159
6.4.1 Circuit Breakers................................................................................................ 159
6.4.2 Relay Board ..................................................................................................... 159
6.4.3 Power Switches................................................................................................ 160
6.4.4 Hardware and Connection Check .................................................................... 160
6.4.5 Covers.............................................................................................................. 160
6.5 Suite Emergency Off Checks ........................................................................................ 161
6.6 Line Transformer Settings............................................................................................. 161
6.6.1 Requirements................................................................................................... 161
6.6.2 Line Input Conditions ....................................................................................... 161
6.7 System Power-Up ......................................................................................................... 162
6.8 Install PDU Covers........................................................................................................ 165
6.8.1 Time and Personnel ......................................................................................... 165
6.8.2 Tools and Test Equipment ............................................................................... 165
6.8.3 Procedure......................................................................................................... 165
6.8.4 Emergency Stop Check ................................................................................... 165
Section 7.0 Mechanical Installation Completion Checklist......................... 167
Appendix A
Gantry Cover Removal and Dolly Setup ........................................................... 169
Section 1.0 Gantry Cover Removal............................................................... 169
1.1 Time & Personnel.......................................................................................................... 169
1.2 Tools and Test Equipment ............................................................................................ 169

GE COMPANY
DIRECTION 5472001-1EN, REVISION 6OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Table of Contents Page 19
Book 1 TOC
1.3 Procedures .................................................................................................................... 169
1.3.1 Gantry Scan Window ........................................................................................ 169
1.3.2 Side Cover Removal......................................................................................... 170
1.3.3 Top Cover Removal.......................................................................................... 171
1.3.4 Gantry Front Cover ........................................................................................... 172
1.3.5 Bore Cover Removal ........................................................................................ 183
1.3.6 Gantry Rear Cover............................................................................................ 186
Appendix B
Pictorial Representation of Required Tools...................................................... 189
Appendix C
Operating Table Installation and Adjustment ................................................... 193
Section 1.0
Smart Workspace Table Assembly and Adjustment .................................. 193
Appendix D
Remote Monitor Option Console Wiring ........................................................... 197
Section 1.0
Remote Monitor Wiring Overview................................................................. 197
Section 2.0
Wiring Installation .......................................................................................... 197
2.1 Power Down System ..................................................................................................... 197
2.2 Install 4-Way Splitter...................................................................................................... 198

GE COMPANY
DIRECTION 5472001-1EN, REVISION 6OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Page 20 Table of Contents
This manual suits for next models
4
Table of contents
Other GE Medical Equipment manuals

GE
GE CARESCAPE User manual

GE
GE Dash 3000 User manual

GE
GE Senographe 2000 D User manual

GE
GE b30 Assembly instructions

GE
GE Vivid P3 Installation and user guide

GE
GE LOGIQ e User manual

GE
GE SEER Light User manual

GE
GE Voluson 730 User manual

GE
GE Healthcare Portascan User manual

GE
GE Voluson 730Pro User manual
Popular Medical Equipment manuals by other brands

BodyCAP
BodyCAP P120GUI004 quick start

Edwards
Edwards Acumen IQ Cuff Setup guide

Health Medics
Health Medics Balance Disc instruction manual

Belmont
Belmont Phot-X II 303 Service manual

DPE Medical
DPE Medical DST 8000 Unpacking and assembly instructions

Winncare
Winncare VIRMEDIC BASICA E-130 Manual and warranty