
STEP 6
1. Start With The Upper Cable 2330mm (52)
(a) With Upper Cable (52) in groove of Pulley (31), thread Upper Cable (52) through brackets
on Upper Cross Beam (09).
(b) Install Pulley No.1 (31) to Upper Cross Beam (09) using one M10x45mm Hex Bolt (58),
two M10 Washers (63) and one M10 Nylock Nut (66).
(c) Install Pulley No.2 (31) with two Pulley Fastness Bush (Big) (37) to Main Frame (03) using
one M10x65mm Hex Bolt (56), two M10 Washers (63) and one M10 Nylock Nut (66).
(d) Install Pulley No.3 (31) to Upper Cross Beam (09) using one M10x45mm Hex Bolt (58),
two M10 Washers (63) and one MI0 Nylock Nut (66). Attach the bolt end of Upper Cable
(52) to Selector Shaft (07) using one Plastic Washer (68), attach the other end of Upper
Cable (52) to High Pull (14) using one Pothook (47).
(e) Install Pulley No.4 (31) to
Reverse U
(17) using one M10x45mm Hex Bolt (58), two M10
Washers (63) and one M10 Nylock Nut (66).
2. Assembly The Cable 2720mm (51)
(a) Attach both end of Cable 2720mm (51) to Press Arm (R) (10) and Press Arm (L) (11) using
two Round Plug (46).
(b) With Cable 2720mm (51) in groove of Pulley (31) thread Cable (51) through brackets on
Main Frame (03).
(c) Install Pulley No.10 and No.12 (31) to Volitant U (19) using two M10x45mm Hex Bolts (58),
four M10 Washers (63) and two M10 Nylock Nut (66).
(d) Install Pulley No.11 (31) and
Pulley U
(18) using one M10x45mm Hex Bolt (58), two M10
Washers (63) and one M10 Nylock Nut (66).
3. Assembly The Gable 3750mm (50)
(a) With the Cable 3750mm (50) in groove of Pulley (31) through Leg Extension Frame (05).
(b) Install Pulley No.5 (31) with two Pulley Fastness Bush (small) (38) to Leg Extension
Frame (05) using one M10x60mm Hex Bolt (57), two M10 Washers (63) and one M10
Nylock Nut (66).
(c) Install Pulley No.6 (31) with two Pulley Fastness Bush (small) (38) to Front Support
Frame (04) using one M10x60mm Hex Bolt (57), two M10 Washers (63) and one M10
Nylock Nut (66).
(d) Install Pulley No.7 (31) with two Pulley Fastness Bush (Big) (37) to Main Frame (3) using
one M10x65mm Hex Bolt (56), two M10 Washers (63) and one M10 Nylock Nut (66).
(e) Install Pulley No.8 (31) and
Pulley U
(18) using one M10x45mm Hex Bolt (58), two M10
Washers (63) and one M10 Nylock Nut (66).
(f) Install Pulley No.9 (31) to Front Base Frame (01) using one M10x45mm Hex Bolt (58), two
M10 Washers (63) and one M10 Nylock Nut (66).
(g) Install Pulley No.13 (31) to
Reverse U
(17) using one M10x45mm Hex Bolt (58), two M10
Washers (63) and one M10 Nylock Nut (66). Attach the end of Cable 3750mm (50) to
Front Base Frame (01) using one Pothook (47), one Chain (53), one M8x40mm Hex Bolt
(61), two M8 Washer (64) and one M8 Nylock Nut (67).
(h) Attach the Low Pull (13) or Ankle Strap (43) to the other end of Cable 3750mm (50) using
two Pothooks (47) and one Chain (53).
NOW GO BACK OVER AND TIGHTEN ALL NUTS AND BOLTS.
EG12
ASSEMBLY STEPS