Keiser M3 User manual

EQUIPMENT YOU NEED
Before assembling your new Keiser M3 indoor cycle obtain the following tools:
Torque wrench (Minimum 45 Nm / 35 ft-lb)
4” extension
15mm open-end wrench
16mm, or 5/8” open-end wrench
#2 Phillips screwdriver
15mm crowfoot
16mm, or 5/8” crowfoot
5mm Allen Wrench
6mm Allen Wrench
Paste or spray wax (used to clean after assembly)
Clean cloth
NOTICE
Users, agents or anyone directing the use of this equipment shall determine the
suitability of the product for its intended use, and said parties are specifically put on
notice that they shall assume all risk and liability in connection herewith.
555500 B
UNPACKING THE BIKE
Carefully remove the bike from the cardboard box. Lay-out all the components and check to
assure all parts are present and undamaged. If parts are missing or damaged contact your
local dealer, distributor or Keiser Corporation Service Department.
NOTE: The substitution or modification of any part or component, other than what is
approved by Keiser, will void your warranty.
After unpacking and verifying parts, you are ready to start your assembly. You need an area
that is free of dirt, dust or other foreign material that could impair the assembly of your
bike.
Always follow the steps in this manual as you assemble your bike. Do not skip, substitute or
modify any steps or procedures of this assembly, as doing so could result in personal injury
and will void your warranty. We have put a number of precautions in this manual.
WARNING: Indicates a potentially hazardous situation which, if not avoided, could
result in serious injury. By not heeding these warnings, the warranty will be void.
NOTE: Informs you about things we recommend you do or are aware of, before performing
the assembly. These notes are placed in the manual to aid you during a certain procedure or
to make you aware of any general mandatory actions or information.
ASSEMBLY MANUAL
BEFORE ASSEMBLING
A
B
C
E
F
G
H
K
J
L
NOTE: Since we are always striving to improve our products; our products are
subject to change without notice.
CHECKING FOR PROPER OPERATION
Pre-Ride Checklist
Please inspect bike carefully and thoroughly before riding.
�All Parts Correctly Installed
�Acorn Nuts Torqued At 45 Nm (35 ft-lbs)
�Pedals Loctited and Torqued To 45 Nm (35 ft-lbs)
�All Screws and Nuts Properly Torqued and Tightened
�Handlebar and Seat Adjustments Operate Properly
�Bike Has Been Polished With Paste or Spray Wax and a Clean Cloth
� Computer Installed and Calibrated and In Working Order
(Models With Computers) (See “Calibrating The Computer”)
Test Ride
Your bike should now be ready to test ride.
1. Adjust the seat and handlebar for proper height and comfort.
2. Secure your feet in the pedals.
3. Move the shifter toward yourself and down and begin pedaling.
4. The computer should wake up and display “ODO” and total distance ridden
across the bottom. After approximately 10 secs “ODO” will change to gear
and trip.
5. Now move the shifter up and note the gear changing on the computer and the
resistance getting harder.
6. Ride at various speeds and resistances to check for noise and vibration.
7. Move the shifter to full forward position to check that the emergency brake
stops the flywheel from turning.
8. You have completed the test.
9. Enjoy your ride.
If you experience any problems please contact our Service Department
(USA) 1-800-888-7009 (International) 559-256-8000
www.keiser.com/service/
service@keiser.com
WARNING: Perform the operation below before riding to make sure
the bike is fully operational. Failing to test a bike prior to normal
use will void your warranty and could result in serious injury.
PARTS INVENTORY
A) Handlebar Assembly
B) Base Frame
C) Bike Frame
D) Flywheel
E) 2-Pedals/1-Loctite 242
F) Hubcap
G) 4 Acorn Nuts
H) 4 Washers
J ) 5 Socket Head Cap Screws
M6x1 X 20 SS
K ) 2 Socket Head Cap Screws
M8x1.25 X 12 SS
L) Computer (models with computer only)
(800) 888-7009 keiser.com

Assembling Bike to Base Frame
Step 1: Carefully lower the bike onto the base frame over the base screws, with
the front of the bike facing the transport wheels on the Base Frame. (Fig. 1)
Step 2: Insert one washer on each of the four base frame studs. (Fig. 1)
Step 3: Install the acorn nuts on the studs and hand tighten. Torque the acorn
nuts with a 16mm or 5/8” crowfoot and torque wrench to 45 Nm (35 ft-lbs) using a
16mm, or 5/8 inch open-end wrench to hold in position. (Fig. 2)
BIKE ASSEMBLY
To calibrate the computer:
The shifter lever must be in the down
position. Holding a pedal, rotate
the crank arm in any direction to
switch the computer on. Once the
computer is on, stop rotating the crank
arm. Move the shifter lever from full
bottom to full top a minimum of five times
(Fig. 12). When you see the computer
display a set of number fives (55:55)
in the time display, the computer is
calibrated.
3
56
WARNING!
Failing to install the pedals with
Loctite 242, or crossing the threads will
damage them, and could result in
serious injury to the user.
Mounting Handlebar Assembly
Step 1: Obtain the handlebar assembly, 6mm Allen wrench, and the socket head
cap screws (M8x1.25 X 12 SS). Observe the location of the two mounting flanges
on the handlebar post. Place the handlebar assembly on the post mounts, aligning
the mounting holes. (Fig. 10)
Step 2: Tilt the handlebar assembly slightly to place the socket head cap screws
(M8x1.25 X 12 SS) into the mounting holes (Fig. 11). Once each screw has been
started, place the palm of one hand on the center of the handlebar pressing firmly
and evenly onto the handlebar post. With the other hand tighten each screw with
the Allen wrench until the head of each screw just makes contact with each hole.
Now tighten each screw evenly.
11
NOTE: If installing the M3 computer please do so before mounting the handle-
bars. When the computer installation is complete please return to this step.
Mounting Computer (Models with computer)
Step 1: Obtain the #2 Phillips screwdriver and remove the computer mounting
screw from the handlebar tube.
Step 2: Coil the computer cable into the computer mount cavity (Fig. 8).
Step 3: Slide the computer up into the two locking ears. Insert and secure the
screw you removed in Step 1 using the #2 Phillips screwdriver (Fig. 9).
10
8
4
Assembling Flywheel, Hub, and Hub Cap
Step 1: Before starting the assembly of the flywheel, hub, and hub cap, make sure
that the shifter lever is in the downward position. (Fig. 3)
NOTE: Not following this step may scratch the flywheel.
Step 2: Remove the plastic wrapping from around the axle, hub, and hub cap.
Remove the hub cap. Obtain the 5 socket head cap screws (M6x1 X 20 SS)
and 5mm Allen wrench. (Fig. 4) Remove the flywheel from its foam envelope.
Assembling Pedal to Crank Arm
Step 1: Unwrap the pedal set and Loctite 242, obtain the Torque wrench, 15mm
crowfoot, 4” extension, and 15mm open-end wrench.
Step 2: With a clean cloth, wipe the threaded area of the pedals. Apply
Loctite 242 to the pedal threads. Install the pedals into the crank arms, use
the 15mm open-end wrench to tighten. Finish with the torque wrench, 15mm
crowfoot, and 4” extension. Torque pedals to 45 Nm (35 ft-lbs) (Fig. 7).
NOTE: Left pedal is LH threads and right pedal is RH threads.
7
1 2
9
Computer mounting screw
Calibrating the Computer (Models with computer)
NOTE: Use the foam envelope to handle the flywheel during assembly.
Step 3: Carefully slide the flywheel between the two magnets (Fig 4. & Fig. 5) and
onto the hub at the same time. Make sure that the flywheel is flush against the hub
and align the screw holes.
Step 4: Holding the flywheel in position with one hand, install the hubcap and
align the screw holes. Install the socket head cap screws (M6x1 X 20 SS). Using
the 5mm Allen wrench, tighten the screws in a star pattern until snug (as shown
in Fig. 6).
12
See back page for final check and operation.
Other manuals for M3
4
Table of contents
Other Keiser Exercise Bike manuals

Keiser
Keiser M3 User manual

Keiser
Keiser m3 TBT User manual

Keiser
Keiser M3i lite User manual

Keiser
Keiser M3 Troubleshooting guide

Keiser
Keiser M3i lite User manual

Keiser
Keiser M3X User manual

Keiser
Keiser REAR WHEEL DRIVE BIKE User manual

Keiser
Keiser M3 User manual

Keiser
Keiser M SERIES Installation and operating instructions

Keiser
Keiser M SERIES Installation and operating instructions