INSTALLATION INSTRUCTIONS FOR HEAT EXCHANGER REPLACEMENT KIT
USED ON LG/KG/ZG 036, 048, 060, 072, 074 PACKAGED ROOFTOP UNITS
507095-03
12/2020
Supersedes 507095-02
©2020
HEAT EXCHANGE
REPLACEMENT KIT
PACKAGED UNITS KITS
AND ACCESSORIES
Shipping and Packing List
Package 1 of 1 contains:
1- Heat exchanger assembly
1- Bag assembly containing:
22-Screws
1-CAB gasket
6-Seals (mastic)
5-Wire ties
1-Foam PVC tape (17” length)
Check packaging for shipping damage. Contact the last
carrier immediately if any shipping damage is found.
Application
See table for usage.
Cat. No. / Ass'y No. Heat Output
KBtuh Material
99W41 / 610414-01 150 Aluminized
99W42 / 610414-02 105/108 Aluminized
99W43 / 610414-03 65/70 Aluminized
10M86 / 610414-04 65/70 Stainless Steel
13J82 / 610414-05 105/108 Stainless Steel
13J83 / 610414-06 150 Stainless Steel
13U10 / 610414-07 108K NOX
ZG only Aluminum
16G31 / 610414-08 150K 4 Stg. Stainless Steel
WARNING
Improper installation, adjustment, alteration, ser
vice or maintenance can cause property damage,
personal injury or loss of life. Installation and ser
vice must be performed by a licensed professional
HVAC installer or equivalent, service agency, or the
gas supplier
CAUTION
As with any mechanical equipment, contact with
sharp sheet metal edges can result in personal in
jury. Take care while handling this equipment and
wear gloves and protective clothing.
LG/KG-Before Removing Heat Exchanger
Note - Do not damage roofing surface during
replacement.
1- Disconnect all electrical power to unit and turn off
main gas valve.
2- Disconnect power at the main breaker if the external
disconnect is installed on the gas inlet mullion.
3- Disconnect gas inlet pipe at gas valve.
4- Open or remove heat and compressor access
panels. See figure 1.
REMOVE PANELS - LG/KG
FIGURE 1
HEAT ACCESS
PANEL
COMPRESSOR
ACCESS PANEL
GAS INLET
MULLION
5- Remove the gas inlet mullion. See figure 1. If conduit
is run to the mullion, move the mullion out of the way.
Disconnect wiring and remove conduit if necessary.
6- Disconnect P19 from J19. See figure 2.
7- Disconnect wiring to ignitor, flame sensor,
combustion air blower prove switch, and flame rollout
switch. On LGH/KG/ZG units, disconnect wiring to
the primary limit. See figure 2. On LGM150 units,
remove the primary limit.
Note - Wires are marked for identification during
reassembly.
8- Remove the two screws securing the combustion air
blower prove switch. Discard the switch if tabs are
broken. Retain the switch for reassembly if tabs are
intact. See figure 2.
9- Disconnect the air tubing to the fitting on the
vestibule. See figure 3.