GrainPro® TranSafeliner™ Instruction Manual (Accordion Method) MA4078RAD1219-00
2.2.2. Insert the nylon rope through all the woven
OPP tapes attached on one side the TSL
then into the hook found on the back end of
the container.
2.2.3. FOR TSL - 20
2.2.3.1. Hanging of liner should be done by
completing one side (left or right) of
the container first, starting from the
door towards the back and then going
around the perimeter of the container.
2.2.3.2. Follow procedure in 2.2.2. and when
one side is finised insert the the loose
end of the nylon rope to the hook on
the other side (back end hook) and
follow procedure 2.2.2. This time from
the back towards the front.
2.2.3.3. Pull the loose end of the nylon rope
to create tension and make sure that
there are no sagging sections on the
hanged TSL.
2.2.3.4. Secure the loose end of the nylon
rope on the hook found on the mid
section of the container door.
2.2.4. FOR TSL - 40
2.2.4.1. Hanging the liner should be done by
completing one side (left or right) of
the container first, starting from the
door towards the back of the
container. Two nylon ropes are
required to be used for the TSL - 40,
one for each side of the container.
2.2.4.2. Follow procedure in 2.2.2. until the
nylon rope is inserted through the rope
braces and hooks (front and back end
only) on one side of the container.
2.2.4.3. When one side of the container is
complete, pull the lose end of the
nylon rope towards the door of the
container and insert it through the first
hook found near the door.
2.2.4.4. Pull the loose end of the nylon rope
to create tension and make sure that
there are no sagging sections on the
hanged TSL.
2.2.4.5. Then secure the loose end of the
nylon rope on the hook found on the
mid- section of the container door.
2.2.4.6. Complete procedures 2.2.4.1 to
2.2.4.5 onto the other side of the
container.