Special Adjustable Settings
The inverter has field adjustable setting like tripping point, tripping time, reconnect time, active and invalid of
QU/PU curves etc. by special firmware. Please contact GoodWe after-sales for the special firmware and adjust
methods.
Connection for SPLIT Grid System
In SPLIT grid system, there is a solution to
allow inverter work under on-grid condition
(Figure 2.4.3-1). For details, please check the
official application plan on website -GoodWe
Hybrid Solution For Split Grid Type.
Declaration For Back-Up Function
The below statement lays out GoodWe general policies governing the energy storage inverters of the series ES,
EM, SBP, ET, EH and BH.
• For Hybrid inverters (Series ES, EM, EH and ET), the standard PV installation typically consists of the connection
of the inverter with both panels and batteries. In case of systems not connected to the batteries, the Back-Up
function is strongly not advised to use. GoodWe shall not cover the standard warranty and be liable for any
consequences arising from users not following this instruction.
• Under normal circumstances, the Back-Up switching time is less than 10 ms (the minimal condition to be
considered as the UPS level). However, some external factors may cause the system to fail on Back-Up mode. As
such, we recommend the users to be aware of conditions and follow the instructions as below:
1. Do not connect loads if they are dependent on a stable energy supply for a reliable operation.
2. Do not connect the loads which may in total exceed the maximum Back-Up capacity.
3. Try to avoid those loads which may create very high start-up current surges such as Inverter Air-conditioner,
high-power pump etc.
4. Due to the condition of battery itself, battery current might be limited by some factors including but not
limited to the temperature, weather etc.
Note:If you don't use the back-up function or use on-grid power to charge the battery,the wiring
conduct core section can use 4-6mm
2
.
Note:
1. Please use the terminals in GoodWe
componets box;
2. Make sure cable jacket is not locked with
conductor.
Note:
1. Please use the terminals in GoodWe
componets box;
2. Make sure cable jacket is not locked with
conductor.
Note:Make sure it is connected to
‘On-Grid’side (other side
connected to public grid).
Note:Make sure the terminal cover is rightly
locked onto the terminal.
4mm
2
Copper Conductor Material Make sure terminal cover is locked up here.
10mm
Fastening
torsion 0.55-0.65N.m
Step 2 Step 3
Step 4
Step 1
Step 2 Step 3
Step 4
Prepare the AC cable according to the table.
1. Prepare the terminals and AC cables.
2. Put AC cable through terminal cover and
screw the three cables tightly on the
connectors.
1. Prepare the terminals and AC cables.
2. Put AC cable through terminal cover and
screw the three cables tightly on the
connectors.
Lock terminal cover and screw up the terminal cap.
Connect the assambled AC terminals
onto inverter.
Note:Make sure it is connected to
‘Back-Up’side (other side
connected to public grid).
Connect the assambled AC terminals
onto inverter.
Step 1
A B
D
C
A B
D
C
Grade
A
B
C
D
Description
Outside Diameter
Separated Wire Length
Conduct Wire Length
Conduce Core Section
Value
13~22mm
10~15mm
12~14mm
8~10mm
2
Grade
A
B
C
D
Description
Outside Diameter
Separated Wire Length
Conduct Wire Length
Conduce Core Section
Value
10~14mm
7~10mm
7~9mm
4~6mm
2
4mm
2
Copper Conductor Material
10mm
Fastening
torsion 0.55-0.65N.m
Note:Make sure the terminal cover is rightly
locked onto the terminal.
Make sure terminal cover is locked up here.
Lock terminal cover and screw up the terminal cap.
•
Back-Up wiring connection process is as below:
An external AC switch (≥32A) is needed for Back-Up connection to be isolated when necessary.
Note: The absence of AC breaker on Back-Up side will lead to inverter damage if only electricall short-circuit
happend on Back-Up side. And Back-Up function cannot turn off under on-grid condition.
220V Load
L1 L2 L1
N
L2
110V Load
CT1
CT2
N
‘To Smart Meter’
Smart Meter
12
11