
8User’s Manual PCR-WE/PCR-WE2
Wiring the hard sensing and soft sensing functions..
88
Wiring the regulation adjustment function .............91
Compensation function setup procedure ..............92
Ending the use of the compensation function .......95
Using Power Line Abnormality Simulations..... 96
Power line abnormality simulation setup procedure..
98
Executing and stopping power line abnormality simu-
lations....................................................................99
Using the Harmonic Analysis Function.......... 100
Generating Special Waveforms (Waveform bank)
101
Setting the waveform bank..................................102
Generating special waveforms ............................103
Setting the Output Impedance....................... 104
Configuring Soft Start and Soft Stop ............. 105
Configuring soft start ...........................................105
Configuring soft stop ...........................................106
Selecting the Response................................. 107
Using the Power Management Functions...... 108
Sleep function .....................................................108
Power-saving function .........................................109
Power module management function..................110
Sequence Function
Sequence Overview ...................................... 111
Editing Steps ................................................. 116
Common items ....................................................116
[1] Frequency and AC voltage.............................117
[2] Execution time, waveform bank .....................118
[3] DC voltage, output .........................................119
[4] Status output, trigger output, trigger input (pause)
120
[5] Jump function.................................................122
[6] Starting phase angle, ending phase angle, sud-
den phase change...............................................123
[7] Output impedance (for single-phase output) ..124
[7] Output impedance (for single-phase three-wire
output and three-phase output, resistance compo-
nent) ....................................................................124
[8] Output impedance (for single-phase three-wire
output and three-phase output, reactance compo-
nent) ....................................................................124
[9] Phase difference for three-phase output ........125
Setting Sequence Conditions ........................ 127
Executing, Pausing, and Stopping Sequences....
128
Sequence Creation Tutorial........................... 129
Sequence creation basics ...................................131
Voltage sweep and frequency sweep .................134
Switching steps at specific phase angles............136
Suddenly changing the phase.............................139
Single-phase three-wire output and three-phase out-
put basics............................................................141
Phase setting for multi-phase output ..................142
Phase sweep ......................................................146
Line voltage dip...................................................148
External Control
Control Using Analog Signals.........................151
ANALOG IN connector pin arrangement ............152
Selecting the parameter to control ......................153
Amplifying the input waveform (EXTDC mode) ..154
Varying the output voltage or frequency using DC sig-
nals (VPROG mode) ...........................................157
Control Using Digital Signals..........................161
DIGITAL I/O connector pin arrangement and map-
ping .....................................................................162
Controlling the PCR-WE through external contacts..
165
Monitoring the operation status...........................170
Selectable I/O .....................................................173
Selectable signals when INP.SIG is selected .....175
Selectable signals when OUTP.SIG is selected .175
Parallel Operation
Configuring the Master and Slave Units.........177
Installation and Connection............................178
Installation...........................................................178
Connecting PCR-WEs together ..........................178
Turning the Power On and Checking the Opera-
tion..................................................................182
Connecting the OUTPUT terminal block and relay
terminals .............................................................182
Turning the power on ..........................................183
Operation Check .................................................183
Connecting the Load ......................................184
Ending parallel operation................................185
System Settings
Setting the Watchdog Protection (WDP) ........186
Displaying/Changing the Interface Settings ...187
Controlling the PCR-WE/WE2 from a PC ...........187
Displaying SCPI Errors...................................188
Factory Default Settings and Reset Settings..189
Factory default settings.......................................190