GE Zenith Controls, Inc.
830 West 40th Street Chicago, IL 60609 / Telephone: (800) 63 -1 38 rev 9-5-2012
Power Quality
Y N NA
1 Verify that IMPORTANT SAFETY INSTRUCTIONS (Section 1) ha e been
re iewed.
2 Verify that the UPS is carefully unpackaged, inspected for damage, and
placed near the installation location.
3 Verify the proper size wires and circuit breakers are utilized.
4 Verify the proper input oltage installation procedures for 208-240 AC or
120 AC input are used to connect the UPS.
a. 4.4.1.1 Standard installation procedure: Vin 208-240Vac,
Vout 120/208/220/230/240Vac
b. 4.4.1.2 Installation procedure: Vin 120Vac (optional
5/6kVA), Vout 120/208/220/230/240Vac
Proper input oltage is connected to include the system ground
4 Referring to the following sections of the installation / user manual,
perform the hardware modifications required for the input oltage to be
applied.
1. 4.4.2 A ailable input oltages: hardware modifications
2. 4.4.2.1 Input oltage 208 or 240Vac
3. 4.4.2.2 Input oltage 120Vac (optional, 5/6kVA only)
5 Referring to the following sections of the installation / user manual,
perform the hardware modifications required for the output oltage
necessary for the critical load.
1. 4.4.3 A ailable output oltages: hardware modifications
2. 4.4.3.1 Output oltage 208Vac
3. 4.4.3.2 Output oltage 120Vac split-phase
4. 4.4.3.3 Output oltage 220/230/240Vac
5. 4.4.3.4 Output oltage 120Vac single phase
6 Referring to the following section of the installation / user manual, perform
the software modifications required for the input and output oltage
associated to any hardware modifications performed abo e.
4.4.4 Input / output oltages: Software modification
7 Referring to the following section of the installation / user manual, perform
the installation of the external battery pack(s).
4.4.5 Installation of GE Digital Energy LanPro-U battery extension pack(s)
8 Referring to the section 4.4.6 LanPro-11U series: 2 / 3 / 4 parallel
operating units – additional info, contact GE Power Quality ser ice with
any questions on the installation of a parallel system.
8 Referring to the section 5 of the installation / user manual, erify proper
operation of the GE LP11-U UPS.
If you ha e any questions or need to request onsite ser ice, please contact us at 800-637-1738
(Option 3).
Thank you for your business.