
®
MBD-15 1
Document 464599
MBD-15
Extension Pin and Manual Quadrant Kit
Installation, Operation and Maintenance Manual
Please read and save these instructions for future reference. Read carefully before attempting to assemble, install, 
operate or maintain the product described. Protect yourself and others by observing all safety information. Failure 
to comply with these instructions will result in voiding of the product warranty and may result in personal injury 
and/or property damage.
CLOSED
OPEN
5
6
4
1
2
EXTENSION PIN
REAR VIEW
CONTROL SHAFT
3
7
For Dampers Installed In 
Ducts
Extended control shaft is 
installed from outside of duct 
after damper is installed. 
Install as shown to the right.
Crossover blade 
axle
DO NOT ATTACH 
control shaft here
Tools Required:
5⁄16 in. hex nut driver
3⁄8in. electric drill
1⁄2in. open end wrench
No. Qty Description
1 1 Standoff bracket
2 1 Extension pin
3 1 Retaining clip
4 1 1/2 in. Manual quadrant
5 1 Open and close labels
6 2 TEK screws
7 1 Washer
Before Installing Damper in the Duct
1. If damper has more than one blade, determine which 
blade axle will be driven by the extended control 
shaft. Always attach extended control shaft to a 
blade axle which is directly connected to the main 
linkage tiebar. DO NOT attach extended control shaft 
to a crossover blade axle.
2. Cut hole approximately 1 in. diameter in the duct 
where damper drive blade axle will be located. Hole 
must provide clearance for enlarged portion of the 
extended control shaft.
After Damper is Installed in Duct
1. Push extended control shaft through the hole in the 
duct and onto drive blade axle. Retainer clip should 
“click” into groove on the drive blade axle and hold 
shaft into place. Standard control shaft location is 
the third blade from the bottom on dampers with 
three or more blades. Control shaft location is the 
first blade from the bottom on dampers with one or 
two blades.
2. Install the stand off bracket with washer over the 
xtended control shaft and screw bracket to the duct. 
Make sure screws do not interfere with damper 
linkage or blade movement. Assemble manual 
quadrant to the extension bracket assembly (screws 
provided). 
3. With the damper either fully open or closed, lock 
manual quadrant to the extended control shaft so 
the manual quadrant can move the damper between 
open or closed. 
Note: Tighten down the bolt on manual quadrant to 250 
in. lb. of torque. Apply “OPEN” and “CLOSED” labels if 
damper movement is opposite to that engraved on the 
manual quadrant. 
4. Set the damper to the desired position and tighten 
wing nut on the manual quadrant to hold the damper 
in place.
Caution
Standoff bracket with the washer is needed to support 
the extended control shaft. If not installed as directed, 
the extended control shaft may not operate the damper 
correctly.